EWR2 – EWR Alliance Update

EWR2 – EWR Alliance Update

EWR2 – EWR Alliance Update Project Progress Completions: • Piling complete at Jarvis Lane, Grange Farm, Twyford, Moco Farm and Station Road overbridge • De-vegetation and rootball removal complete for 2020 season • Badger sett hard-stopping and destruction substantially complete • Archaeological investigation works complete at Charbridge Lane, A1 allotments and Winslow station • Bicester and Bletchley Compounds established, construction of remaining compounds at Winslow, Swanbourne, Whaddon Rd, Bletchley and Launton, Poundon/Marsh Gibbon, Twyford to be completed for year end • Ecologocial trapping and translocation completed ahead of hibernation season. • Salden Wood temporary drainage installed • Winslow cutting de-vegetation & rootball clearance completed • Demolition works completed at Swanbourne station and platforms, Verney Junction platforms, OXD16 Horwood Road (Winslow), Winslow footbridge OXD19 Notable Progress: • Highways interventions 32% complete • Installation of temporary boundary fencing 85% complete • Bridge refurbishments in progress on 14 bridges • Winslow cutting drainage in progress • Construction of temporary traffic diversion 1 (TD1) at Charbridge Lane in progress • Bletchley Flyover dismantling nearing completion and piling for new structure underway • Enabling works on Overhead Line of West Coast Main Line completing at Christmas / NY Progress Summary OXD35A Grange Farm OXD/29A Footbridge • Implementation Progress 2A Tythe Barn (North) A3 Compound Bicester Fringe OXD/36A Jarvis Lane Tythe Barn (South) A4 Compound Gas Slab TRD1 Charbridge Lane (North) OXD/34A Station Road OXD/34 HRA4 Ramp A4 Compound Bicester Fringe TRD1 Charbridge Lane (South) 4 Progress Summary B5 Compound • Implementation Progress 2B B3 Compound ECS B20 Winslow Cutting B4 Compound OXD/16 OXD/16 Crane Platform OXD/10 OXD/17-18 B6 Compound 5 Progress Summary • Implementation Progress 2C Cemex Pier 28 C1 Haul Road Eastern Embankment OLE Base Pier 26 dismantling ALO Barrier West Side Pier 30 6 Progress Summary • Implementation Progress SWO A3 Passing Bays B2-TA-09 HRC4 Signage A3-J-01 HRC4 A3 Passing Bays A3 Passing Bays B3 Passing Bays B3 Passing Bays HRC9 SGN Protection 7 Delivery Management • Since the last PAWG 4 weeks ago we have managed over 2500 deliveries • We continue to track a small minority of policy violations and continue to work with the supply chain to ensure compliance with requirements • We are looking at ways to integrate supply chain systems with our own to reduce the margin of error and mistakes being made • We are creating a geofenced grid of the allowable network to make it easy fot he drivers not to deviate from their journeys Overall Logistics Status • We have commissioned A1 Strategic Compound (Bicester) • We will be commissioning by 30 Nov B6 Strategic compound (Bletchley) • We are constructing compounds at A2, A3, A4, B3, B4, B5 at Launton, Marsh Gibbon, Poundon, Winslow, Little Horwood and Newton Longville. All will be ready by Jan 21. • We are reopening the SUSTRANS Rte 51 at Newton Longville on 11 Dec once our works are completed (weather dependent) • We have 6+ road sweepers operating on average • We have moved to a project wide waste management system ensuring fewer journeys and better waste management with a goal of 100% diversion from landfill • All our vehicles are now liveried and signage has been sent to the entire supply chain on an ongoing basis • We are increasing the number of bespoke and informative signs to ensure that businesses continue to operate with minimal disruption • We are procuring over £300,000 worth of highways signage and installation for the supply routes – but this has been heavily impacted due to COVID-19 and drops in productivity across the supply chain. Communications • Bletchley Christmas work • Murlsey by-way to re-open on 11 December • Joint HS2/EWR Calvert Box meeting 18 December • Aylesbury Grammar school Industrial cadets programme – EWRA mentoring Project Newsletter Analytics EWRA Complaints and queries summary Complaints Vs Queries 2020/2021 90 80 70 60 50 40 30 20 10 0 Mar-20 Apr-20 May-20 Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Complaints 3 5 9 31 34 52 37 74 83 17 Queries 0 0 8 5 18 28 55 68 80 23 Complaints Queries EWRA Complaints and queries summary 2A/2B/2C Split total 2020/2021 2A/2B/2C issues 2020/2021 Rolling 2A 2B 2C 100 90 80 70 60 13% 50 40 30 20 39% 10 0 Mar-20 Apr-20 May-20 Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 2A 0 0 7 4 14 12 18 66 90 22 2B 3 1 6 30 29 45 41 62 51 18 2C 0 4 4 2 9 23 8 12 16 3 48% 2A 2B 2C Complaints and Queries Procedure • All complaints/queries now reported into [email protected] from NR Helpline, Community Liaison Advisors (CLAs)/project teams or directly into the public information inbox • Communications Assistant, coordinating responses to all queries/complaints received into [email protected], • Weekly meeting held with EWR Co, Owner and Sponsors on key escalated complaints to ensure that the responses are aligned, all responses are managed by the Alliance Helpline • 24/7 Network Rail Helpline – 03457 11 41 41 • Online portal and live chat – www.networkrail.co.uk/contactus • Helpline takes call and logs all queries/complaints • Helpline will respond immediately if they can • If they cannot respond will send request to Alliance External Comms Manager/Community Liaison Exec for action/response • Relevant Manager from project leader or support function team may be involved to resolve issue Logistics & Traffic Management Street Sweeper Deployment across EWRA – 2A 2 x Street Sweepers on full time deployment 0730 – 1730 daily Perform at least 5 full circuits of identified areas Sweeper 2 each day EWRA Construction Sweeper 1 Works Highways Works (Additional Sweeper) Street Sweeper Deployment across EWRA – 2B 1/2 3 x Street Sweepers on full time deployment 0730 – 1730 daily Sweeper 2 Perform at least 5 full circuits of identified areas each day 1 evacuation turnaround at lunchtime Sweeper 1 EWRA Construction Works Highways Works (Additional Sweeper) Street Sweeper Deployment across EWRA – 2B 2/2 3 x Street Sweepers on full time deployment 0730 – 1730 daily Sweeper 3 Perform 4-5 full circuits of identified areas each day 1 evacuation turnaround at lunchtime Sweeper 2 EWRA Construction Works Highways Works (Additional Sweeper) EWRA - Proposed phasing of works and/or closures – 2A EXAMPLE PHASE - Phase 4 – 18/02/2021 to 24/02/2021 EWRA - Proposed phasing of works and/or closures – 2B (East) EWRA - Proposed phasing of works and/or closures – 2B (West) EXAMPLE PHASE - Phase 7 – 01/03/2021 to 07/03/2021 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    23 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us