The World Bank Report No: ISR6770 Implementation Status & Results India Tamil Nadu Irrigated Agriculture Modernization and Water-Bodies Restoration and Management Project (P090768) Operation Name: Tamil Nadu Irrigated Agriculture Modernization and Water- Project Stage: Implementation Seq.No: 10 Status: ARCHIVED Archive Date: 12-Dec-2011 Bodies Restoration and Management Project (P090768) Public Disclosure Authorized Country: India Approval FY: 2007 Product Line:IBRD/IDA Region: SOUTH ASIA Lending Instrument: Specific Investment Loan Implementing Agency(ies): Government of Tamil Nadu Key Dates Public Disclosure Copy Board Approval Date 23-Jan-2007 Original Closing Date 31-Mar-2013 Planned Mid Term Review Date 25-Sep-2009 Last Archived ISR Date 12-Dec-2011 Effectiveness Date 09-Apr-2007 Revised Closing Date 31-Mar-2013 Actual Mid Term Review Date 05-Mar-2010 Project Development Objectives Project Development Objective (from Project Appraisal Document) The proposed project development objective is for selected sub-basin stakeholders to increase irrigated agriculture productivity in a sustainable water resources management framework. Has the Project Development Objective been changed since Board Approval of the Project? Public Disclosure Authorized Yes No Component(s) Component Name Component Cost Irrigation systems modernization in a sub basin framework 282.83 Agricultural Intensification and Diversification 166.23 Institutional Modernization for Irrigated Agriculture 52.69 Project Management Support 8.32 WATER RESOURCES MANAGEMENT 5.00 Overall Ratings Previous Rating Current Rating Public Disclosure Authorized Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Overall Risk Rating Public Disclosure Copy Implementation Status Overview All contracts for civil works in Phase IV of the Project have been awarded and work is well advanced now in Phase III sub basins. Outstanding commitments on existing civil works Page 1 of 8 Public Disclosure Authorized The World Bank Report No: ISR6770 contracts come to approximately Rs. 700 cr. This pipeline of contract commitments will ensure a continued increase in the disbursement rate of the Project in the coming year. Despite the increase in implementation pace, it is now clear that the accumulated delays in implementation since project effectiveness cannot be overcome within the existing Closing Date of the Project of March 31, 2013 and the Government of Tamil Nadu and DEA have formally requested an 18 month extension in the Closing Date to September 30, 2014. This request for is under consideration by Bank management. The the participating line departments are making continued good progress in the field. By and large, the agreed targets for interventions are on track, and the reported yield and performance increases are encouraging. Agreements were reached during the January 2012 mission concerning the program of training for strengthening the operation of the Water Users' Associations (WUAs) and Participatory Irrigation Management (PIM). It was agreed that training for field engineers consistent with a comprehensive approach to water management at the local level should be initiated by April 15, 2012. Initiation of these trainings has been delayed. This situation needs to be addressed promptly by the Government to ensure that the project implementation plan moves forward as planned. Public Disclosure Copy Locations Country First Administrative Division Location Planned Actual India State of Tamil Nadu Vembar India Not Entered Vellar River India Not Entered Vellar River India Not Entered Varaha Nadi India Not Entered Vaniyar River India Not Entered Vaippar River India Not Entered Vaigai River India State of Tamil Nadu Uttarakosamangai India Not Entered Uppanar River India State of Tamil Nadu Tirunelveli India State of Tamil Nadu Thanjavur India State of Tamil Nadu State of Tamil Nadu India Not Entered Tambraparni River India Not Entered Sweta Nadi India State of Tamil Nadu Salem Public Disclosure Copy India State of Tamil Nadu Ramanathapuram Page 2 of 8 The World Bank Report No: ISR6770 Country First Administrative Division Location Planned Actual India State of Tamil Nadu Pudukkottai India Not Entered Ponnaiyar River India Not Entered Poini River India Not Entered Pambar River India Not Entered Palavar River India Not Entered Palar River Public Disclosure Copy India State of Tamil Nadu Ongur India State of Tamil Nadu Marandahalli India Not Entered Manimuttar India State of Tamil Nadu Madurai India State of Tamil Nadu Chennai India State of Tamil Nadu Krishnagiri India Not Entered Kottakkarai Ar India Not Entered Korampallam Tank India Not Entered Kodayar River India State of Tamil Nadu Kanniyakumari India Not Entered Gundar River India Not Entered Gomukha Nadi India Not Entered Gadilam River India State of Tamil Nadu Dharmapuri India State of Tamil Nadu Coimbatore India Not Entered Chittar River India Not Entered Arjuna Nadi Public Disclosure Copy India Not Entered Arani Nadi India Not Entered Aliyar River Page 3 of 8 The World Bank Report No: ISR6770 India State of Tamil Nadu Adyar River India State of Tamil Nadu Cooum River India State of Tamil Nadu Kosisttalaiyar River India State of Tamil Nadu Thoothukudi India State of Tamil Nadu Perambalur India State of Tamil Nadu Thiruvallur India State of Tamil Nadu Chennai Public Disclosure Copy India State of Tamil Nadu Vellore India State of Tamil Nadu Tiruvannamalai India State of Tamil Nadu Kancheepuram India State of Tamil Nadu Villupuram India State of Tamil Nadu Cuddalore India State of Tamil Nadu Sivaganga India State of Tamil Nadu Theni India State of Tamil Nadu Virudhunagar India State of Tamil Nadu Kambainallur Results Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Enhanced sustainable water resources Text Value State Water Framework and SWaRMA operations SWaRMA fully operational; At planning capacity Environmental Plans underway least 3 Sub-basin and 1 Basin prepared for most TN Basins; Board formed 2 existing Basin Boards Date 09-Apr-2007 07-May-2012 31-Mar-2013 Comments Core staffing completed. Increase in targeted farmers' incomes Text Value 0 30 50 Public Disclosure Copy compared to other (WOP) farmers (%) Date 09-Apr-2007 07-May-2012 31-Mar-2013 Page 4 of 8 The World Bank Report No: ISR6770 Comments Increase in HH income from agriculture, project vs. non- project tanks. From small sample survey in interim M&E Consultant Report. Increase in area under micro irrigation Text Value 0 20,746 ha 32,365 ha (hectares) Date 09-Apr-2007 31-Mar-2012 31-Mar-2013 Comments It was agreed during the MTR that the final traget for MIS would be reduced to 40,000 ha Public Disclosure Copy increase in value of crop produciton per unit of Text Value 0% Available data on yield 100% irrigation water supply (%) increases under the Project are in the 30-40% range. Date 09-Apr-2007 07-May-2012 31-Mar-2013 Comments The Project is encountering difficulty in obtaining needed precision in data on water use at the local level. Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target Project Management Support: Text Value MDPU setup with core staff MDPU fully staffed. Good MDPU fully staffed, Timely Multi-Disciplinary Project Unit (MDPU) and Project director in place. project oversight, FM reports and quality project oversight, adequately staffed with effective project No projects report up to date. Oversight, and and regular quarterly financial management (reporting,FM, Procurement) and regular quarterly financial reports and semi-annual monitoring reports submitted every six months reports and semi-annual monitoring reports monitoring reports Date 09-Apr-2007 07-May-2012 31-Mar-2013 Comments Water Resources Management: Text Value Initial GIS data collected for Data for 2 sub-basins under Basin Atlases and Plans Improved knowledge base and analytical all basins; fragmented the Hydrology II Project to be developed for 63 sub-basins; capacity development and use of IWRM modeling capacity utilized. Decision Support Systems and Structured Stakeholder Consultations for 3 sub- basins and 1 basin Date 09-Apr-2007 07-May-2012 31-Mar-2013 Comments Public Disclosure Copy Page 5 of 8 The World Bank Report No: ISR6770 Water Resources Management: Text Value Institute for Water Studies Staffing completed and Good-practice SWaRMA , State Water Resources Management Agency and State Surface and SWaRMA operational Basin Board, and analytical/ created and strengthened Groundwater data center in structured stakeholder Basin Boards set up and strengthenedfor place Basin Boards exist for processes functional; At least additional basins Palar and Tambiraparani 3 sub-basin and 1 Basin basins Board Setup Date 09-Apr-2007 07-May-2012 31-Mar-2013 Comments Institutional Modernization of Irrigated Text Value Fragmented training WUAs in SO training continuing, WUA 100% of targeted staff trained Agriculture: 2 sub-basins out of 63 project training underway, field About 2500 additional WUAs Staff training, Participatory irrigation sub-basins NO IMS engineer training behind set up in 60 project sub- Public Disclosure Copy management (WUAs), and Irrigation schedule. basins IMS fully operational: information management systems (IMS) 25% of officers able to use IMS Date 09-Apr-2007 07-May-2012 31-Mar-2013 Comments Training of WUAs is being rolled out. Agricultural Intensification and Diversification:
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages8 Page
-
File Size-