Bay Bridge Pump Station and Force Mains Replacement Project (Project No

Bay Bridge Pump Station and Force Mains Replacement Project (Project No

Bay Bridge Pump Station and Force Mains Replacement Project (Project No. 5-67) RECIRCULATED ENVIRONMENTAL IMPACT REPORT PUBLIC REVIEW DRAFT | JULY 2019 PUBLIC REVIEW DRAFT RECIRCULATED ENVIRONMENTAL IMPACT REPORT Bay Bridge Pump Station and Force Mains Replacement Project Lead Agency: ORANGE COUNTY SANITATION DISTRICT 10844 Ellis Avenue Fountain Valley, California 92708 Contact: Mr. Kevin Hadden Principal Staff Analyst 714.962.2411 Prepared by: MICHAEL BAKER INTERNATIONAL 5 Hutton Centre Drive, Suite 500 Santa Ana, California 92707 Contact: Mr. Alan Ashimine 949.472.3505 July 2019 JN 168975 This document is designed for double-sided printing to conserve natural resources. Recirculated Environmental Impact Report Bay Bridge Pump Station and Force Mains Replacement Project TABLE OF CONTENTS SECTION 1.0: EXECUTIVE SUMMARY ..................................................................... 1-1 1.1 Project Location ............................................................................................................................ 1-1 1.2 Project Summary ........................................................................................................................... 1-1 1.3 Goals and Objectives ................................................................................................................... 1-2 1.4 Environmental Issues/Mitigation Summary ............................................................................. 1-2 1.5 Summary of Project Alternatives .............................................................................................. 1-26 SECTION 2.0: INTRODUCTION AND PURPOSE .................................................... 2-1 2.1 Purpose of the EIR ....................................................................................................................... 2-1 2.2 Compliance with CEQA .............................................................................................................. 2-2 2.3 Initial Study/Notice of Preparation/Early Consultation (Scoping) ...................................... 2-4 2.4 Format of the Recirculated Draft EIR ...................................................................................... 2-5 2.5 Responsible and Trustee Agencies ............................................................................................. 2-6 2.6 Incorporation by Reference ........................................................................................................ 2-7 SECTION 3.0: PROJECT DESCRIPTION ................................................................... 3-1 3.1 Project Location and Setting ....................................................................................................... 3-1 3.2 Project Background ...................................................................................................................... 3-6 3.3 Project Characteristics .................................................................................................................. 3-7 3.4 Construction ................................................................................................................................ 3-16 3.5 Goals and Objectives ................................................................................................................. 3-31 3.6 Permits and Approvals ............................................................................................................... 3-31 SECTION 4.0: BASIS OF CUMULATIVE ANALYSIS ................................................. 4-1 SECTION 5.0: ENVIRONMENTAL ANALYSIS ......................................................... 5-1 5.1 Aesthetics/Light and Glare ...................................................................................................... 5.1-1 5.2 Air Quality ................................................................................................................................... 5.2-1 5.3 Biological Resources .................................................................................................................. 5.3-1 5.4 Cultural Resources ..................................................................................................................... 5.4-1 5.5 Geology and Soils ...................................................................................................................... 5.5-1 5.6 Greenhouse Gas Emissions ..................................................................................................... 5.6-1 5.7 Hazards and Hazardous Materials ........................................................................................... 5.7-1 5.8 Hydrology and Water Quality .................................................................................................. 5.8-1 5.9 Land Use and Relevant Planning ............................................................................................. 5.9-1 5.10 Noise .......................................................................................................................................... 5.10-1 5.11 Transportation .......................................................................................................................... 5.11-1 5.12 Tribal Cultural Resources ....................................................................................................... 5.12-1 SECTION 6.0: OTHER CEQA CONSIDERATIONS .................................................. 6-1 6.1 Short- and Long-Term Implications of the Proposed Project ............................................... 6-1 6.2 Significant Irreversible Environmental Changes That Would Be Involved in the Proposed Action Should It Be Implemented ................................................................ 6-1 Public Review Draft ● July 2019 i Table of Contents Recirculated Environmental Impact Report Bay Bridge Pump Station and Force Mains Replacement Project 6.3 Growth-Inducing Impacts ........................................................................................................... 6-2 6.4 Energy ............................................................................................................................................. 6-7 SECTION 7.0: ALTERNATIVES TO THE PROPOSED PROJECT .......................... 7-1 7.1 “No Project/Future Back Bay Landing Development” Alternative ..................................... 7-4 7.2 “Pump Station South Relocation” Alternative ....................................................................... 7-11 7.3 “Environmentally Superior” Alternative ................................................................................. 7-18 SECTION 8.0: EFFECTS FOUND NOT TO BE SIGNIFICANT .............................. 8-1 SECTION 9.0: ORGANIZATIONS AND PERSONS CONSULTED ......................... 9-1 SECTION 10.0: REFERENCES AND SOURCES CITED .......................................... 10-1 SECTION 11.0: APPENDICES (UNDER SEPARATE COVER AND CONTAINED ON CD) 11.1 Initial Study/Notice of Preparation and Comment Letters 11.2 Air Quality/Greenhouse Gas Emissions/Energy Data 11.3 Biological Resources Reports 11.4 Cultural/Paleontological Resources Assessment 11.5 Geology Report Public Review Draft ● July 2019 ii Table of Contents Recirculated Environmental Impact Report Bay Bridge Pump Station and Force Mains Replacement Project LIST OF EXHIBITS Exhibit 3-1 Regional Vicinity ................................................................................................................. 3-2 Exhibit 3-2 Site Vicinity .......................................................................................................................... 3-3 Exhibit 3-3 Existing Conditions ............................................................................................................ 3-4 Exhibit 3-4 Proposed Conceptual Site Plans ....................................................................................... 3-8 Exhibit 3-5 Original Northeast Pump Station Layout ....................................................................... 3-9 Exhibit 3-6 Northeast Pump Station Layout ..................................................................................... 3-12 Exhibit 3-7 South Pump Station Layout ............................................................................................ 3-15 Exhibit 3-8 Original Northeast Pump Station Work Areas ............................................................ 3-17 Exhibit 3-9 Original Northeast Pump Station Construction .......................................................... 3-18 Exhibit 3-10 Temporary Pipe Stringing Alignment Option .............................................................. 3-20 Exhibit 3-11 Modified Northeast Pump Station Work Areas ........................................................... 3-23 Exhibit 3-12 Modified Northeast Pump Station Construction (Dredging) .................................... 3-24 Exhibit 3-13 Modified Northeast Pump Station Construction (Microtunneling) .......................... 3-25 Exhibit 3-14 South Pump Station Work Areas ................................................................................... 3-27 Exhibit 3-15 South Pump Station Construction (Dredging) ............................................................. 3-29 Exhibit 3-16 South Pump Station Construction (Microtunneling) .................................................. 3-30 Exhibit 4-1 Cumulative Project Locations ..........................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    432 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us