1. Nit Header 2. Schedule 3. Item Breakup

1. Nit Header 2. Schedule 3. Item Breakup

WALTAIR DIVISION-ENGINEERING/ECOR TENDER DOCUMENT Tender No: eT-North-WAT_10-2018 Closing Date/Time: 19/07/2018 13:30 Sr.DEN/Co/WAT acting for and on behalf of The President of India invites E-Tenders against Tender No eT-North-WAT_10-2018 Closing Date/Time 19/07/2018 13:30 Hrs. Bidders will be able to submit their original/revised bids upto closing date and time only. Manual offers are not allowed against this tender, and any such manual offer received shall be ignored. Contractors are allowed to make payments against this tender towards tender document cost and earnest money only through only payment modes available on IREPS portal like net banking, debit card, credit card etc. Manual payments through Demand draft, Banker cheque, Deposit receipts, FDR etc. are not allowed. 1. NIT HEADER Construction of Limited Height Subway in view of closing of Manned Level Crossing No.RV-305 at Name of Work Km 413/15-17 between Bobbili - Donkinavalasa under the jurisdiction of Assistant Divisional Engineer/Rayagada on Raipur - Vizianagaram Line of Waltair Division. Bidding type Normal Tender Contract Type Works Tender Type Open Bidding System Single Packet System Tender Closing Date Time 19/07/2018 13:30 Date Time Of Uploading Tender 18/06/2018 18:09 Pre-Bid Required No Pre-Bid Query Date Time Not Applicable Advertised Value 47571853.79 Tendering Section NORTH Bidding Style Single Rate for Each Schedule Bidding Unit Earnest Money (Rs.) 387860.00 Validity of Offer ( Days) 45 Tender Doc. Cost (Rs.) 11800.00 Period of Completion 6 Months Are Joint Venture (JV) firms allowed Bidding Start Date 05/07/2018 No TO bid Ranking Order For Bids Lowest to Highest 2. SCHEDULE S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Above/ Schedule A-USSOR - 2010 items 12610296.28 Below/Par Please see Item Breakup for details. 12002099.28 AT Par 12002099.28 1 Item Description:- Execution of all items of works covered by Chapter 1-25 of USSOR-2010. Lump Sum 608197.00 AT Par 608197.00 2 Item Description:- Execution of all items of works covered by Unforeseen Miscellaneous items covered by Chapter 1 to 25 of USSOR-2010. S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Above/ Schedule B-FR items 8066671.59 Below/Par Please see Item Breakup for details. 8066671.59 AT Par 8066671.59 1 Item Description:- Execution of all items of works covered by FR items. S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Above/ Schedule C-FR items 6976569.60 Below/Par Please see Item Breakup for details. 6976569.60 AT Par 6976569.60 1 Item Description:- Execution of all items of works covered by FR items. S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Above/ Schedule D-Supply of cement 8007001.50 Below/Par Please see Item Breakup for details. 8007001.50 AT Par 8007001.50 1 Item Description:- Execution of all items of works covered by Supply of cement of Chapter No.3 of USSOR-2010. S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Above/ Schedule E-Supply of Steel 11911314.82 Below/Par Please see Item Breakup for details. 11911314.82 AT Par 11911314.82 1 Item Description:- Execution of all items of works covered by Supply of steel of Chapter No.4 of USSOR-2010. 3. ITEM BREAKUP Page 1 of 12 Run Date Time: 18/06/2018 18:10:27 WALTAIR DIVISION-ENGINEERING/ECOR TENDER DOCUMENT Tender No: eT-North-WAT_10-2018 Closing Date/Time: 19/07/2018 13:30 Schedule Schedule A-USSOR - 2010 items Item- 1 Execution of all items of works covered by Chapter 1-25 of USSOR-2010. S No. Item No Description of Item Unit Qty Rate Amount Earth work in excavation as per approved drawings and dumping at embankment site or spoil heap, within railway land, including 50m lead and 1.5m lift, the lead to be measured from the centre of gravity of excavation to centre of gravity of spoil heap: the lift to be measured from natural ground level and paid for in layers of 1.5m each, including incidental work, as per specifications-in 1 011011 All kinds of soils cum 7023.77 92.34 648574.92 2 011012 Ordinary Rock (Not requiring blasting) cum 5.00 268.50 1342.50 Extra for lead of earth work above initial lead of 50m, in all kind of soils and rocks : 3 011052 cum 30.00 66.50 1995.00 for every 50m or part thereof - lead over 150m and upto 500m ( X 7 ) 4 012010 Extra over item 011010 for excavation in foundations for cum 6427.04 9.50 61056.88 buildings and bridges to cover dressing to neat dimension and plumbing sides etc. Note : Dressing under this item is payable for the total quantity of excavation in foundation and not partly 5 012040 Filling, watering and ramming earth in 15 cm layers in floors cum 27.00 20.60 556.20 and foundations with surplus earth from foundations including 50m lead and 1.5m lift 6 012050 Supplying and filling sand in plinth and under floors including cum 51.00 635.64 32417.64 watering, ramming, consolidating and dressing complete 7 013120 Earthwork in filling in embankment, guide bunds, around cum 14.19 237.97 3376.79 buried type abutments, bridge gaps, trolley refuges, rain bunds if provided, platforms etc. with earth excavated from outside railway boundary entirely arranged by the contractor at his own cost as per RDSO's latest guidelines and specifications and special condition of contract including all leads, royalty, lifts, ascents, descents, crossing of nallahs or any other obstructions. The rates shall include all dressing of bank to final profile, demarcation and setting out of profile, site clearance, removing of shrubs, roots of vegetations growth, heavy grass, benching of existing slope of old bank, all handling/re-handling. taxes, octroi and royalty etc. as a complete job. Cut trees shall be property of railways and to be deposited in the railway godown unless specified otherwise in the Special conditions of contract 8 013130 Extra for mechanical compaction of earth/blanketing material cum 7.69 16.10 123.81 filled in embankment with contractor's rollers of suitable capacity, type and size to achieve specified density as per specification, testing as per IS codes incl. cost of water, T&P consumable material and all labour as a complete job. The work is to be executed as per Latest edition of "Guidelines for Earthwork in Railway Projects" issued by RDSO, Lucknow Providing and laying Jute Geo-Textile (JGT) in slopes of Railway embankment in accordance with RDSO's guidelines for application of Jute Geotextile in Railway embankments and hill slopes no. RDSO/2007/GE:G-0008 or its subsequent versions, including incidental earthwork and fixing arrangements 9 014062 With GJ - Type 2 100 Sqm 663.00 5009.20 33211.00 Providing and laying in position cement concrete of specified proportion excluding cost of cement, centering and shuttering - All works upto Plinth level : 10 031012 1:3:6 (1 cement : 3 sand : 6 graded stone aggregate 40mm cum 11.56 1917.59 22167.34 nominal size) Providing and laying cement concrete, up to plinth in retaining walls, walls (any thickness) including attached plasters, columns, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets etc, excluding the cost of cement and of shuttering, centering. Page 2 of 12 Run Date Time: 18/06/2018 18:10:27 WALTAIR DIVISION-ENGINEERING/ECOR TENDER DOCUMENT Tender No: eT-North-WAT_10-2018 Closing Date/Time: 19/07/2018 13:30 11 031022 1:3:6 (1cement : 3 sand : 6 graded stone aggregate 40mm cum 84.00 2233.56 187619.04 nominal size) 12 031023 1:2:4 (1 cement : 2 sand : 4 graded stone aggregate 20mm cum 147.85 2306.07 340952.45 nominal size) Providing and laying in position cement concrete of M 20 grade, excluding the cost of cement and of centering and shuttering, as per direction of the Engineer in charge : 13 031051 All works upto Plinth level cum 395.39 2211.07 874234.97 Centering and shuttering including strutting, propping etc. and removal of form work for : 14 031062 Retaining walls, return walls, walls (any thickness) including Sqm 1308.92 233.19 305227.05 attached plasters, buttresses, plinth and string courses fillets etc. 15 033130 Supplying & mixing high range poly carboxylate ether base Kg 47.00 99.58 4680.26 water reducing admixture Plast Super-C700 conforming to IS:9103-1999 (to be added @ 1% by weight of cement) for CC & RCC work for controlling water cement ratio and for gaining early strength Providing and laying in position M 20 Grade concrete for reinforced concrete structural elements but excluding cost of centering, shuttering, reinforcement and Admixtures in recommended proportion (as per IS:9103) to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge 16 041011 All work upto plinth level, including raft foundation of cum 1255.00 2492.74 3128388.70 washable aprons, HS tank, pile cap, footings of FOB, and Platform shelter etc. 17 041012 All work in buildings above plinth level upto floor two level. cum 1.40 2718.22 3805.51 Centering and shuttering including strutting, propping etc. and removal of form for : 18 042011 Foundations, footings, bases of columns, raft foundation of Sqm 1.60 139.90 223.84 washable aprons, Pile caps, Footings of FOB etc.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    12 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us