GOVERNMENT OF WEST BENGAL OFFICE OF THE SUPERINTENDING ENGINEER EASTERN CIRCLE PUBLIC WORKS DIRECTORATE NEW BUILDING COMPLEX (3rd floor) Deshbandhu Nagar, Baguiati (V.I.P. Road) Kolkata – 700 059 Ph. No. (033)257 60061, Fax No. (033)257 60062, E-mail: [email protected] Memo No:- 131/NIT-20 of 20-21 Date:-27/01/2020 1st CORRIGENDUM The undernoted amendments to this office Notice Inviting Tender No.WBPWD/SE/EC/NIT No. 21/2020-21. 1) Construction of Rigid Pavement Road from Chalk Factory and upto Swapan Biswas's House under Patulia Gram Panchayet during the year 2019-20 Sub Project ID- 202131826M001 and Construction of Concrete Pavement Road from Jharna Dutta's House and upto Biswanath Das's House at Saradapally under Patulia Gram Panchayet during the year 2019-20. Sub Project ID: PD202131826M002 (SL NO: 07) 2) Construction of Concrcrete Pavement Road over existing damaged road surface from Kalyani Express Way and upto Veri Gate Bazar under Patulia Gram Panchayats during the year 2019-20. (Sl No: 08) Sub Project ID: PD202131826M003 and Construction of Concrcrete road and drain for Madhab Sutradhar's house to Sudip Sardar's House via Sudhanshu Adhakari's House and by lanes under Patulia Gram Panchayat under Barrackpore Division, P.W.D. in the District of North 24 Parganas during the year 2019-20. (Sl No: 09) Sub Project ID: PD202131826M004. as circulated through this office memo no:- 1710/NIT-21 of 20-21 dated 31.12.2020 is notified for general information. Corrigendum of tender due to change of “Name of the work, Date & Time Schedule & Eligibility Criteria for Participation in the tender” Description In place of To be read as 1. Construction of Rigid Pavement 1. A) Construction of Rigid Pavement Road from Chalk Factory and upto Road from Chalk Factory and upto Swapan Biswas's House under Swapan Biswas's House under Patulia Patulia Gram Panchayet during the Gram Panchayet during the year year 2019-20 Sub Project ID- 2020-21 Sub Project ID- “Name of the 202131826M001 and Construction of 202131826M001 and B) Construction work” Concrete Pavement Road from of Concrete Pavement Road from Page No-1 of Jharna Dutta's House and upto Jharna Dutta's House and upto NIT Biswanath Das's House at Biswanath Das's House at Saradapally Saradapally under Patulia Gram under Patulia Gram Panchayet during Panchayet during the year 2019-20. the year 2020-21. Sub Project ID: PD202131826M002 Sub Project ID: PD202131826M002 (SL NO: 07) (SL NO: 07) 2. A) Construction of Concrcrete 2. Construction of Concrcrete Pavement Road over existing Pavement Road over existing damaged road surface from Kalyani damaged road surface from Kalyani Express Way and upto Veri Gate Express Way and upto Veri Gate Bazar under Patulia Gram Bazar under Patulia Gram Panchayats during the year 2020-21. Panchayats during the year 2019-20. (Sl No: 08) (Sl No: 08) “Name of the Sub Project ID: PD202131826M003 Sub Project ID: PD202131826M003 work” and B) Construction of Concrcrete and Construction of Concrcrete road road and drain for Madhab Page No-1 of and drain for Madhab Sutradhar's Sutradhar's house to Sudip Sardar's NIT house to Sudip Sardar's House via House via Sudhanshu Adhakari's Sudhanshu Adhakari's House and by House and by lanes under Patulia lanes under Patulia Gram Panchayat Gram Panchayat under Barrackpore under Barrackpore Division, P.W.D. Division, P.W.D. in the District of in the District of North 24 Parganas North 24 Parganas during the year during the year 2019-20. (Sl No: 09) 2020-21. (Sl No: 09) Sub Project ID: PD202131826M004 Sub Project ID: PD202131826M004 Description In place of To be read as “Date & Time Particulars Date & Time Particulars Date & Time Schedule” 5. Bid 5. Bid 27/01/2021 upto3.00 28/01/2021 Clause No- Submission/Upl Submission/Uploa p.m. upto3.00 p.m. 12,Page no 7 oad End Date d End Date of NIT 6. Date of 6. Date of opening opening of 29/01/2020 at 3.30 30/01/2020 at 3.30 of Technical Technical p.m. p.m. Proposals Proposals Description In place of To be read as “Eligibility N.B.: Estimated amount, Date of N.B.: i) Estimated amount, Date of Criteria for completion of project or percentage of completion of project or percentage of Participation physical progress of works for running physical progress of works for running in the tender” works, Value of Work done, Salient works, Value of Work done, Salient Vide clause feature & nature of the work executed feature & nature of the work executed is no. 3.0 is to be mentioned in the Credential to be mentioned in the Credential (NB),Page No. Certificate. Payment Certificate will Certificate. Payment Certificate will not 4 of NIT not be treated as Credential. be treated as Credential. Credential Credential Certificate issued by the Certificate issued by the Executive Executive Engineer or equivalent or Engineer or equivalent or competent competent authority of State/Central authority of State/Central Gov., Gov., State/Central Gov. undertaking, State/Central Gov. undertaking, Statutory/Autonomous Bodies Statutory/Autonomous Bodies constituted under the statute of the constituted under the statute of the Central / State Government will be Central / State Government will be taken as Credential. However, taken as Credential. However, Credential Certificate issued to sub- Credential Certificate issued to sub- contractor by Central or State Govt contractor by Central or State Govt undertaking/Govt Enterprise shall not undertaking/Govt Enterprise shall not be accepted. be accepted. ii) Executed value (without contractual percentage)of completed/running work will be taken as credential. iii) Work order of relevant work(s) duly authenticated by the bidder is to be submitted. All other details are correct. Sd/- Anjan Kumar Saha Superintending Engineer, Eastern Circle, P.W.Dte. Memo No:-131/1(3)-W Date:- 27/01/2021. Copy forwarded for favour of kind information to the:- 1. Engineer-in-Chief and Ex-Officio Secretary PWD & PW (Roads) Department, Government of West Bengal. 2. Chief Engineer (HQ), Public Works Department, Government of West Bengal. 3. Chief Engineer, South Zone, PWD. Sd/- Anjan Kumar Saha Superintending Engineer, Eastern Circle, P.W.Dte. Memo No:-131/1-W Date:-27/01/2021. Copy forwarded to the Joint Director of Information & Cultural Affairs Department, Writers’ Buildings, Kolkata – 700001 for information please. Sd/- Anjan Kumar Saha Superintending Engineer, Eastern Circle, P.W.Dte Memo No:-131/4(30)-W Date:-27/01/2021. Copy forwarded for information and wide circulation through his office NOTICE BOARD. I. Sabhadhipati, Barasat, 24Parganas (North), Barasat II. Hon’ble Member of Parliament, Dum Dum Constituency. III. Member of West Bengal Legislative Assembly Bidhannagar Constituency. IV. Superintending Engineer, P.W.D, Central Circle, Nabanna Circle, Southern Circle, Presidency Circle, Kolkata Health Circle, Southern Circle-Social Sector, Bidhan Nagar Circle. Southern Electrical Circle (Baguiati) V. Executive Engineer, P.W.D. Kolkata North Division, Barrackpore Division, Barasat Division To comply with the instruction vide this office memo no. 2169(7)Wdt. 03.12.2007 (IN DUPLICATE) . VI. Executive Engineer, North 24 Parganas, Electrical Division, PWD, Baguiati, Kolkata – 700 059 VII. Executive Engineer (EL), HQ & Planning, P.W.D. VIII. District Magistrate, Barasat, 24parganas (North) IX. Assistant Engineer, P.W.D. Barrackpore Sub-Division-I, II & III. X. Secretary, West Bengal Builders Association, 118 B. B. Ganguly Street, Kolkata. XI. KshudraThikadarSamity, 21/1/1 Creak Row, Kolkata – 700014. XII. District Contractor Association, Barasat, 24 parganas (North) . XIII. West Bengal Contractor Welfare Association, East Kulia Road, Kolkata – 700010. West Bengal Engineers Co-operative Fedaration Ltd. 29, Phears Lane, 1st. Floor, Kolkata – 700073 Sd/- Anjan Kumar Saha Superintending Engineer, Eastern Circle, P.W.Dte. .
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages4 Page
-
File Size-