KANAB MUNICIPAL AIRPORT AIRPORT MASTER PLAN 2016 35 South 400 West, Suite 200 St. George, UT 84770 p. 435.673.4677 www.jviation.com The preparation of this document was supported, in part, through the Airport Improvement Program financial assistance from the Federal Aviation Administration (Project Number 3-049-0013-013- 2015) as provided under Title 49 U.S.C., Section 47104. The contents do not necessarily reflect the official views or policy of the FAA. Acceptance of this Airport Layout Plan by the FAA does not in any way constitute a commitment on the part of the United States to participate in any development depicted therein nor does it indicate that the proposed development is environmentally acceptable or would have justification in accordance with appropriate public laws. Kanab Municipal Airport Master Plan EXECUTIVE SUMMARY FIGURE 1 NEW TERMINAL BUILDING ES-1 Kanab Municipal Airport Master Plan FIGURE 2 RECOMMENDED AIRCRAFT OPERATIONS FORECAST - KANAB AIRPORT 5,000 4,500 4,000 3,500 Operations 3,000 2,500 2,000 Source: Jviation. Note: Increase = 1.7% per year growth rate. ES-2 Kanab Municipal Airport Master Plan FIGURE 3 RECOMMENDED BASED AIRCRAFT FORECAST KANAB AIRPORT 35 33 31 29 27 25 23 Based Based aircraft 21 19 17 15 Source: Jviation. Note: Increase = 1.7% per year growth rate ES-3 Kanab Municipal Airport Master Plan FIGURE 4 RECOMMENDED AIRPORT DEVELOPMENT PLAN ES-4 Table of Contents Executive Summary 1.0 Study Introduction & Goals.............................................................................................. 1-1 1.1 Master Plan Purpose and Objectives .................................................................................. 1-1 1.2 Master Plan Study Elements .............................................................................................. 1-2 1.3 Overview of Airport Issues and Concerns............................................................................ 1-3 1.4 Master Plan Communication and Coordination ................................................................... 1-4 2.0 Inventory .......................................................................................................................... 2-1 2.1 Airport Overview .............................................................................................................. 2-1 2.2 Airport History .................................................................................................................. 2-1 2.3 Existing Documents ........................................................................................................... 2-3 2.4 Acquire Aerial Imagery and Base Mapping .......................................................................... 2-5 2.5 Existing Conditions ............................................................................................................ 2-7 2.6 Environmental Inventory & Data Collection ...................................................................... 2-20 2.7 Land Use Plan ................................................................................................................. 2-29 2.8 Demographics and Socioeconomic Analysis ...................................................................... 2-31 3.0 Aviation Activity & Forecasts ........................................................................................... 3-1 3.1 Introduction ..................................................................................................................... 3-1 3.2 Aviation Industry Trends ................................................................................................... 3-3 3.3 Historical Aviation Activity ............................................................................................... 3-11 3.4 Current Aviation Activity at KNB....................................................................................... 3-15 3.5 Previous Aviation Activity Projections .............................................................................. 3-19 3.6 Activity Forecast Periods ................................................................................................. 3-21 3.7 Forecast Scenarios for KNB .............................................................................................. 3-21 3.8 Preferred Aircraft Activity Projection................................................................................ 3-22 3.9 Comparison Between Recommended Forecast and FAA TAF ............................................. 3-24 1 Kanab Municipal Airport 2016 Airport Master Plan 3.10 Future Critical Design Aircraft, Airport Reference Code ..................................................... 3-25 4.0 Demand-Capacity Analysis and Airport Facility Requirements ...................................... 4-1 4.1 Introduction ..................................................................................................................... 4-1 4.2 Airside Facility Requirements............................................................................................. 4-4 4.3 Landside Facility Requirements ........................................................................................ 4-20 4.4 Non-Aeronautical Development....................................................................................... 4-23 4.5 Summary of Recommendations ..................................................................................... A-4-1 5.0 Alternatives Analysis ........................................................................................................ 5-1 5.1 Introduction ..................................................................................................................... 5-1 5.2 Preferred Alternatives ....................................................................................................... 5-4 6.0 Airport Financial Plan ....................................................................................................... 6-1 6.1 Introduction ..................................................................................................................... 6-1 6.2 Airport Capital Improvement Plan (CIP) .............................................................................. 6-2 6.3 Airport Development Plan ................................................................................................. 6-9 6.4 Airport Leases, Rates, and Charges..................................................................................... 6-9 6.5 Revenue Enhancement Options ....................................................................................... 6-15 6.6 Minimum Standards........................................................................................................ 6-17 6.7 Summary and Conclusions ............................................................................................... 6-19 7.0 Airport Recycling, Reuse, and Waste Reduction Plan..................................................... 7-1 7.1 Introduction ..................................................................................................................... 7-1 7.2 Airport Description and Background .................................................................................. 7-1 7.3 Existing Waste Sources ...................................................................................................... 7-2 7.4 Local Recycling and Waste Management Programs ............................................................. 7-2 7.5 Overview of Airport Recycling, Reuse, and Waste Management .......................................... 7-3 8.0 Airport Layout Plan Drawing Set ..................................................................................... 8-1 8.1 Introduction ..................................................................................................................... 8-1 8.2 Airport Layout Plan Drawing Set ........................................................................................ 8-1 2 Kanab Municipal Airport 2016 Airport Master Plan Figures Figure 2-1 – Kanab Municipal Airport Circa 1960 ......................................................................... 2-2 Figure 2-2 – Limits of FAA AC-18B AGIS Survey ............................................................................ 2-6 Figure 2-3 – Limits of ALP Mapping and One Foot Contours ......................................................... 2-6 Figure 2-4 – KNB Aerial, 2015 ..................................................................................................... 2-8 Figure 2-5 – KNB Terminal Area, 2015 ......................................................................................... 2-9 Figure 2-6 – KNB Airport Hangars ............................................................................................. 2-10 Figure 2-7 – Airspace in the Vicinity of KNB ............................................................................... 2-12 Figure 2-8 – Part 77 Surfaces .................................................................................................... 2-13 Figure 2-9 – Existing KNB Terminal Building ............................................................................... 2-14 Figure 2-10 – Proposed KNB Terminal Building .......................................................................... 2-15 Figure 2-11 – Proposed KNB Terminal Aerial Layout................................................................... 2-15 Figure 2-12 – All-Weather Wind Rose ......................................................................................
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages245 Page
-
File Size-