<p><strong>Nuclear Plant </strong></p><p><strong>Instrumentation & </strong><br><strong>Control </strong></p><p><strong>Journal </strong></p><p><strong>An International Publication Published in the United States </strong></p><p><strong>January-February, 2018 </strong><br><strong>Volume 36 No. 1 </strong></p><p><strong>Brunswick, USA </strong></p><p>ISSN: 2162-6413 </p><p><strong>What’s in a Name? </strong></p><p>Commitment. Sustainability. <strong>People. </strong></p><p>AREVA NP is now Framatome. We’re the same <strong>people </strong>you know and trust. For decades, Framatome has been improving the nuclear fleet and advancing nuclear energy throughout the world. That same experience, knowledge and passion in our people is what drives our company forward — always performing and delivering with excellence. </p><p><strong>Engineering • Fuel • Installed Base • I&C Component Manufacturing • Large Projects </strong></p><p>Your performance is our everyday commitment. </p><p><a href="/goto?url=http://www.framatome.com/us" target="_blank"><strong>ww</strong></a><a href="/goto?url=http://www.framatome.com/us" target="_blank"><strong>w</strong></a><a href="/goto?url=http://www.framatome.com/us" target="_blank"><strong>.</strong></a><a href="/goto?url=http://www.framatome.com/us" target="_blank"><strong>framatome</strong></a><a href="/goto?url=http://www.framatome.com/us" target="_blank"><strong>.</strong></a><a href="/goto?url=http://www.framatome.com/us" target="_blank"><strong>c</strong></a><a href="/goto?url=http://www.framatome.com/us" target="_blank"><strong>om</strong></a><a href="/goto?url=http://www.framatome.com/us" target="_blank"><strong>/</strong></a><a href="/goto?url=http://www.framatome.com/us" target="_blank"><strong>u</strong></a><a href="/goto?url=http://www.framatome.com/us" target="_blank"><strong>s </strong></a></p><p>© 2018 Framatome Inc. All rights reserved. </p><p>Got radiation? See what you’ve been missing </p><p>Photo c</p><p>Imaging in radiation environments just got easier </p><p>With superior capabilities for operating in radiation environments, the MegaRAD cameras provide excellent image quality well beyond dose limitations of conventional cameras, and are well suited for radiation hardened imaging applications </p><p>KiloRAD PTZ radiation resistant camera with Pan/Tilt/Zoom <br>MegaRAD3 produce color or monochrome video up to 3 x 10<sup style="top: -0.2392em;">6 </sup>rads total dose <br>MegaRAD1 produce monochrome video up to 1 x 10<sup style="top: -0.2392em;">6 </sup>rads total dose </p><p></p><ul style="display: flex;"><li style="flex:1">In the United States: </li><li style="flex:1">International: </li></ul><p></p><p>For customer service, call 1-800-888-8761 To fax an order, use 1-315-451-9421 <a href="mailto:[email protected]" target="_blank">Email: sales.cidtec@thermofisher.com </a><br>For customer service, call [01) 315-451-9410 To fax an order, use [01) 315-451-9410 <a href="mailto:[email protected]" target="_blank">Email: sales.cidtec@thermofisher.com </a></p><p>Find out more at <a href="/goto?url=http://thermofisher.com/cidtec" target="_blank">thermofisher.com/cidtec </a></p><p>For Research Use Only. Not for use in diagnostic procedures. © 2017 Thermo Fisher Scientific Inc. All rights </p><p>reserved. All trademarks are the property of Thermo Fisher Scientific and its subsidiaries unless otherwise specified </p><p><a href="/goto?url=http://nuclearsupplier.com/" target="_blank">nuclearsupplier.com </a></p><p>A Nuclear Plant Journal offering: </p><p>• Online product and service listings • Product/service search • Organization search • Enhanced listing options </p><p><strong>Nuclear Plant Journal </strong></p><p><strong>An International Publication Published in the United States </strong></p><p><a href="/goto?url=http://nuclearsupplier.com/" target="_blank"><strong>nuclearsupplier.com • </strong></a><a href="mailto:[email protected]" target="_blank"><strong>[email protected] </strong></a><strong>• (630) 352-3686 </strong></p><p><strong>Nuclear Plant Journal</strong><sup style="top: -0.9771em;"> </sup></p><p>January-February 2018, Volume 36 No. 1 </p><p><strong>36th Year of Publication </strong></p><p><strong>Instrumentation & </strong><br><strong>Control </strong></p><p><strong>Articles & Reports </strong></p><p></p><ul style="display: flex;"><li style="flex:1"><strong>Cable Aging Management in Nuclear Power Plants </strong></li><li style="flex:1"><strong>20 </strong></li></ul><p><strong>22 24 27 </strong></p><p><em>Nuclear Plant Journal </em>is published by </p><p>EQES, Inc. six times a year. It is mailed in February,April, June,August, October, and December (the Annual Directory). </p><p>By H.M. Hashemian, AMS Corporation </p><p><strong>Need for Marketplace Recognition </strong></p><p>By Maria Korsnick, Nuclear Energy Institute </p><p>The subscription rate for non-qualified readers in the United States is $210.00 for six issues per year. The additional air mail cost for non-U.S. readers is $30.00. Payment may be made by American Express<sup style="top: -0.2658em;"></sup>, Master Card<sup style="top: -0.2658em;"></sup>,VISA<sup style="top: -0.2658em;"> </sup>or check and should accompany the order. Checks may be made payable to "EQES, Inc." Checks not drawn on a United States bank should include an additional $45.00 service fee. All inquiries should be ad- </p><p>dressed to <em>Nuclear Plant Journal, </em>3051 </p><p>Oak Grove Road, Suite 107, Downers Grove, IL 60515 U.S.A; Phone: (630) 858-6161, ext. 103; Fax: (630) 852-8787, <a href="mailto:[email protected]" target="_blank">email: [email protected]. </a></p><p><strong>Leveraging U.S. Research Expertise </strong></p><p>By Rita Baranwal, Idaho National Laboratory </p><p><strong>Gen III Passive Nuclear Power Technology </strong></p><p>By Zheng Mingguang, Shanghai Nuclear Engineering Research & Design, China </p><p><strong>The Challenges of Greater Safety </strong></p><p>By Thomas Fink, SCHOTT, Germany </p><p><strong>29 31 33 </strong><br><strong>EPC Success </strong></p><p>By Ty Troutman, Bechtel </p><p><strong>Extending the Calibration Intervals of Process Instruments </strong></p><p>By Brent. D. Shumaker, AMS Corporation </p><p></p><ul style="display: flex;"><li style="flex:1"><strong>TVA’s Clinch River Site SMR Project </strong></li><li style="flex:1"><strong>42 </strong></li></ul><p></p><ul style="display: flex;"><li style="flex:1"><strong>44 </strong></li><li style="flex:1"><strong>Hanhikivi 1 </strong></li></ul><p></p><p>By Jouni Sipiläinen, Fennovoima, Finland </p><p>33 years of Journal issues are available online through the Journal website <strong>www. </strong></p><p><strong>NuclearPlantJournal</strong>.com (search box </p><p>on the right-top) for a nominal fee of $25 per issue. Contact: Anu Agnihotri, email: <a href="mailto:[email protected]" target="_blank">[email protected]. </a></p><p><strong>Industry Innovations </strong></p><p></p><ul style="display: flex;"><li style="flex:1"><strong>Ultra-High Pressure Cavitation Peening </strong></li><li style="flex:1"><strong>36 </strong></li></ul><p><strong>40 47 </strong></p><p>By Exelon Nuclear and AREVA </p><p><strong>Importance of Reverse Engineering in Obsolescence </strong></p><p>By Faisal Salman and Nick Dagres, Hydro, Inc. </p><p><strong>BWR Core Shroud UT Examinations </strong></p><p>By Steven Williams, Duke Energy Progress </p><p>© Copyright 2018 by EQES, Inc. ISSN: 2162-6413 </p><p><strong>Journal Services </strong></p><p><strong>nuclearsupplier.com List of Advertisers Advertiser Web Directory March-April 2018 </strong></p><p><strong>Departments </strong></p><p></p><ul style="display: flex;"><li style="flex:1"><strong>New Energy News </strong></li><li style="flex:1"><strong>10 </strong></li></ul><p><strong>11 </strong><br><strong>4</strong></p><p><em>Nuclear Plant Journal </em>is a registered </p><p>trademark of EQES, Inc. </p><p></p><ul style="display: flex;"><li style="flex:1"><strong>Utility, Industry & Corporation </strong></li><li style="flex:1"><strong>6</strong></li></ul><p></p><ul style="display: flex;"><li style="flex:1"><strong>6</strong></li><li style="flex:1"><strong>New Products, Services & </strong></li></ul><p><strong>Contracts </strong></p><p>Published and printed in the USA. </p><p><strong>15 18 19 </strong><br><strong>7</strong></p><p><strong>Staff </strong></p><p><strong>New Documents </strong></p><ul style="display: flex;"><li style="flex:1"><strong>Cost-free Digital </strong></li><li style="flex:1"><strong>26, 46 </strong></li></ul><p><strong>32 </strong></p><p><em>Senior Publisher and Editor </em></p><p>Newal K. Agnihotri, P.E. </p><p><strong>Meeting & Training Calendar </strong><br><strong>Editorial Calendar </strong></p><p><em>Publisher and Sales Manager </em></p><p>Anu Agnihotri </p><p><strong>On The Cover </strong></p><p>To comply with the interim guidance issued in March 2016, the Brunswick Nuclear Power Plant (BNP) owned and operated by Duke Energy Progress (DUKE) established a project team with AREVA to proactively address the interim guidance requirements for implementation in the Spring 2016 refuel outage. See page 47 for more. </p><p><em>Assistant Editor and Marketing Manager </em></p><p>Michelle Gaylord </p><p><strong>Current Circulation: </strong></p><p><strong>Mailing Identification Statement </strong></p><p>Total: Utilities: <br>12,273 2,904 </p><p><em>Nuclear Plant Journal </em>(ISSN 0892-2055) is published bimonthly. It is mailed in February, <br>April, June, August, October, and December by EQES, Inc., 3051 Oak Grove Road, Suite 107, Downers Grove, IL 60515 U.S.A. The printed version of the Journal is available cost-free to qualified readers in the United States, Canada, China, India and the United Kingdom. The digital version is available cost-free to qualified readers worldwide. The subscription rate for non-qualified U.S. readers is $210.00 per year. The cost for non-qualified, non-U.S. readers is $240.00. Periodicals (permit number 000-739) postage paid at the Downers Grove, IL 60515 and additional mailing offices. POSTMASTER: Send address changes to <em>Nuclear Plant Journal </em>(EQES, Inc.), 3051 Oak Grove Road, Suite 107, Downers Grove, IL 60515, U.S.A. </p><p></p><ul style="display: flex;"><li style="flex:1">Nuclear Plant Journal, January-February 2018 </li><li style="flex:1">NuclearPlantJournal.com </li><li style="flex:1">5</li></ul><p></p><p><strong>List of Advertisers </strong></p><p></p><ul style="display: flex;"><li style="flex:1"><strong>Page Advertiser </strong></li><li style="flex:1"><strong>Contact </strong></li><li style="flex:1"><strong>Fax/Email </strong></li></ul><p></p><p><a href="mailto:[email protected]" target="_blank">[email protected] </a><br>(215) 721-1101 <br>25 49 13 2</p><ul style="display: flex;"><li style="flex:1">Bechtel Power </li><li style="flex:1">Jared DeMeritt </li></ul><p></p><ul style="display: flex;"><li style="flex:1">Les Burns </li><li style="flex:1">Curtiss-Wright EST Group </li></ul><p>Endeavor Robotics Framatome </p><p>Jeff Ostaszewski <a href="mailto:[email protected]" target="_blank">[email protected] </a></p><p>Donna Bowen Faisal Salman Curtis Roberts Chris Attaway <br>(434) 832-3840 <a href="mailto:[email protected]" target="_blank">[email protected] </a><a href="mailto:[email protected]" target="_blank">[email protected] </a><br>(713) 507-4242 <br>8-9 HydroAire Service, Inc. 52 35 3<br>Orano group Reef Industries, Inc. Thermo Scientific- CIDTEC Tony Chapman Westinghouse Electric <br>(315) 451-9421 <br>51 </p><ul style="display: flex;"><li style="flex:1">Company LLC </li><li style="flex:1">Emily Ammerman </li><li style="flex:1">(412) 374-3244 </li></ul><p></p><p>Advertisers’ fax numbers as given above may be used with the form shown below. </p><p>January-February 2018 </p><p><strong>Nuclear Plant Journal Rapid Response Fax Form </strong></p><p>To: _________________________ Company: __________________ Fax: ___________________ From: _______________________ Company: __________________ Fax: ___________________ Address:_____________________ City:_______________________ State: _____ Zip:_________ Phone: ______________________ E-mail:_____________________ </p><p>I am interested in obtaining information on:__________________________________________________ Comments: _____________________________________________________________________________ </p><p><strong>Nuclear Plant Journal Advertiser Web Directory </strong></p><p><strong>Bechtel Power </strong></p><p><a href="/goto?url=http://www.bechtel.com/nuclear" target="_blank">www.bechtel.com/nuclear </a></p><p><strong>Framatome </strong></p><p><a href="/goto?url=http://www.framatome.com/" target="_blank">www.framatome.com </a></p><p><strong>Reef Industries, Inc. </strong></p><p><a href="/goto?url=http://www.reefindustries.com/" target="_blank">www.reefindustries.com </a></p><p><strong>Curtiss-Wright EST Group </strong></p><p><a href="/goto?url=http://www.cw-estgroup.com/" target="_blank">www.cw-estgroup.com </a></p><p><strong>HydroAire Service, Inc. </strong></p><p><a href="/goto?url=http://www.hydroinc.com/" target="_blank">www.hydroinc.com </a></p><p><strong>Thermo Scientific- CIDTEC </strong></p><p><a href="/goto?url=http://www.thermo.com/cidtec" target="_blank">www.thermo.com/cidtec </a></p><p><strong>Endeavor Robotics </strong></p><p><a href="/goto?url=http://www.endeavorrobotics.com/" target="_blank">www.endeavorrobotics.com </a></p><p><strong>Orano group </strong></p><p><a href="/goto?url=http://www.orano.group/" target="_blank">www.orano.group </a></p><p><strong>Westinghouse Electric Company LLC </strong></p><p><a href="/goto?url=http://www.westinghousenuclear.com/" target="_blank">www.westinghousenuclear.com </a></p><p></p><ul style="display: flex;"><li style="flex:1">6</li><li style="flex:1">NuclearPlantJournal.com </li><li style="flex:1">Nuclear Plant Journal, January-February 2018 </li></ul><p></p><p><strong>Nuclear Plant </strong></p><p>March-April 2018 </p><p><strong>Journal </strong></p><p><strong>An International Publication Published in the United States </strong></p><p>The Plant Maintenance & PLEX issue: </p><p>• Editorial focus on plant maintenance and plant life extension • 12,000+ circulation • Additional cost-free digital marketing opportunities • Enhanced features in the digital version of the issue (audio, video, presentations, etc.) </p><p><a href="/goto?url=http://nuclearplantjournal.com/" target="_blank"><strong>nuclearplantjournal.com • </strong></a><a href="mailto:[email protected]" target="_blank"><strong>[email protected] </strong></a><strong>• (630) 364-4780 </strong></p><p><strong>Engineering Pumps </strong></p><p><strong>for better performance and longer life </strong></p><p>Engineering makes all the difference. </p><p>As the largest independent pump rebuilder in the industry, Hydro has a unique capability of analyzing and understanding various OEM designs through unbiased review and analysis. Our engineering team works hand-in-hand with our valued customers to optimize the performance and reliability of their pumping systems by evaluating and understanding root causes of pump degradation and failure. By understanding the unique characteristics of the pump’s application and applying our hydraulic, mechanical and materials knowledge, Hydro’s engineers can make recommendations for restoring and improving the pump to achieve optimal performance and longer life. Our worldwide service centers are equipped with experts and equipment to handle the most complex challenges and respond to critical emergencies. With over 45 years of experience, we do it right - the first time. </p><p>Hydro provides independent, unbiased engineering expertise and support to pump users around the world for better performance and longer life. </p><p><strong>WORLDWIDE PUMP SERVICES </strong></p><p>• Emergency Response • Code, Safety & Non Safety Pump Repair • Engineering Services • Reverse Engineering • Parts Solutions • Certified Performance Testing • Contaminated Pump Services • Condition-based Monitoring • 24/7 Field Services • Pump Training Programs </p><p><a href="/goto?url=http://hydroinc.com/" target="_blank"><strong>Worldwide Service Centers</strong></a><a href="/goto?url=http://hydroinc.com/" target="_blank"><strong> </strong></a><a href="/goto?url=http://hydroinc.com/" target="_blank"><strong>l 800.223.7867 l hydroinc.com </strong></a></p><p><em>Contact: </em><strong>CNNC</strong><em>, telephone: 86 10 </em>Building Liner Dome section was </p><p><strong>New Energy </strong></p><p><em>68512211, fax: 86 10 68533989. </em></p><p>installed and concrete pouring for the dome was completed on Unit 3, and the Reactor Containment Liner Plate Rings, </p><p><strong>Flamanville </strong></p><p>On January 6, 2018, <strong>EDF </strong>completed Reactor Vessel, Steam Generators and the cold functional test phase for the Condenser were installed on Unit 4. Flamanville EPR. This stage is part of Meanwhile, testing and commissioning the system performance testing, which activities are progressing on Units 1 and started in the first quarter of 2017, to 2. </p><p><strong>Chashma </strong></p><p>Wang Shoujun, chairman of </p><p><strong>China National Nuclear Corporation </strong></p><p>(CNNC), signed a cooperation agreement with Muhammad Naeem, chairman of Pakistan Atomic Energy Commission (PAEC), on the construction of Unit 5 of Chashma Nuclear Power Plant (C- 5) on Nov 21, 2017 which is a great achievement the Chinese nuclear industry has made in 2017. check and test operation of all the EPR systems. </p><p><em>Contact: ENEC, email: media@ </em></p><p><em>enec.gov.ae . </em></p><p>This cold functional test phase, which started on December 18, 2017, <strong>Paks </strong></p><p>saw the successful completion of the <strong>Rolls-Royce </strong></p><ul style="display: flex;"><li style="flex:1">has </li><li style="flex:1">signed </li><li style="flex:1">a</li></ul><p>leak performance test on the primary Memorandum of Understanding with system at a pressure greater than 240 bar Hungarian state-owned MVM OVIT (higher than the pressure of this system National Power Line Company Ltd, part in operation). More than 500 welds of the MVM Group, to explore how they were inspected during this hydrostatic can work together on the provision and testing, supervised by the Nuclear Safety maintenance of Instrumentation and <br>According to the agreement, CNNC will build a one-million-kilowatt-class nuclear power unit with HPR 1000 technology at the Chashma Nuclear Power Plant in Pakistan. It is the seventh nuclear power unit that China has exported to Pakistan and the third unit exported with HPR 1000 technology. </p><ul style="display: flex;"><li style="flex:1">Authority. </li><li style="flex:1">control (I&C) systems for the second </li></ul><p>EDF is now preparing hot functional reactor planned to be built at the Paks testing to be started in July 2018. The nuclear Power Plant in Hungary. </p><ul style="display: flex;"><li style="flex:1">objective is to demonstrate the good </li><li style="flex:1">Paks currently comprises four </li></ul><p>working order of the plant by testing Russian-supplied VVER-440 pressurized components with temperature and water reactors, which became operational pressure levels similar to operating between 1982 and 1987. These units </p><ul style="display: flex;"><li style="flex:1">HPR 1000, </li><li style="flex:1">a</li><li style="flex:1">third-generation </li></ul><p>pressurized water reactor independently developed by domestic research teams, is a key project in promoting the implementation of the Made in China 2025 initiative, and a driving force in realizing the country’s “going global” strategy. </p><ul style="display: flex;"><li style="flex:1">conditions. </li><li style="flex:1">account for about half of Hungary’s </li></ul><p></p><ul style="display: flex;"><li style="flex:1">production. An inter- </li><li style="flex:1">Altogether, more than 1,000 EDF electricity </li></ul><p>and industry partner engineers and governmental agreement signed in early technicians have been mobilised to 2014 would see Russian enterprises and </p><ul style="display: flex;"><li style="flex:1">perform these system performance tests. </li><li style="flex:1">their international sub-contractors supply </li></ul><p></p><p><em>Contact: ED F , t elephone: 33 (0) 40 </em>two new units at Paks - VVER-1200 </p><p>At present, the construction of four <br>HPR 1000 nuclear power units by CNNC is proceeding smoothly. They are the only third-generation pressurized water reactors in the world that are being built on schedule. </p><p><a href="mailto:%[email protected]" target="_blank"><em>42 46 37, email: </em></a><a href="mailto:%[email protected]" target="_blank"><em>service-de-presse@edf. </em></a>reactors. <em>fr . </em></p><p><em>Contact: Romain Desgeorge, Rolls- </em><br><em>Royce, telephone: 33 (0) 4 76 61 16 17, email: r</em><a href="/goto?url=http://romain.desgeorge.cn/" target="_blank"><em>omain.desgeorge.cn@r</em></a><em>olls- </em></p><p><strong>Barakah </strong></p><p>The <strong>Emirates Nuclear Energy </strong><a href="/goto?url=http://royce.com/" target="_blank"><em>royce.com. </em></a><br><strong>Corporation </strong>(ENEC) has successfully </p><p>The C-5 project will be constructed by CNNC China Zhongyuan Engineering Corp, a subsidiary of CNNC. </p><p><em>Contact: CNNC, telephone: 86 10 </em><br><em>68512211, fax: 86 10 68533989. </em></p><p><sup style="top: 0.0008em;">achieved significant milestones in the </sup><strong>Leningrad Phase II </strong></p><p></p><ul style="display: flex;"><li style="flex:1">construction development of its Barakah </li><li style="flex:1">Rosenergoatom has completed the </li></ul><p>Nuclear Energy Plant, including the assembly of the reactor vessel for unit 1 energization of Unit 2 Main Power of the Leningrad Phase II nuclear power Transformer Transformer and Unit Auxiliary Power Russia. The nuclear power plant operator Transformers (UAT). subsidiary of state nuclear corporation </p><ul style="display: flex;"><li style="flex:1">(MTR), </li><li style="flex:1">Excitation plant, which is in Sosnovy Bor in western </li></ul><p></p><p><strong>Tianwan </strong></p><p>Unit 3 of Tianwan Nuclear Power <br>Plant succeeded in connecting to the power grid in Lianyungang, Jiangsu province, China, on Dec 30, 2017 with all technical indicators according with initial design requirements. <br>The energization of Unit 2’s MTR, Rosatom said the VVER-1200 was being <br>Excitation Transformer and UAT allows prepared for first criticality in January, for the initiation of Hot Functional 2018. </p><ul style="display: flex;"><li style="flex:1">Testing (HFT). These achievements mark </li><li style="flex:1">The existing Leningrad plant site has </li></ul><p>another set of milestones in the safe four operating RMBK-1000 units, while and steadily progressing construction of Leningrad II will have four VVER-1200 ENEC’s Barakah Nuclear Energy Plant, units. Testing of the passive heat removal located in the Al Dhafra region of Abu system of unit 1 of Leningrad II was </p>
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages52 Page
-
File Size-