Bus Rapid Transit

Bus Rapid Transit

Telegraph- International-East 14th- Bus Rapid Transit March 2006 Jim Cunradi [email protected] or 510-891-4841 Curitiba, Brazil Vancouver, Canada Jerusalem, Israel Eindhoven, Netherlands Rouen, France Corridor Characteristics »18 miles through 3 Cities - UC Berkeley campus to downtown Oakland, primarily along Telegraph Avenue, continuing to the Bay Fair BART station in San Leandro, along International/East 14th Street. »High densities of employment and housing »30,000+ daily ridership »BRT in Corridor is high priority project in Alameda Countywide Plan »Track 1 project in 2030 RTEP and Regional Transit Expansion Plan Progressive Implementation » Rapid Bus components implemented first by 2006 • New express service • New low-floor, low emission buses • Shelters • NextBus signs • Traffic Signal Priority » Full BRT project built as funding is available and based on results of EIS • Construction to begin in 2008 »Bus-only lanes proposed for most of route, except: • Broadway in downtown Oakland • East 14th Street in downtown San Leandro • Lake Merritt Dam »Transit signal priority for most of route, except • Broadway in downtown Oakland »Rail-like stations with boarding platforms level with the bus, shelters, real-time information, fare vending machines »Proof-of-Payment ticketing & multi-door boarding Major Investment Study begun in 1999 –completed 2001 Over 50 public and agency meetings in 2004 3 cities, Caltrans, dozens of neighborhood and merchant groups 700 possible design variations 2 operating plans »Greatly increases corridor transit ridership »Reduces auto trips »Improves air quality »Reduces energy use »Increases operating efficiency »Supports Transit-Oriented Development »Improves pedestrian environment »Auto congestion at some intersections »Loss of parking near BRT stations »Left-turn restrictions at some minor streets 18.00 16.00 14.00 Do nothing Rapid in 2005 12.00 BRT in 2005 10.00 8.00 Year th rd Notes: SR-185, South Area Redevelopment, Storm Block th rd »Estudillo Pedestrian Plaza, a partnership between AC Transit and the City of San Leandro »Mixed-flow operations »BRT-based Transit Oriented Development study, the first of its kind in the Bay Area th th »Notes: Community relations, medians, culture, bus ridership, “wobble”, transit village Notes: Transfer point for 3 BRT lines & BART, Uptown, Theater District, Streetscape, fast track const’n st Notes: “Pill Hill”, BRT design variation st »Notes: neighborhood commercial, on street parking »Notes: Alta Bates Hospital »Pedestrian-bus Zone »Large numbers of pedestrians »Merchant opposition »Polarized politics »Many design options under review Notes: UC Berkeley, 30,000 students, 10,000+ faculty & staff, 5,000 daily riders projected »Notes: BART connection, 16,000 workers, Transit plan study »Spring 2006 – Release Draft Environmental Impact Statement »Spring 2006 – Public hearings, public & agency comments, neighborhood workshops »Spring 2007 – Final EIS/EIR, Final Design, mitigation program, ROD »Winter 2008 – Begin Construction »Summer 2009 – Open Initial Segment .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    31 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us