Recovering from Heavy Rain Damage Through Cooperation and Think-And

Recovering from Heavy Rain Damage Through Cooperation and Think-And

Our Starting Point Our Starting Point Strategy of Value Creation for Our Vision A Foundation Supporting Value Creation Data Status of operations and damage directly after the Heavy Rain Event of July 2018 Situation at 2:00pm, July 11, 2018 Recovering from heavy rain Operational Operations suspended Shinji Tottori Yonago Higashi- Kisuki Line Maizuru damage through cooperation San-in Line Nishi-Maizuru Izumo-Yokota Chizu Mochigase Kamiiwami Fukuchiyama ru Wadayama Hakubi Line Niimi Tsuyama Express Chizu Maizu Line Bingo-Ochiai Imbi Teramae Masuda Line Ayabe Higashi- San-in Line Hiroshima Bichu- Shiomachi Okayama ama Hagi Shin-Iwakuni Kojiro Tsuy Line Tokuyama ntan Line Aki- Kozuki Sayo Ba and think-and-act initiatives ine akubi Line Kameyama Fuchu H Geibi Line Higashi- Kishin Fukuen Line Line San-yō L Kannnabe Okayama Kamigori Kabe Soja Line Higashihiroshima Himeji Mihara Fukuyama The Heavy Rain Event of July 2018 resulted in large-scale damage throughout West Japan, including in areas where Shin-Yamaguchi Kaitaichi Kushigahama Yokogawa Kasaoka Gantoku Line JR-West operates, and many sections of track were rendered unusable. Iwakuni Kurashiki Kure Line Yanai Amid this unprecedented damage, we came together as a Group and by implementing many think-and-act initiatives and San-yō Line cooperating with local stakeholders, we were able to recover many damaged sections of track and restart operations.* Recovery work In order to get life back to normal as soon as possible, we mobilized Opening land around the capabilities of the entire Group and cooperated with affiliates An entire stations for and local stakeholders in various areas to advance recovery efforts. bicycle parking region coming The effects of operations being suspended along sections of track Emergency transport during the disaster together in meant that the area around Kaitaichi using ferries and bus rapid transit, and Station became over-congested with alternative rail transport by Shinkansen bicycles belonging to passengers. cooperation Work on a development project that In the early stages of the disaster, road transportation networks had started before the heavy rain were disrupted, so the region came together to begin event was halted and various parties, operating emergency transportation in order to secure a including the local government, means of transport between Kure and Hiroshima. There cooperated swiftly to open part of were also long-term halts to operations on the Sanyo Main the site that was near the station to Line, so we provided alternative rail transport by Shinkansen. passengers as a temporary bicycle parking area. Passengers were able to A Series of park at the site for one month. think-and-act Rail replacement bus services realized through cooperation within the region initiatives and support from bus companies across Japan There were many sections of track which could not be repaired quickly, so in order to fulfill our mission without as a group of companies that provide public transport, we cooperated with bus associations, local precedents companies, and bus companies from across Japan to operate rail replacement bus services in each area. Working to bring Operating freight trains on alternative routes smiles to people With the Sanyo Main Line out of operation, at the request of in the region the Japan Freight Railway Company we provided alternative Thanks to cooperation from a wide range of people routes for freight trains via the Using fallen trees in Hakubi Line, San-in Main Line, and organizations, we were able to restart operations barriers against landslides and Yamaguchi Line. on many sections of track.1 As we carried out recovery JR-West also cooperated in work, we received many words of encouragement At Ashidachi Station on the Hakubi various other ways, including Line, we used fallen trees as a material training drivers, checking facilities from local people. Also, once services restarted, we to provide additional protection and equipment such as the were also honored to receive kind words and thanks. against landslide, shortening the railway lines, and coordinating construction period. train timetables, thereby playing a part in facilitating rail logistics 1 As of September 1, 2019, services are still suspended on the section throughout the entire country, of track between Miyoshi Station and Karuga Station on the Geibi including disaster-hit areas. Line. Operations are scheduled to restart on October 23, 2019. 11 West Japan Railway Group Integrated Report 2019 West Japan Railway Group Integrated Report 2019 12.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us