Recovering from Heavy Rain Damage Through Cooperation and Think-And

Recovering from Heavy Rain Damage Through Cooperation and Think-And

<p>Our Starting Point </p><p>Our Starting Point </p><p></p><ul style="display: flex;"><li style="flex:1">Strategy of Value Creation for Our Vision </li><li style="flex:1">A Foundation Supporting Value Creation </li><li style="flex:1">Data </li></ul><p></p><p>Status of operations and damage directly after the Heavy Rain Event of July 2018 </p><p>Situation at 2:00pm, July 11, 2018 Operational </p><p>Recovering from heavy rain damage through cooperation and think-and-act initiatives </p><p>Operations suspended </p><p>Shinji <br>Tottori <br>Yonago <br>Higashi- </p><p>Kisuki Line </p><p>Maizuru </p><p>San-in Line </p><p>Nishi-Maizuru <br>Izumo-Yokota <br>Chizu Mochigase <br>Kamiiwami </p><p>ru Maizu </p><p>Fukuchiyama <br>Wadayama Teramae <br>Niimi </p><p></p><ul style="display: flex;"><li style="flex:1">Line </li><li style="flex:1">Hakubi Line </li></ul><p></p><p>Tsuyama </p><p>Imbi Line </p><p>Bingo-Ochiai Shiomachi <br>Ayabe <br>Masuda <br>BichuKojiro </p><p>San-in Line </p><p>HigashiHagi </p><p>ama Line </p><p><sup style="top: -0.1927em;">Tsuy </sup>Kozuki Sayo </p><p>Higashi- </p><p>ntan Line Ba </p><p>Aki- </p><p></p><ul style="display: flex;"><li style="flex:1">akubi Line </li><li style="flex:1">ine </li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1">Kameyama </li><li style="flex:1">Fuchu </li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1">H</li><li style="flex:1">Geibi Line </li></ul><p>Kishin Line </p><ul style="display: flex;"><li style="flex:1">Fukuen </li><li style="flex:1">Line </li></ul><p></p><p>Okayama <br>Kannnabe </p><p></p><ul style="display: flex;"><li style="flex:1">San-yō </li><li style="flex:1">L</li></ul><p></p><p>Kamigori </p><p>Kabe Line </p><p>Soja </p><p>The Heavy Rain Event of July 2018 resulted in large-scale damage throughout West Japan, including in areas where JR-West operates, and many sections of track were rendered unusable. </p><p>Kaitaichi </p><p>Kure Line </p><p>Yokogawa Iwakuni <br>Kasaoka Kurashiki <br>Kushigahama </p><p>Gantoku Line </p><p>Yanai </p><p>Amid this unprecedented damage, we came together as a Group and by implementing many think-and-act initiatives and cooperating with local stakeholders, we were able to recover many damaged sections of track and restart operations.* </p><p>San-yō Line </p><p>Recovery work </p><p>In order to get life back to normal as soon as possible, we mobilized the capabilities of the entire Group and cooperated with affiliates and local stakeholders in various areas to advance recovery efforts. </p><p>Opening land around stations for bicycle parking </p><p>An entire </p><p>The effects of operations being </p><p>region coming together in cooperation </p><p>suspended along sections of track meant that the area around Kaitaichi Station became over-congested with bicycles belonging to passengers. Work on a development project that had started before the heavy rain event was halted and various parties, including the local government, cooperated swiftly to open part of the site that was near the station to passengers as a temporary bicycle parking area. Passengers were able to park at the site for one month. </p><p>Emergency transport during the disaster using ferries and bus rapid transit, and alternative rail transport by Shinkansen </p><p>In the early stages of the disaster, road transportation networks were disrupted, so the region came together to begin operating emergency transportation in order to secure a means of transport between Kure and Hiroshima. There were also long-term halts to operations on the Sanyo Main Line, so we provided alternative rail transport by Shinkansen. </p><p>A Series of think-and-act initiatives without precedents </p><p>Rail replacement bus services realized through cooperation within the region and support from bus companies across Japan </p><p>There were many sections of track which could not be repaired quickly, so in order to fulfill our mission as a group of companies that provide public transport, we cooperated with bus associations, local companies, and bus companies from across Japan to operate rail replacement bus services in each area. </p><p>Working to bring smiles to people in the region </p><p>Operating freight trains on alternative routes </p><p>With the Sanyo Main Line out of operation, at the request of the Japan Freight Railway Company we provided alternative routes for freight trains via the </p><p>Thanks to cooperation from a wide range of people and organizations, we were able to restart operations on many sections of track.<sup style="top: -0.1259em;">1 </sup>As we carried out recovery work, we received many words of encouragement from local people. Also, once services restarted, we were also honored to receive kind words and thanks. </p><p>Using fallen trees in </p><p>Hakubi Line, San-in Main Line, and Yamaguchi Line. </p><p>barriers against landslides </p><p>JR-West also cooperated in <br>At Ashidachi Station on the Hakubi various other ways, including <br>Line, we used fallen trees as a material training drivers, checking facilities to provide additional protection and equipment such as the against landslide, shortening the railway lines, and coordinating construction period. train timetables, thereby playing </p><p>1 As of September 1, 2019, services are still suspended on the section of track between Miyoshi Station and Karuga Station on the Geibi Line. Operations are scheduled to restart on October 23, 2019. </p><p>a part in facilitating rail logistics throughout the entire country, including disaster-hit areas. </p><p></p><ul style="display: flex;"><li style="flex:1">West Japan Railway Group Integrated Report 2019 </li><li style="flex:1">West Japan Railway Group Integrated Report 2019 </li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1">11 </li><li style="flex:1">12 </li></ul><p></p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us