The World Bank Report No: ISR8727 Implementation Status & Results China Sichuan Urban Development Project (P083322) Operation Name: Sichuan Urban Development Project (P083322) Project Stage: Implementation Seq.No: 8 Status: ARCHIVED Archive Date: 23-Dec-2012 Country: China Approval FY: 2007 Public Disclosure Authorized Product Line:IBRD/IDA Region: EAST ASIA AND PACIFIC Lending Instrument: Specific Investment Loan Implementing Agency(ies): Key Dates Board Approval Date 07-Sep-2006 Original Closing Date 31-Dec-2013 Planned Mid Term Review Date 01-Sep-2010 Last Archived ISR Date 18-Jan-2012 Public Disclosure Copy Effectiveness Date 05-Jan-2007 Revised Closing Date 31-Dec-2013 Actual Mid Term Review Date 10-Jan-2011 Project Development Objectives Project Development Objective (from Project Appraisal Document) To improve core urban functions in an equitable and resource efficient manner by removing identified infrastructure bottlenecks hampering land development, transport, and environmental conditions in four second-tier cities in Sichuan Province. Has the Project Development Objective been changed since Board Approval of the Project? Yes No Public Disclosure Authorized Component(s) Component Name Component Cost Mianyang Pioneer Park 49.96 Mianyang Southern Economic Development Zone (SEDZ) 48.73 Suining Xining District Area 58.23 Suining Xining Road 6.75 Yibin Route A 40.44 Yibin Route B 35.91 Panzhihua Bing-Ren Road 80.22 Panzhihua Bing-Jiang Road 9.32 Public Disclosure Authorized Panzhihua: Sewerage 10.41 Panzhihua: River embarkment and landscape improvement 25.60 Overall Ratings Previous Rating Current Rating Public Disclosure Copy Progress towards achievement of PDO Moderately Satisfactory Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Satisfactory Page 1 of 7 Public Disclosure Authorized The World Bank Report No: ISR8727 Previous Rating Current Rating Overall Risk Rating Moderate Moderate Implementation Status Overview Progress toward removing identified infrastructure bottlenecks and improving environmental conditions in the four second-tier cities (Mianyang, Suining, Yibin, Panzhihua) is well underway, with construction of most investments completed in 2012. In Suining, all contracts for the construction of various roads, bridges and drainage works have been completed or substantially completed. All these works are supporting improved access and development of Xining District, as well as a related link road to a rail station. In Yibin, both roads (Route A and B) and two bridges have been opened to traffic and have improved the transportation and promoted the development zone of Linggang Industrial Public Disclosure Copy District. In Panzhihua, all roads were completed and opened to traffic, including bridges and tunnels, which have greatly reduced travel times and improved accessibility to expansion areas of the city, thereby reducing congestion in the downtown area, which was a major bottleneck. The works under the sewerage component experienced some technically challenging construction but are all completed and treatment capacity has been increased, improving environmental conditions in the city. Mianyang’s progress is somewhat lagging as a result of the impacts of the 2008 Wenchuan Earthquake and resulting project restructuring in August 2011. All contracts in the Southern Economic Development Zone have been substantially completed and opened to traffic. The improved access and overall infrastructure conditions have helped increase land sales and revenues. In Pioneer Park, most roads have been opened to traffic and have improved access, benefiting land sales. The only ongoing construction is in the Xinglong Area where works are moving forward, but are experiencing some delays due to slow resettlement and land acquisition progress. Locations Country First Administrative Division Location Planned Actual Iran Ostan-e Khuzestan Mansuriyeh-ye Yek Greece Not Entered Ayia Trias China Sichuan Sheng Yibin China Sichuan Sheng Xining China Sichuan Sheng Renhe China Sichuan Sheng Mianyang China Sichuan Sheng Geliping China Sichuan Sheng Tianyuan China Sichuan Sheng Panzhihua Public Disclosure Copy Results Page 2 of 7 The World Bank Report No: ISR8727 Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Evidence that identified bottlenecks have been Text Value Not applicable The new roads have resulted Evidence identified via reports removed, as expected by the strategic in time savings and increased from technical and social investments of the project, including a high traffic flows are evidence of audits level of satisfaction among users of better access to certain areas. investments and PAP In Panzhihua, tunnels have provided important direct access to new development areas and de-congested the downtown area. The drainage and sewage networks and Public Disclosure Copy WWTP have improved drainage and increase wastewater collection rates. Surveys of PAPs have not been carried out yet. Date 07-Sep-2006 21-Nov-2012 28-Jun-2013 Comments Some critical bottlenecks have been addressed where roads are operational. Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target Mianyang: Area of land sold (ha) Text Value 0 Pioneer Park: 117.96ha Pioneer Park: 238; SEDZ: 312 SEDZ: 333.6ha Date 01-Dec-2005 30-Dec-2011 28-Jun-2013 Comments The previous number in the Difficult to quantify in how far report for Pioneer Park was this (infrastructure) project wrong and it should have contributes to land sales and been 114.83ha values. Mianyang: Number of new residents on site Text Value 0 Pioneer Park: 36,005; 30,440 (Pioneer Park), 18,202 SEDZ: 3,850 (SEDZ) Date 01-Dec-2005 30-Dec-2011 28-Jun-2013 Comments First time actual data is collected for Pioneer Park (previously an estimate). Mianyang: Satisfaction of PAPs with Text Value Not applicable Not surveyed yet. 75% of PAPs satisfied with resettlement process and outcome in both resettlement process and Public Disclosure Copy Pioneer Park and SEDZ. outcome both in Pioneer Park and SEDZ Page 3 of 7 The World Bank Report No: ISR8727 Date 01-Dec-2005 30-Dec-2011 28-Jun-2013 Comments The resettlement activities are still underway so no detailed information is yet available on satisfaction of new residents. Suining: Area of land sold (ha) Text Value 0 24.04ha 141 ha Date 01-Dec-2005 30-Dec-2011 28-Jun-2013 Comments Difficult to quantify in how far this (infrastructure) project contributes to this indicator (land area sold). Public Disclosure Copy Suining: Number of new residents on site Text Value 0 17,500 19,820 Date 01-Dec-2005 30-Dec-2011 28-Jun-2013 Comments Suining: Satisfaction of PAPs with resettlement Text Value Not applicable Resettlement still incomplete. 75% of PAPs satisfied with process and outcome resettlement process and outcome Date 01-Dec-2005 30-Dec-2011 28-Jun-2013 Comments Site visits find the majority of PAP satisfied, but more detailed information needs to be collected after completion of activities. Yibin: Reduced travel time from Mianjiang Text Value 10 min 10min 7.5 min Bridge to Chang Jiang Bridge: Travel time in Date 01-Dec-2005 30-Dec-2011 28-Jun-2013 minutes at peak Comments There is an increase in 20% of traffic flow on this section, while travel time remains the same. Yibin: Satisfaction level of landscape Text Value Not applicable Unknown 75% of sampled people improvements satisfied with landscape improvements Date 01-Dec-2005 30-Dec-2011 28-Jun-2013 Comments Investments had not been completed prior to the last survey, should be reported in next Progress Report Public Disclosure Copy Page 4 of 7 The World Bank Report No: ISR8727 Yibin: Satisfaction of PAPs with resettlement Text Value Not applicable Not surveyed yet. 75% of PAPs satisfied with process and outcome resettlement process and outcome Date 01-Dec-2005 30-Dec-2011 28-Jun-2013 Comments Site visits find the majority of PAP satisfied. Surveys to be carried out in 2013. Panzhihua: Wastewater service coverage Text Value 40 114 85 (average wastewater volume collected and Date 01-Dec-2005 30-Dec-2011 28-Jun-2013 treated, 1000 m3/d) Comments This component is progressing very well as Public Disclosure Copy shown by increase of volume of wastewater treated. Panzhihua: Reduced travel time at peak in Text Value 56.4 min. 20 49.9 min. minutes -- East Duren Road at KM 49 to Date 01-Dec-2005 30-Dec-2011 28-Jun-2013 railway station Comments Perecentage change from teh baseline is -65%. Panzhihua: Satisfaction level of scenic Text Value Not applicable not available yet 75% of sampled people improvements satisfied with landscape improvements Date 01-Dec-2005 30-Dec-2011 28-Jun-2013 Comments Still waiting for results from the survey. Panzhihua: Satisfaction of PAPs with Text Value Not applicable not available yet 75% of PAPs satisfied with resettlement process and outcome resettlement process and outcome Date 01-Dec-2005 30-Dec-2011 28-Jun-2013 Comments Quantitative survey will be conducted at the end of project when resettlement activities have been completed. Suining: Travel time in minutes at peak from Text Value 25 min 33 min 16 min Railway station to Xining District Date 01-Dec-2005 30-Dec-2011 28-Jun-2013 Comments The traffic flow reached 14,000 vehicles, which is 17 times higher than the baseline (800 vehicles). Public Disclosure Copy Page 5 of 7 The World Bank Report No: ISR8727 People provided with access to ‘improved Number Value sanitation facilities” under the proj. Date 28-Jun-2013 Comments People provided with access to “improved Number Value 566700.00 910000.00 970000.00 sanitation facilities” - urban Sub Type Date 01-Dec-2005 30-Dec-2011 28-Jun-2013 Breakdown Comments Related to sewage Total capacity of WWTPs in component in Panzhihua City. Panzhihua will be 260,400 m3/day People provided with access to "improved Number Value 105000.00 200000.00 210000.00 sanitation facilities" - rural Sub Type Date 30-Dec-2011 28-Jun-2013 Public Disclosure Copy Breakdown Comments Related to sewage interceptor connected to the Dadukou WWTP under JBIC project.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages7 Page
-
File Size-