SUBMISSION OF FORM – I & IA TOWARDS GETTING TERMS OF REFERENCE (EC-EXPANSION) For M/s. APEX MEADOWS PVT LTD (Residential/Commercial/Township Construction) Sy. No. 80/4, 104/1P, 104/2, 104/3, 104/4, 104/5, CHINAGANTYADA, GAJUWAKA, VISAKHAPATNAM Submitted to STATE ENVIRONMETNAL IMPACT ASSESSMENT AUTHORITY (SEIAA) O/o. AP POLLUTION CONTROL BOARD, VIJAYAWADA. December’2018 Prepared by Enviro House, Block –B, B-1, IDA, Auto Nagar, Visakhapatnam – 530 012 Telephone: 0891-2755528, E-mail: svenviro_labs@yahoo.co.in QCI No – 147 & Recognized by MOE&F, New Delhi. FORM 1 (I) Basic Information Sl.No. Item Details 1. Name of the project(s) M/s. APEX MEADOWS PVT LTD, SY.NO. 80/4, 80/5, 104/1P, 104/2, 104/3, 104/4 & 104/5 CHINAGANTYADA, GAJUWAKA VISAKHAPATNAM DISTRICT. 2. S.No. in the schedule 8 (a) 3. Proposed capacity/area/length/tonnage to be Existing EC Expansion. handled/command area/lease area/number of 1. For the final built up area of 131546.95 wells to be drilled. Sq. M 2. Addition of 2 extra floors for each block and also increase in built up area slightly in each tower. 3. Previously each tower has 14 floors and now it will be 16 floors. 4. The proposed total no. flats were 633 and the proposal has an increase in built up area by 8905.64 Sq. M compared to previous EC Order dated 14.03.2012 4. New/Expansion/Modernization Expansion Construction of Residential/Commercial 5. Existing Capacity/Area etc. NIL 6. Category of Project i.e. ‘A’ or ‘B’ Category – B 7. Does it attract the general condition? If yes, No please specify. 8. Does it attract the specific condition? If yes, No please specify. 9. Location Plot/Survey/Khasra No. SY.NO. 80/4, 80/5, 104/1P, 104/2, 104/3, 104/4 & 104/5 Village CHINAGANTYADA, Tehsil GAJUWAKA District VISAKHAPATNAM State ANDHRA PRADESH 10. Nearest Railway Station/Airport along with Duvvada at 5.47 kms. distance in kms. 11. Nearest Town, City, District Headquarters along Visakhapatnam at 12.58 kms with distance in kms. 12. Village Panchayats, Zilla Parishad, Municipal GVMC & VUDA Corporation, Local body (complete postal addresses with telephone nos. to be given) 13. Name of the applicant M/s. APEX MEADOWS PVT LTD Mr.A.V. Monish Row Director 14. Registered Address S. no - 104/2, Next to Lanka Grounds, NH- 5, Gajuwaka, Visakhapatnam 15. Address for correspondence: Name Mr. A.V. Monish Row Designation (Owner/Partner /CEO) Director Pin code 530025 E-mail monish.row@thecelest.com Telephone No. 9848190912 Fax No. 16. Details of Alternative Sites examined, if any. It is an existing site under construction and Location of these sites should be shown on a topo new application made for EC Expansion sheet. hence alternative site examined so not applicable. Site selection criteria play an important role in the initiation of any developmental activity such as Residential/commercial developmental project. Availability of basic infrastructure necessary for the construction project & demand for housing proposed as it is facilitated for general requirements like educational institutes, Transportation, etc, no alternate site is examined. 17. Interlinked Projects Nil 18. Whether separate application of interlinked NA project has been submitted? 19. If yes, date of submission NA 20. If no, reason NA 21. Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. i. The Forest (Conservation) Act, 1980? NA ii. The Wildlife (Protection) Act, 1972? NA iii. The C.R.Z. Notification, 1991? NA 22. Whether there is any Government Order/Policy Nil relevant /relating to the site? 23. Forest land involved (hectares) Nil 24. Whether there is any litigation pending against the project and/or land in which the project is propose to be set up? Nil a) Name of the Court b) Case No. c) Orders/directions of the Court, if any and its relevance with the proposed project. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S.No. Information/Checklist confirmation Details thereof (with approximate quantities /rates, wherever possible) Yes/No with source of information data 1.1 Permanent or temporary change in Yes The earmarked for Construction of land use, land cover or topography Residential/Commercial project with a including increase in intensity of land site area of about 7.70 acres / 31181.72 use (with respect to local land use Sq. M and the total built up area is plan) 131546.95 Sq.mts area owned by M/s. Apex Meadows Pvt Ltd. This land is sufficient for construction of Residential/Commercial blocks and associated other utilities. A total of 31181.72 Sq. mtrs of land is available and is sufficient for the construction activity. Total Built up area = 131546.95 Sq.mts Further the above land is barren land. Therefore no change in land use / land cover / topography. EC accorded vide order No. SEIAA/AP/VSP - 20/2008 - 4/02 Dt: 14.03.2012 with built up area of 122641.31 Sq. M 1.2 Clearance of existing land, vegetation No Work has been started as per initial EC and buildings? accorded EC vide order No. SEIAA/AP/VSP - 20/2008 - 4/02 Dt: 14.03.2012 The land is developed land. 1.3 Creation of new land uses? No No extra new land will be used. The project is having 31181.72 Sq. M of land and the total built up area is 131546.95 Sq. M in this land only the proposed project will be constructed. 1.4 Pre-Construction investigations e.g. Yes For the total area of 31181.72 Sq. M bore houses, soil testing? already ground water and soil testing carried. EC work started vide order No. SEIAA/AP/VSP - 20/2008 - 4/02 Dt: 14.03.2012 1.5 Construction works? Yes Work had already started as per EC orders. Structures comprises of two and three bed room flats, Commercial Blocks, amenities, water storage tanks, DG Set room, Sewage Treatment Plant, etc. The main components of the civil works for the proposed plant include the construction of bed rooms, foundations and structures, Sewage Treatment Plant, etc. 1.6 Demolition works? No The site is leveled one and does not contain any temporary / permanent structures. Therefore no demolition work will be carried. 1.7 Temporary sites used for construction No Local manpower will be utilized for the works Or housing of construction construction work. Therefore no workers? temporary site used for construction works. 1.8 Above ground buildings, structures or Yes BUILDINGS earthworks including linear structures, Residential Building cut and fill or excavations Commercial Building Amenities Block Sewage Treatment Plant Water Storage Tank DG Set Room 1.9 Underground works including mining No No mining or tunneling activity. or tunneling? 1.10 Reclamation works? No No reclamation work 1.11 Dredging? No Not applicable 1.12 Offshore structures? No Not applicable 1.13 Production and manufacturing No Proposed project is only construction of processes? residential and commercial building 1.14 Facilities for storage of goods or Yes Cement storage materials? Building materials storage 1.15 Facilities for treatment or disposal of Yes Liquid effluents solid waste or liquid effluents? The waste water generated from the proposed project will be in the form of sanitary waste water only which will be routed to sewage treatment plant and thereby reuse and for firefighting if surplus to local municipal sewerage network. Solid waste Municipal waste (Proposed) - 1867.5 kg/day Municipal waste (Previous) - 2172 kg/day DISPOSAL: Wet waste – In house vermi composting and dry waste will be disposed to local municipal dumping site. 1.16 Facilities for long term housing of No Majority of manpower will be recruited operational workers? from local people only. Therefore no housing scheme proposed. 1.17 New road, rail or sea traffic during No The site is well connected to roadway. Construction or operation? No new road, rail or sea traffic is envisaged during construction or operation phase. 1.18 New road, rail, air waterborne or other No Not applicable. transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No No transport routes will be changed. transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or No Not required to divert transmission lines / pipelines? pipelines. 1.21 Impoundment, damming, culverting, No Not applicable realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No No stream crossings are required. 1.23 Abstraction or transfers of water form Yes Municipal supply will be used to meet ground or surface waters? the water requirements of 498.0 KLD rounded to 500.0 KLD for domestic purpose. 1.24 Changes in water bodies or the land No No change in water bodies and no surface affecting drainage or run-off? changes occur in drainage pattern. As the proposed project is area development project it does not emit any process effluent. 1.25 Transport of personnel or materials Yes During construction activity, private for construction, operation or tippers will be used for supply of metal, decommissioning? sand, cement and iron. 1.26 Long-term dismantling or No No dismantling work will be carried in decommissioning or restoration the project. works? 1.27 Ongoing activity during No No decommissioning activity proposed. decommissioning which could have an impact on the environment? 1.28 Influx of people to an area either Yes There would be a marginal influx of temporarily or permanently? people since the project consists of residing flats.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages34 Page
-
File Size-