Energy & the Environment: a Way Forward for Coal

Energy & the Environment: a Way Forward for Coal

Energy & the Environment: A way forward for coal - the Kemper project Ed Holland Mississippi Power President and CEO October 9, 2014 Kemper: 582-MW Integrated Gasification Combined Cycle facility with pre-combustion carbon capture How it works: Fully Integrated Design Liberty Mine Zero Liquid discharge: Process Water Output Byproducts Kemper: Redefining Energy Sustainability 25% Coal 75% • Fuel diversity Natural Gas • Fuel price stability • Secure, reliable power 2020 energy mix without Kemper • Zero liquid discharge 20% 25%Coal 20% • Captured carbon used in enhanced Coal Lignite oil recovery 60% • Byproduct revenue Natural Gas * Includes unit retirement and fuel switch announcements (7/4/14) 2020 energy mix with Kemper * CO2 Utilization – Commodity not Waste Kemper: Why it works in Mississippi • Lignite mine mouth – 31,000 acre mine site • Enhanced oil recovery – 60 mile CO2 Pipeline for EOR • Meridian treated effluent – 30 miles of treated effluent pipeline • Transmission – 70 new miles • Off Gulf Coast – 80% Current Generation on Gulf Coast Safety • Industry leaders in maintaining a safe workplace – through every area of the company • .54 Project Recordable Incident Rate – 3-5 times safer than Construction Industry Average • 28 Million Man-hours – 14,000 FTE for a year Economic Benefits • $1 Billion in Mississippi contracts • 12,000 direct and indirect jobs • 500 Mississippi companies • 500 permanent employees • $75 Million state and local taxes during construction • $30 Million state and local taxes annually in operation Project Current Status Construction • Essentially complete except for heat tracing & insulation. Support for startup and operations now through COD Startup • Gasifier first-fire is expected in the 4th quarter. Operations • Plant staff at 173, planning for 220 by COD. Operation and Maintenance training in progress. Team participation in startup and commissioning Combined Cycle • CC in service Aug. 9, 2014 Mine • Mine staffing at 120, estimated 220 at full operations. ~890,000 tons of lignite mined International Considerations for Advanced Coal Technologies 11 National Natural Gas Market Overview: World LNG Landed Prices Federal Energy Regulatory Commission • Market Oversight • www.ferc.gov/oversight World LNG Estimated September 2014 Landed Prices UKUK UK UK$ 8$8.75.7$58 .75 $ 6.60 Be BeBelgiulgiummlgiu m Canaport Korea Cove Point lgium$ 6.78 $ 2.78 $ 10.50 $ 2.44 $8$8.84$.88 4.99 Japan Spain Korea CoCovevePoPoinLtintake Charles Cove Point $13.10 $ 10.50 $4$4.50.50 $ 9.15 $ 3.4$04.4 0 KoKorearea China Altamira SpSpainaiSnpain JapanJapan India $1$12.42.400 $ 10.10 $ 10.18 $9$9.05.0$59.15 $1$12.42.4Japa0n0 AltamiraAltamira $ 10.15 LaLakLeakeChkaeChCha arlesrlersles Altamira $13.10 $3$3.9$63.9.936 $4$4.6$04.6.570 IndiaIndiIndiaa Rio de Janeiro $1$11.$511.1.5 555 $ 9.92 Bahia Blanca $ 10.20 Source: Waterborne Energy, Inc. Data in $US/MMBtu Note: Includes information and Data supplied by IHS Global Inc. and its affiliates (“IHS”); Copyright (publication year) all rights reserved. Updated August 2014 3024 "We're going to need not 10, maybe 100 more of these plants across the country." – U. S. Secretary of Energy Ernest Moniz, Nov. 8, 2013 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    13 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us