Monitor & Control

Monitor & Control

Monitor & Control Monitor & Control Monitor & Control consists of the processes used to track, review, and orchestrate project progress, identify areas where changes are required, and initiate/implement those changes Unlike Scoping and Executing, Monitor & Control applies to the entire life-cycle of the project, as shown above 2 Monitor & Control CDOT Process Groups and Project Delivery Plan Mapping Transition to Project Delivery Plan Execute Monitor & Control Construction 1 Risk Management Monitor & Control Risks Transfer Active Risks 2 Roles & Responsibilities 3 Scope Management Monitor & Control Scope 4 Cost Management Control Costs 5 Schedule Management Control Schedule 6 Change Management Control Changes 7 Procurement Management Manage Procurements Control Contracts/TOs Closeout Contracts/TOs 8 Communications Manage Control Communications Transfer information Management Communications 9 Quality Management Conduct Quality Assurance Control Quality 10 Transition to Best Practices Archive Construction Records 3 Monitor & Control The following topics will be discussed: • How does a Project Manager Monitor and Control a project? • Change Management • Summary 4 Monitor & Control PMs monitor and control projects by: • Regularly communicating with the project team (team meetings) • Updating/reviewing/analyzing tracking tools as planned in the PDP, including the AID-Change Log, etc., as well as the Risk Workbook • Reviewing/updating project status via systems (SAP) and reports 5 Monitor & Control: SAP Project Portal Project information is available in SAP via the Project Portal 6 Monitor & Control: SAP Project Portal A ‘one-stop shop’ for preconstruction and construction data including: project, personnel, funding, end dates, budget, milestones and construction drawdowns and expenditures, etc. 7 Monitor & Control: SAP Project Portal Keeping Project Data up to date is important for a number of reasons. Project data is rolled up and reported by Residencies, Programs, Regions, & Portfolios, in a series of reports that support “management by exception.” (vs. exceptional) This one of 10 standard reports now available on a Google Team Drive and distributed to PMO Reps. 8 Monitor & Control: SAP Project Portal How might your project end up as an “exception?” • Missing or out-of-date milestones • Drawdowns not equal to Form 65 • Current date exceeds FHWA end date • Contractor plans to spend more than amount encumbered (for Incrementally Encumbered projects only) 9 Monitor & Control: Cost Monitor Costs: • Make sure that only staff working on the project are charging to it • Compare Expenditures to Budgeted amounts – Identify variances – how much work has been accomplished compared to expenditures? – Monitor balance – is the budget sufficient? Project Planned 10 Monitor & Control: Cost Cost Monitoring also applies to the construction budget. As a project progresses through the preconstruction milestones: • Use the PCPT to update the Base Estimate for Construction Items • Compare the revised estimate to the Project Planned budget 11 Monitor & Control: Schedule Update the Schedule with changes and actual progress: • Compare dates to the current Baseline Schedule (reflects approved changes) for: – Deliverables – Milestones, etc. • Monitor the critical path and changes in float/slack for the Ad Date as compared to the Late Ad Date Remember to update Forecast Milestones in SAP 12 Monitor & Control: Change Management When changes are identified, implement the Change Management Plan: • Analyze impact of the proposed change to schedule, costs, scope • Comply with documentation and approval requirements • Escalate decision-making as needed Follow the Communication Plan to notify: • Project Team • Management • Internal & External Stakeholders 13 Summary Monitor and Control includes the processes that help a PM: • Track the status of a project • Identify and analyze changes • Properly implement changes 14 Questions/Discussion 15.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    15 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us