Government of India Ministry of Railways Lok Sabha Starred Question No.133 to Be Answered on 28.07.2021 Railway Underpass †*13

Government of India Ministry of Railways Lok Sabha Starred Question No.133 to Be Answered on 28.07.2021 Railway Underpass †*13

GOVERNMENT OF INDIA MINISTRY OF RAILWAYS LOK SABHA STARRED QUESTION NO.133 TO BE ANSWERED ON 28.07.2021 RAILWAY UNDERPASS †*133. SHRIMATI JASKAUR MEENA: Will the Minister of RAILWAYS be pleased to state: (a) whether the Government is aware that there are 25 villages near Bandikui including Bhojwada and Deladi villages where an underpass is needed to be constructed between pillar nos.175 to 500 of Bandikui-Baswa railway line and if so, the details thereof; (b) whether the Government is also aware of the need to construct an underpass near Bhojwada village as one lakh people of around 40 villages are affected by the delay in the construction of the said underpass and people have to go an extra 45 kms and the farmers of the village are not able to approach their land as their land is on both sides of road; (c) whether the Government is likely to include the construction of the said underpass under the National Rail Plan; and (d) if so, the details thereof? ANSWER MINISTER OF RAILWAYS, COMMUNICATIONS AND ELECTRONICS & INFORMATION TECHNOLOGY (SHRI ASHWINI VAISHNAW) (a) to (d): A Statement is laid on the Table of the House. ***** STATEMENT REFERRED TO IN REPLY TO PARTS (a) TO (d) OF STARRED QUESTION NO.133 BY SHRIMATI JASKAUR MEENA TO BE ANSWERED IN LOK SABHA ON 28.07.2021 REGARDING RAILWAY UNDERPASS (a) to (d): The issue relates to construction of Road Under Bridge (RUB) at Km. 175/500 between Bhankari and Dausa Stations. The villages near Bandikui are served by two Level Crossings (LCs), LC No. 176 (Km 175/300-400) & LC No. 179 (Km 178/200-300). A Road over Bridge (ROB) also exists at Km 176/500-600. The bank height near Bandikui is very low, which is not suitable for the construction of RUB due to anticipated drainage problems. As per existing policy, Railways provide RUB/Subways to replace LC, if technically feasible, as per Railways requirements. In case of State’s requirement, Railways provide RUB/Subways as a deposit work at 100% cost of State Government, subject to its being technically feasible. Presently, Railway has no plan to construct a RUB/ Subway at this location. ***** .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us