16072018Ie3kdaywcompleter

16072018Ie3kdaywcompleter

EXTENSION OF VALIDITY OF ENVIRONMENT CLEARANCE FOR EXPANSION FORM 1 M/S ALPHA CORP DEVELOPMENT PROJECT RESIDENTIAL PLOTTED COLONY AT VILLAGE BALDI, TIKRI, PRIVATE LIMITED. KAILASH & UCHANA, SECTOR-28A & 29, DISTRICT-KARNAL, HARYANA. Application for Extension of Environmental Clearance (EC) UPDATED FORM 1 (See Paragraph – 6 Notification dated14th September 2006) as amended to EIA Notification, 2006 issued vide S.O. 3067(E) on dt. 01.12.2009. Basic Information SN Item Details 1. Name of the project/s Extension of Validity of Environment Clearance for Expansion Project Residential Plotted Colony at Village Baldi, Tikri, Kailash & Uchana, Sector-28A & 29, District- Karnal, Haryana 2. S. No. in the schedule 8(b) 3. Proposed capacity/area/length /tonnage Total Plot area: 226.981 Acres (91.89 Ha.) to be handled/ command area/lease Total Plots: 1,820 Nos. area/ number of wells to be drilled 4. New/Expansion/Modernization Extension of validity period of Environmental Clearance 5. Existing capacity/area etc. As on date 1058 Nos. of plots has been hand over. 6. Category of the project i.e. ‘A’ or ‘B’ B 7. Does it attract the general condition? If No yes, please specify. 8. Does it attract the specific condition? If No yes, please specify. 9. Location Village- Baldi, Tikri, Kailash & Uchana, Sector-28A & 29, District-Karnal, Haryana Plot/Survey/Khasra No. - Village Village- Baldi, Tikri, Kailash & Uchana Tehsil Karnal District Karnal State Haryana 10. Nearest railway station/airport along Karnal Airport 4.23 km/E with distance in kms. Karnal Railway Station:- 4.33 km/SW 11. Nearest town, city, district Headquarters Karnal along with distance in Km 12. Village Panchayats, Zilla Parishad, Municipal Corporation, Local body (complete postal address with telephone nos. to be given) 13. Name of the applicant M/s Alpha Corp Development Private Limited. 14. Registered Address Golf View Corporate Tower, Wing-A, Golf Course Road, Sector-42, Gurgaon 15. Address for correspondence: Golf View Corporate Tower, Wing-A, Golf Course Road, Sector-42, Gurgaon Name Mr. Akhilesh Mishra Designation (Owner/Partner/CEO) General Manager Address 6th Floor, Tower A, Golf View Corporate Tower, Wing-A, Golf Course Road, Sector-42, Gurgaon ITHC/PRJ/18-19/EIA/138 1 IND TECH HOUSE CONSULT EXTENSION OF VALIDITY OF ENVIRONMENT CLEARANCE FOR EXPANSION FORM 1 M/S ALPHA CORP DEVELOPMENT PROJECT RESIDENTIAL PLOTTED COLONY AT VILLAGE BALDI, TIKRI, PRIVATE LIMITED. KAILASH & UCHANA, SECTOR-28A & 29, DISTRICT-KARNAL, HARYANA. Pin Code 122002 E-mail [email protected] Telephone No. 0124-4831111 Fax No. 0124-4831100 16. Details of Alternative Sites examined, if Since it’s a renewal of EC hence it is Not applicable. any. Location of these sites should be shown on a topo sheet. 17. Interlinked Projects Nil 18. Whether separate application of Not Applicable interlinked project has been submitted? 19. If yes, date of submission Not Applicable 20. If no, reason. Not Applicable 21. Whether the proposal involves No, Project proposal does not involves approval/ clearance under: if yes, approval/clearance under subhead a, b & c. details of the same and their status to be given. (a) The forest (Conservation) Act, 1980? (b) The wildlife (Protection) Act, 1972? (c) The C.R.Z. Notification, 1991? 22. Whether there is any Government No order/policy relevant/ relating to the site? 23. Forest land involved (hectares) No 24. Whether there is any litigation pending Yes. Details attached as Annexure-I. against the project and/or land in which the project is proposed to be set up? (a) Name of the Court (b) Case No. (c) Orders/directions of the Court, if any and its relevance with the proposed project. (I) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) SN Information/Checklist Yes/ Details thereof (with approximate quantities confirmation No /rates, wherever possible) with source of information data 1.1 Permanent or temporary change No The site for proposed project is designated for in land use, land cover or residential purpose as per master plan. topography including increase in intensity of land use (with respect to local land use plan) ITHC/PRJ/18-19/EIA/138 2 IND TECH HOUSE CONSULT EXTENSION OF VALIDITY OF ENVIRONMENT CLEARANCE FOR EXPANSION FORM 1 M/S ALPHA CORP DEVELOPMENT PROJECT RESIDENTIAL PLOTTED COLONY AT VILLAGE BALDI, TIKRI, PRIVATE LIMITED. KAILASH & UCHANA, SECTOR-28A & 29, DISTRICT-KARNAL, HARYANA. SN Information/Checklist Yes/ Details thereof (with approximate quantities confirmation No /rates, wherever possible) with source of information data 1.2 Clearance of existing land, Yes Since, its area Development project, project vegetation and buildings? proponent will develop road, Services and its infrastructure. Presently we are developing road services in approved master plan. Till date no statutory clearance is required for the same. During the course of development whenever it will be required shall be taken permission from competent authority. 1.3 Creation of new land uses? No The site for proposed project is designated for residential purpose as per master plan. 1.4 Pre-construction investigations Yes Geotechnical Soil investigation has already been e.g. bore houses, soil testing? carried out. 1.5 Construction works? Yes The major construction works are given below: Site Development Road Development Internal roads Utilities/Services Water Supply/UGT/Over Head Tank Sewerage/STP Drainage Rain Water Harvesting Structures and Pits Power supply and back up facility 1.6 Demolition works? No Since, its area Development project, project proponent will develop road, Services and its infrastructure. Presently we are developing road and services in approved master plan area. Till date no statutory clearance is required for the same. During the course of development whenever it will be required shall be taken permission from competent authority. 1.7 Temporary sites used for Yes Mostly, local labors will be employed. However construction works or housing of temporary labour camps will be established for construction workers? labourers and a dormitory for the site supervisors during the construction stage. All the construction activities including storage of raw materials will be confined to the storage spaces earmarked on project site only. 1.8 Above ground buildings, Yes The earthwork is involved for foundation and laying structures or earthworks including of underground services etc. Excavated soil will be linear structures, cut and fill or used for road construction. Top 200 mm layer of excavations fertile soil is being stored separately and in future same will be continued. Stored fertile soil shall be used for plantation. 1.9 Underground works including Yes Underground works includes excavation of earth for mining or tunneling? construction of water storage tank and STP 1.10 Reclamation works? No Not involved. 1.11 Dredging? No Not involved. 1.12 Offshore structures? No Not involved. ITHC/PRJ/18-19/EIA/138 3 IND TECH HOUSE CONSULT EXTENSION OF VALIDITY OF ENVIRONMENT CLEARANCE FOR EXPANSION FORM 1 M/S ALPHA CORP DEVELOPMENT PROJECT RESIDENTIAL PLOTTED COLONY AT VILLAGE BALDI, TIKRI, PRIVATE LIMITED. KAILASH & UCHANA, SECTOR-28A & 29, DISTRICT-KARNAL, HARYANA. SN Information/Checklist Yes/ Details thereof (with approximate quantities confirmation No /rates, wherever possible) with source of information data 1.13 Production and manufacturing No This it is a area development project, Hence no processes? production or manufacturing activities will be involved. 1.14 Facilities for storage of goods or Yes Temporary storage facilities will be created during materials? construction phase for storage of construction materials. 1.15 Facilities for treatment or disposal Yes The Municipal Solid Waste would be generated from of solid or liquid effluents? the township is about 14.35 MT/Day and adequate number of collection bins separately for bio- degradable and non-biodegradable waste shall be provided as per MSW Rules. The non-bio- degradable and recyclable waste would be sold to the recyclers. The biodegradable waste would be sent to the bio-gas generation plant to be developed within the premises. Effluent:- The domestic sewerage about 2,360.817 KLD will be generated which will be treated through STP already installed within the project premises. 1.16 Facilities for long term housing of No The proposed project is a residential township and operational workers? operational workers will be hired locally therefore, no housing facilities will be provided at site for the operational workers. 1.17 New road, rail or sea traffic No Not applicable during construction or operation? 1.18 New road, rail, air waterborne or No Not applicable other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No Not applicable transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines No Not applicable or pipelines? 1.21 Impoundment, damming, No Not applicable. culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No Not applicable 1.23 Abstraction or transfers of water No There is no ground water abstraction for the form ground or surface waters? construction of project. Water will be sourced through Tanker supplies treated water will be used after testing and confirmation of fitness for construction. During operation phase, water will be supplied by HUDA. ITHC/PRJ/18-19/EIA/138 4 IND TECH HOUSE CONSULT EXTENSION OF VALIDITY OF ENVIRONMENT CLEARANCE FOR EXPANSION FORM 1 M/S ALPHA CORP DEVELOPMENT PROJECT RESIDENTIAL PLOTTED COLONY AT VILLAGE BALDI, TIKRI, PRIVATE LIMITED. KAILASH & UCHANA, SECTOR-28A & 29, DISTRICT-KARNAL, HARYANA. SN Information/Checklist Yes/ Details thereof (with approximate quantities confirmation No /rates, wherever possible) with source of information data 1.24 Changes in water bodies or the Yes Surface drainage may affect due to construction of land surface affecting drainage or the project.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    60 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us