CSO-LTCP Flushing Bay Final LTCP

CSO-LTCP Flushing Bay Final LTCP

CSO Long Term Control Plan II Long Term Control Plan Flushing Bay TABLE OF CONTENTS EXECUTIVE SUMMARY ...................................................................................................... ES-1 1.0 INTRODUCTION ..........................................................................................................1-1 1.1 Goal Statement ................................................................................................................ 1-1 1.2 Regulatory Requirements (Federal, State, Local) ........................................................... 1-2 1.3 LTCP Planning Approach ................................................................................................ 1-3 2.0 WATERSHED/WATERBODY CHARACTERISTICS ...................................................2-1 2.1 Watershed Characteristics ............................................................................................... 2-1 2.2 Waterbody Characteristics ............................................................................................. 2-33 3.0 CSO BEST MANAGEMENT PRACTICES ...................................................................3-1 3.1 Collection System Maintenance and Inspection Program ............................................... 3-3 3.2 Maximizing Use of Collection System for Storage ........................................................... 3-3 3.3 Maximizing Wet Weather Flow to WWTPs ...................................................................... 3-4 3.4 Wet Weather Operating Plan ........................................................................................... 3-4 3.5 Prohibition of Dry Weather Overflows .............................................................................. 3-5 3.6 Industrial Pretreatment Program ...................................................................................... 3-5 3.7 Control of Floatables and Settleable Solids ..................................................................... 3-6 3.8 Combined Sewer Replacement ....................................................................................... 3-6 3.9 Combined Sewer Extension ............................................................................................. 3-7 3.10 Sewer Connection & Extension Prohibitions ................................................................... 3-7 3.11 Septage and Hauled Waste ............................................................................................. 3-7 3.12 Control of Runoff .............................................................................................................. 3-7 3.13 Public Notification ............................................................................................................. 3-8 3.14 Characterization and Monitoring ...................................................................................... 3-8 3.15 CSO BMP Report Summaries ......................................................................................... 3-8 4.0 GREY INFRASTRUCTURE .........................................................................................4-1 4.1 Status of Grey Infrastructure Projects Recommended in Facility Plans .......................... 4-1 4.2 Other Water Quality Improvement Measures Recommended in Facility Plans (Dredging, Floatables, Aeration) ...................................................................................... 4-4 4.3 Post-Construction Monitoring ........................................................................................... 4-4 5.0 GREEN INFRASTRUCTURE .......................................................................................5-1 5.1 NYC Green Infrastructure Plan (GI Plan)......................................................................... 5-1 5.2 Citywide Coordination and Implementation ..................................................................... 5-1 5.3 Completed Green Infrastructure to Reduce CSOs (Citywide and Watershed) ............... 5-2 5.4 Future Green Infrastructure in the Watershed ................................................................. 5-4 6.0 BASELINE CONDITIONS AND PERFORMANCE GAP ..............................................6-1 6.1 Define Baseline Conditions .............................................................................................. 6-1 6.2 Baseline Conditions – Projected CSO Volumes and Loadings after the Facility Plan and GI Plan .............................................................................................................. 6-5 6.3 Performance Gap ............................................................................................................. 6-9 Submittal: December 29, 2016 i with CSO Long Term Control Plan II Long Term Control Plan Flushing Bay 7.0 PUBLIC PARTICIPATION AND AGENCY COORDINATION ......................................7-1 7.1 Local Stakeholder Team .................................................................................................. 7-1 7.2 Summaries of Stakeholder Meetings ............................................................................... 7-1 7.3 Coordination with Highest Attainable Use ....................................................................... 7-5 7.4 Internet Accessible Information Outreach and Inquiries .................................................. 7-5 8.0 EVALUATION OF ALTERNATIVES ............................................................................8-1 8.1 Considerations for LTCP Alternatives Under the Federal CSO Policy ............................ 8-1 8.2 Matrix of Potential CSO Reduction Alternatives to Close Performance Gap from Baseline ................................................................................................................. 8-15 8.3 CSO Reductions and Water Quality Impact of Retained Alternatives ........................... 8-53 8.4 Cost Estimates for Retained Alternatives ...................................................................... 8-59 8.5 Cost-Attainment Curves for Retained Alternatives ........................................................ 8-62 8.6 Use Attainability Analysis ............................................................................................... 8-87 8.7 Water Quality Goals ....................................................................................................... 8-90 8.8 Recommended LTCP Elements to Meet Water Quality Goals ...................................... 8-91 9.0 LONG-TERM CSO CONTROL PLAN IMPLEMENTATION .........................................9-1 9.1 Adaptive Management (Phased Implementation) ............................................................ 9-1 9.2 Implementation Schedule ................................................................................................ 9-1 9.3 Operational Plan/O&M (Operation and Maintenance) ..................................................... 9-2 9.4 Projected Water Quality Improvements ........................................................................... 9-2 9.5 Post Construction Monitoring Plan and Program Reassessment .................................... 9-2 9.6 Consistency with Federal CSO Policy ............................................................................. 9-3 9.7 Compliance with Water Quality Goals ........................................................................... 9-37 10.0 REFERENCES ........................................................................................................... 10-1 11.0 GLOSSARY ............................................................................................................... 11-1 APPENDICES Appendix A: Supplemental Tables Appendix B: Public Meeting Materials Submittal: December 29, 2016 ii with CSO Long Term Control Plan II Long Term Control Plan Flushing Bay LIST OF TABLES Table ES-1. Classifications and Standards Applied .............................................................................. ES-3 Table ES-2. CSO Discharges Tributary to Flushing Bay (2008 Typical Year) ...................................... ES-4 Table ES-3. Model Calculated 2008 Baseline Fecal Coliform Maximum Monthly GM and Attainment of Existing WQ Criteria .................................................................................................... ES-15 Table ES-4. Model Calculated Baseline DO Attainment – Existing WQ Criteria (2008)...................... ES-15 Table ES-5. Comparison of the Model Calculated 2008 Baseline and 100% Flushing Bay CSO Control Fecal Coliform Maximum Monthly GM ................................................................ ES-16 Table ES-6. Model Calculated 2008 Baseline and 100% CSO Control DO Attainment of Class SC WQ Criteria ...................................................................................................................... ES-17 Table ES-7. Model Calculated 2008 Baseline Enterococci Maximum 30-day GM and Attainment of Potential Future Primary Contact Water Quality Criteria ................................................. ES-18 Table ES-8. Model Calculated 2008 100% CSO Control Enterococci Maximum 30-day GM and Attainment of Potential Future Primary Contact WQ Criteria .......................................... ES-19 Table ES-9. Retained Alternatives ....................................................................................................... ES-20 Table ES-10. Flushing Bay Retained Alternatives Summary (2008 Rainfall) ....................................... ES-21 Table ES-11. Cost of

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    143 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us