APPENDIX – I (See paragraph 6) FORM 1 (I) Basic Information: Sl.No Item Details . 1 Name of the project “Granite Building Stone Quarry” of M/s Vismaya Rocks Private Limited 2 Sl. No. in the schedule 1(a) As per S.O. 141(E) dated:15.01.2016 3. Proposed capacity/area/length/tonnage Proposed Production capacity: 10,00,000 Tonnes /Annum To be handled/command area/lease Lease area:15.8000 Ha area/ number of Wells to be drilled. 4. New/Expansion/Modernization New Project for EC 5. Existing Capacity Area etc. New Project for EC 6. Category of Project i.e.' A' or 'B' ‘B2’ 7. Does it attract the general condition? If yes, No Please specify. 8. Does it attract the specific condition? If 'yes, No Please specify. 9. Location Re-Survey Block. No.50, Re-Survey Nos. 472/3, 472/4, 473/7-2, 473/6, 473/4-2, 473/4, 473/7, 472/5, 470/2-2, 471/5, 471/2, 470/8, 470/5, 470/7, 470/3-2, 470/9, 470/4, 470/2, 468/3, 473/8, 470/6, 470/3, 473/5, 470/10, 470/10-2, 472/1, 468/2, 471/1, 471/8, 474/8, 473/8-2, 472/6, 468/1-2, 474/7-2 (Patta Land),470/11, 470/1, 474/2 (Government Land) of Kummil Village, Kottarakara Taluk, Kollam District, Kerala State. Boundary Latitude Longitude Pillars 1 N-08°48'08.53" E-76°56'24.63" 2 N-08°48'14.04" E-76°56'23.71" 3 N-08°48'15.23" E-76°56'19.76" 4 N-08°48'15.90" E-76°56'16.06" 5 N-08°48'16.43" E-76°56'14.63" 6 N-08°48'18.39" E-76°56'12.74" 7 N-08°48'20.09" E-76°56'11.93" 8 N-08°48'22.27" E-76°56'12.33" 9 N-08°48'23.46" E-76°56'13.49" 10 N-08°48'24.24" E-76°56'14.34" 11 N-08°48'28.63" E-76°56'14.85" 12 N-08°48'28.69" E-76°56'16.29" 13 N-08°48'28.75" E-76°56'17.83" 14 N-08°48'27.31" E-76°56'19.17" 15 N-08°48'24.23" E-76°56'22.88" 16 N-08°48'21.98" E-76°56'24.21" 17 N-08°48'20.54" E-76°56'25.77" 18 N-08°48'19.71" E-76°56'27.86" 19 N-08°48'16.49" E-76°56'27.52" 20 N-08°48'14.47" E-76°56'28.72" 21 N-08°48'12.84" E-76°56'27.99" 22 N-08°48'09.85" E-76°56'27.58" 23 N-08°48'08.20" E-76°56'26.30" Plot/Survey/Khasra No. Re-Survey Block. No.50, Re-Survey Nos. 472/3, 472/4, 473/7-2, 473/6, 473/4-2, 473/4, 473/7, 472/5, 470/2-2, 471/5, 471/2, 470/8, 470/5, 470/7, 470/3-2, 470/9, 470/4, 470/2, 468/3, 473/8, 470/6, 470/3, 473/5, 470/10, 470/10-2, 472/1, 468/2, 471/1, 471/8, 474/8, 473/8-2, 472/6, 468/1-2, 474/7-2 (Patta Land),470/11, 470/1, 474/2 (Government Land) Village Kummil Tehsil Kottarakara District Kollam State Kerala 10. Nearest railway station/airport along with The nearest railhead is at Kadakavur is at 27 km from the site. Distance in kms. Nearest airport- Trivandrum International Airport (50km) 1 11. Nearest Town, city, District Headquarters Nearest Town : Kottarakara:26kms Along with distance in kms. District H.Q: Kollam:37kms Nearest City: Kottarakara:26kms 12. Village Panchayats, Zilla Parishad, Municipal Village office: Kummil Corporation, Local body (complete postal Panchayath Office: Kummil Address with telephone nos. to be given) 13. Name of the applicant Mr. Biju. M K 14. Registered Address Mr. Biju. M K, Managing Director, M/s Vismaya Rocks Private Limited, Karthika, Kuttikkadu P O, Kadakkal, Kadakkal, Kollam District- 691536, Kerala State, India. Ph No.: +91 9447141900 15. Address for correspondence: Name Mr. Biju. M K Designation (Owner/Partner/CEO) Managing Partner and Authorized Signatory Address Managing Director, M/s Vismaya Rocks Private Limited, Karthika, Kuttikkadu P O, Kadakkal, Kadakkal, Kollam District- 691536, Kerala State, India. Pin Code 691536 E-mail ---- Telephone No. Ph No.: +91 9447141900 Fax No. ---- 16. Details of Alternative Sites examined, if any. Not Applicable as mining is site specific activity. Location of these sites should be shown on a topo sheet. 17. Interlinked Projects No. 18. Whether separate application of interlinked No. Project has been submitted? 19. If yes, date of submission Not Applicable. 20. If no, reason Not Applicable. 21. Whether the proposal involves approval / Not Applicable clearance under: if yes, Details of the same and their status to be given. The Forest (Conservation) Act, 1980? The Wildlife (Protection) Act, 1972 The C.R.Z. Notification, 1991? 22. Whether there is any Government Order/ No Policy relevant/ relating to the site? 23. Forest land involved (hectares) No 24. Whether there is any litigation pending No Litigation is pending against the project and /or land in against the project and /or land in which which the project is proposed. the project is propose to be set up? Name of the Court Case No. Orders/directions of the Court, if any and its relevance with the proposed project. Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area for mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.,) (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate quantities /rates, wherever possible) Sl.N Information/Checklist confirmation Yes/No with source of information data 2 o. 1.1 Permanent or temporary change in land use, land Yes Land use:- Part of the proposed mining cover or topography including increase in intensity lease is private owned and remaining part of land use (with respect to local land use plan) is a government land with NOC from District Collector. There is expected to be change in the land use due to mining in the core zone. This will be confined within the Mining Lease Area. The highest elevation in this area is 180m MSL and the lowest elevation is 130.2m MSL At the end of life of mine, the entire pit at the conceptual stage shall be converted into rain water pond which would be used for agricultural, pisciculture or any other related activities. The pit shall also be developed for pisciculture surrounded with good local bio-diversified vegetation. 1.2 Clearance of existing land, vegetation and buildings? Yes The top soil capping in this area is about 0m to 1.5m. There is thin vegetation within this area. The vegetation and topsoil will have to be cleared for mining. There is no infrastructure or building located within this area. 1.3 Creation of new land uses? Yes The new land use pattern will be as follows at Conceptual stage. Particulars Land use pattern (Ha) (Conceptual ) Area for mining / mining 14.3358 activities Area for Safety Barrier / 1.4642 Green belt Total 15.8000 Total Mining Lease Area 15.8000 1.4 Pre-construction investigations e.g. bore houses, soil No Not Applicable testing? 1.5 Construction works? No There shall not be any construction inside the lease area. 1.6 Demolition works? No Not Applicable. 1.7 Temporary sites used for construction works or No Not Applicable. housing of construction workers? 1.8 Above ground buildings, structures or Yes This is a minor mineral mining project earthworks including linear structures, cut and fill or with an extent of 15.8000Ha. where in it is excavations proposed to excavate granite building stone in a scientific and phased manner with maximum annual production of 10,00,000 Tonnes/Annum 1.9 Underground works including mining or No Not Applicable tunneling? 1.10 Reclamation works? Yes At the end of life of mine, the entire pit at the conceptual stage shall be converted into rain water pond which would be used for agricultural, pisciculture or any other related activities. The pit shall be properly fenced with single opening for drawing the water. The pit shall also be develop for pisciculture surrounded with good local bio-diversified vegetation 1.11 Dredging? No Not Applicable 1.12 Offshore structures? No Not Applicable 1.13 Production and manufacturing processes? Yes Maximum Production Proposed is 10,00,000Tonnes/Annum, the mining will be done by opencast semi mechanised 3 method. The bench height and width proposed will be 6x6m. Rock will be drilled and blasted with non-electric blasting method. The material fragmented from the rock mass will be loaded into trucks with excavators. The loaded material will be transported to the consumers for port development at Vizhinjam port project and other infrastructure projects. 1.14 Facilities for storage of goods or materials? Yes As no crushing and screening plant is proposed with in the Mining Lease area the entire production of mineral will be dispatched from the mine excess topsoil/over burned will be stored properly in designated area as per Mining Plan and shall be later used for the reclamation of the mine.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages11 Page
-
File Size-