Klaipėda Lng Terminal)

Klaipėda Lng Terminal)

Priority Interconnection Projects 2019 Status Report Table of contents 1 GAS INTERCONNECTOR REPUBLIC OF POLAND-REPUBLIC OF LITHUANIA (GIPL) ......................................................................................................... 9 2 BRUA ...................................................................................................................................................................................................................... 15 3 EASTRING ................................................................................................................................................................................................................. 21 4 INTEGRATION AND SYNCHRONISATION OF THE BALTIC STATES’ ELECTRICITY SYSTEM WITH THE EUROPEAN NETWORKS ................................................. 24 5 ROMANIAN-HUNGARIAN-SLOVAK GAS TRANSMISSION CORRIDOR ................................................................................................................................. 27 6 DIVERSIFICATION OF GAS SUPPLY SOURCES AND INTEGRATION OF GAS INFRASTRUCTURE IN THE THREE SEAS REGION WITH THE IMPLEMENTATION OF THE BALTIC PIPE PROJECT AND CROSS-BORDER INTERCONNECTIONS REPUBLIC OF POLAND-SLOVAK REPUBLIC AND REPUBLIC OF POLAND-UKRAINE ............................................................................................................................................................................................................................ 29 7 IONIC ADRIATIC PIPELINE –IAP ................................................................................................................................................................................ 42 8 LNG TERMINAL ON THE ISLAND OF KRK WITH EVACUATION PIPELINE ........................................................................................................................ 45 1 TRANSPORTATION STOCK EXCHANGE IN THE 3SI REGION ............................................................................................................................................ 50 2 DIGITAL PLATFORM ON MONITORING HYDROGRAPHIC BASES IN THE 3SI REGION ........................................................................................................ 54 3 U-SPACE, LOW ALTITUDE SPACE AS A NEW FIELD OF ECONOMY. CENTRAL EUROPEAN DRONE DEMONSTRATOR (CEDD .............................................. 57 4 THE 3 SEAS DIGITAL HIGHWAY ................................................................................................................................................................................. 62 5 3SI MARKETPLACE ................................................................................................................................................................................................... 68 6 INTEROPERABILITY SOLUTIONS FOR A DIGITIZED AND SUSTAINABLE ENERGY SECTOR IN THE 3SI AREA IN THE FIELD OF ENERGY STORAGE ..................... 71 7 SMART CITY FORUM OF THE CEE REGION ................................................................................................................................................................ 74 8 ZALAZONE PROVING GROUND ................................................................................................................................................................................ 77 1 E65 (E66) NORTH-SOUTH CONNECTION – TEN-T COMPREHENSIVE SECTION ............................................................................................................. 81 2 VIA CARPATIA ........................................................................................................................................................................................................... 83 3 VIKING TRAIN ........................................................................................................................................................................................................... 88 4 BALTIC – ADRIATIC TEN-T CORE NETWORK CORRIDOR ............................................................................................................................................ 91 1 5 FAIRWAY DANUBE ................................................................................................................................................................................................... 95 6 RAIL BALTICA ......................................................................................................................................................................................................... 100 7 RAIL-2-SEA: "MODERNIZATION AND DEVELOPMENT OF RAILWAY LINE GDANSK(PL) – CONSTANȚA (RO)" (CIVIL-MILITARY DUAL-USE) ...................... 109 8 “AMBER” RAIL FREIGHT CORRIDOR ....................................................................................................................................................................... 114 9 VIA BALTICA ........................................................................................................................................................................................................... 117 10 DANUBE-ODER-ELBE CONNECTION ...................................................................................................................................................................... 128 11 SAVA IW SECTION BETWEEN JARUGE – NOVI GRAD ................................................................................................................................................ 134 1 HU-SI GAS INTERCONNECTOR ................................................................................................................................................................................. 139 2 SINCRO.GRID ..................................................................................................................................................................................................... 142 3 COMMISSIONING OF THE REGIONAL LNG TERMINAL IN PALDISKI, ESTONIA .............................................................................................................. 145 4 CONSTRUCTION OF THE 500MW ESTONIAN PUMPED-HYDRO ENERGY STORAGE (ESTONIAN PHES) ........................................................................ 148 5 „COMPRESSOR STATION 1“ AT THE CROATIAN GAS TRANSMISSION SYSTEM ................................................................................................................ 151 6 PURCHASE OF THE FSRU INDEPENDENCE (KLAIPĖDA LNG TERMINAL) ............................................................................................................. 154 1 PILOT PROJECT 5G PPDR – PUBLIC PROTECTION DISASTER RELIEF ...................................................................................................................... 158 2 NATIONAL PROGRAMME FOR THE DEVELOPMENT OF BROADBAND BACKHAUL INFRASTRUCTURE IN AREAS LACKING SUFFICIENT COMMERCIAL INTEREST FOR INVESTMENTS (NP-BBI PROGRAMME) ......................................................................................................................................................... 162 1 TUNNEL UNDER PETROHAN PASS ............................................................................................................................................................................ 168 2 MODERNISATION OF RAILWAY LINE DEVÍNSKA NOVÁ VES – STATE BORDER SK/CZ .................................................................................................... 171 3 CONSTRUCTION OF A5 MOTORWAY, SECTION: HUNGARIAN BORDER - BELI MANASTIR .............................................................................................. 175 4 MOTORWAY D3 ČADCA, BUKOV - SVRČINOVEC ....................................................................................................................................................... 179 ND 5 CONSTRUCTION OF THE 2 RAILWAY TRACK BETWEEN KOPER AND DIVAČA .............................................................................................................. 183 6 RECONSTRUCTION OF THE LJUBLJANA RAILWAY JUNCTION (LRJ) ............................................................................................................................. 185 7 RESTORATION OF THE DESIGN PARAMETERS OF RUSE-VARNA RAILWAY LINE .............................................................................................................. 188 8 UGS CHIREN EXPANSION ....................................................................................................................................................................................... 192 2 9 REHABILITATION OF RAIL SECTION ČAKOVEC – VARAŽDIN - (KOPRIVNICA) (63,32 KM), RAILWAY LINE ZAPREŠIĆ - ČAKOVEC AND RAILWAY LINE VARAŽDIN – DALJ ............................................................................................................................................................................................................... 196 10 CONSTRUCTION OF THE SECOND TRACK, RENEWAL AND MODERNIZATION OF THE RAIL SECTION .............................................................................. 199 11 REGULATION WORKS ON THE DANUBE RIVER ON KM 1,322 (SOTIN) ........................................................................................................................ 205 12 OIL AND GAS TERMINAL IN PORT OF PLOČE .........................................................................................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    234 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us