Cumberland Island National Seashore

Cumberland Island National Seashore

CUMBERLAND ISLAND NATIONAL SEASHORE Stabilization of Chimneys at Stafford Slave Settlement PROJECT SPECIFICATIONS 100% SUBMITTAL NPS INTERIOR REGIONS 1, 2, AND 4 ATLANTA FEDERAL CENTER 1924 BUILDING 100 ALABAMA STREET, SW ATLANTA, GEORGIA 30303 Joseph K. Oppermann – Architect, P.A. 539 North Trade Street Winston-Salem, NC 27101 August 21, 2020 REVISED: January 19, 2021 TABLE OF CONTENTS DIVISION 01 - GENERAL REQUIREMENTS 01 11 00 Summary of Work 01 26 01 Contract Modification Procedures 01 27 00 Definition of Contract Line Items 01 31 00 Project Management and Coordination 01 32 16 Construction Schedule 01 32 33 Photo Documentation for Historic Preservation Projects 01 33 23 Submittal Procedures 01 35 13.22 Archeological Protection 01 35 23 Safety Requirements 01 35 91 Historic Preservation Treatment Procedures 01 40 00 Quality Requirements 01 42 00 Reference Standards 01 50 00 Temporary Facilities and Controls 01 67 00 Product Requirements 01 73 40 Execution 01 74 19 Construction Waste Management and Disposal 01 77 00 Closeout Procedures 01 78 23 Operation and Maintenance Data DIVISION 02 – EXISTING CONDITIONS 02 42 96 Historic Removal and Dismantling DIVISION 03 - CONCRETE 03 30 00 Cast-in-place Concrete DIVISION 04 - MASONRY 04 03 22 Historic Brick Unit Masonry Repair 04 03 23 Historic Brick Unit Masonry Repointing DIVISION 05 - METALS 05 12 00 Structural Steel Framing DIVISION 06 – DIVISION 08 Not Used DIVISION 09 – FINISHES 09 91 13 Exterior Painting DIVISION 10 – DIVISION 49 Not Used APPENDICES Appendix 1 Masonry Materials Analysis and Testing Report, February 2020 CUIS – 189275 TOC – 1 TABLE OF CONTENTS SECTION 01 11 00 - SUMMARY OF WORK PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Work covered by the Contract Documents. 2. Contractor use of premises. 3. Public use of site. 4. Work Restrictions. 5. Special Construction Requirements. 6. Additional Reports. 1.2 WORK COVERED BY CONTRACT DOCUMENTS A. Project Location: Cumberland Island National Seashore, Stafford Slave Settlement, St. Marys, Georgia. B. The Work consists of the following: 1. The Work includes stabilization of the remnant chimneys at the Stafford Slave Settlement, including structural steel bracing, wood lintel replacement, and tabby brick and fired brick masonry repair, replacement and repointing. C. Project will be constructed under a single prime contract. 1.3 CONTRACTOR USE OF SITE A. General: Contractor shall have full use of the site for construction operations during the construction period. Contractor's use of the site is limited only by the Government's right to perform work or to retain other contractors on portions of Project. B. Storage of Materials: Confine storage of materials to the site or the Captain’s House. Contractor shall provide any temporary structures or equipment required for storage of materials. C. Preservation of Natural Features: 1. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government. 2. Provide temporary barriers to protect existing trees and plants and root zones. 3. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with Contracting Officer and remove agreed-on roots and branches that interfere with construction. 4. Do not fasten ropes, cables, or guys to existing trees. CUIS - 189275 01 11 00 - 1 091015 SUMMARY OF WORK 5. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage. 6. General mowing provided by nearby homeowner. D. Driveways and Entrances: Keep driveways and entrances serving premises clear and available to Government, Government's employees, residents, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. 1. Schedule deliveries to minimize use of driveways and entrances. 2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site. DI. Construction Camp: Establishing a camp in the park will not be permitted. Overnight camoing for any reason, including personal use, is prohibited. DII. Hauling Restrictions: Follow all legal load restrictions in the hauling of materials. Load restrictions on park roads are identical to the state load restrictions with such additional regulations as may be imposed by the Park Superintendent. Information regarding rules and regulations for vehicular traffic on park roads may be obtained from the Office of the Park Superintendent. A special permit will not relieve Contractor of liability for damage which may result from moving of equipment. 1.4 PUBLIC USE OF SITE A. The road will not be closed to the public during construction. 1.5 CONDUCT OF OPERATIONS A. The contractor shall conduct their operations to follow the rules and regulations the Secretary of U.S. Department of the Interior Service promulgates, and the applicable park rules and regulations. B. Work on Saturdays, Sundays, Federal holidays or at night may not be performed without the Contracting Officer's prior consent. Submit requests 48 hours before the work to the Contracting Officer for approval. C. No signs or advertisements (except those required) shall be displayed on the construction site or in the park unless the Contracting Officer approved it. 1.6 WORK RESTRICTIONS A. On-Site Work Hours: Work shall be generally performed during normal business working hours of 7:00 a.m. to 5:00 p.m., Monday through Friday, except when otherwise indicated. 1. Weekend Hours: 8:00 a.m. to 4:00 p.m. Work on weekends may not be performed without the Contracting Officer's prior consent. Submit requests 48 hours before the work to the Contracting Officer for approval. CUIS - 189275 01 11 00 - 2 091015 SUMMARY OF WORK 2. Early Morning Hours: Work earlier than 7:00 a.m. may not be performed without the Contracting Officer's prior consent. Submit requests 48 hours before the work to the Contracting Officer for approval. 3. Hours for Noise-producing Equipment: 8:00 a.m. to 4:00 p.m. B. Existing Utilities 1. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government. 2. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made per the contract's Changes clause. C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated: 1. Notify Contracting Officer not less than two days in advance of proposed utility interruptions. 2. Do not proceed with utility interruptions without Contracting Officer’s written permission. 3. Hours for Utility Shutdowns: 8:00 a.m. to 4:00 p.m. D. Nonsmoking Site: Smoking is not permitted on site. 1.7 SPECIAL CONSTRUCTION REQUIREMENTS A. NPS Ranger Access 1. If involvement by NPS CUIS personnel is required on site, Contractor shall provide at least 24 hours advance notice, if possible. B. Site Access 1. Water Vehicles a. Transport shall not be provided by NPS. b. Contractor to provide water transportation for personnel, equipment, and materials. c. In St. Marys, NPS to provide docking facilities for one (1) vessel up to 23 feet. d. On Cumberland Island, NPS to provide docking facilities at Captain’s House. e. Contractor to provide all required fuel and maintenance. f. Contractor to obtain NPS approval of all proposed vehicles. Only NPS approved vehicles may be used to access Cumberland Island. g. Contractor to check in daily with NPS and notify NPS in advance of docking times. 2. Land Vehicles a. Transport shall not be provided by NPS. CUIS - 189275 01 11 00 - 3 091015 SUMMARY OF WORK b. Contractor to provide and transport land vehicle to Cumberland Island. c. Land vehicle may be kept at Captain’s House when not being used for transport to site. d. Contractor to provide all required fuel and maintenance. Fuel may be provided via fuel cans or fuel trailer. Travel may be assumed to be approximately 12 miles per day. e. Contractor to obtain NPS approval of all proposed vehicles. f. Contractor vehicle use limited to project use only, from point A to point B, including Captain’s House, project site, Stafford comfort station, and fire truck location (water source). No personal use or travel to other areas of the island shall be permitted. 3. Parking a. Parking in St. Marys shall be on the roadway adjacent to the NPS docks. b. Parking on Cumberland Island shall be restricted to the project site and the Captain’s House. 1.8 ADDITIONAL REPORTS A. Masonry Materials Analysis and Testing Report, Stafford Slave Settlement, Cumberland Island National Seashore, Georgia, prepared by Building Conservation Associates, Inc., dated February 2020. B. Chimneys Revisited: Archeological Testing of Selected Slave Cabins at the Stafford Plantation, 9CM104 Cumberland Island National Seashore, Cumberland Island, Georgia, prepared by John E. Cornelison, Jr., and Meredith D. Hardy, dated 2014. C. Copies of these reports are available to all plan holders with this package. D. If conflicts occur between the report and drawings or specifications, the drawings and specifications govern. PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used) END OF SECTION 01 11 00 CUIS - 189275 01 11 00 - 4 091015 SUMMARY OF WORK SECTION 01 26 01 – CONTRACT MODIFICATION PROCEDURES PART 1 - GENERAL 1.1 SUMMARY A. The work of this section consists of administrative and procedural requirements for contract modifications. 1.2 DEFINITIONS AND ALLOWANCES A. Home Office Overhead: Those costs incurred in support of all of a contractor’s projects and not attributable to a specific job. The cost for home office overhead is only allowed as a percentage of all direct work excluding profit.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    302 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us