2016 Accepted Projects Report

2016 Accepted Projects Report

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2016 Accepted Projects Report City Accepted Amount AIRDRIE Construct a snow melt site, including the purchase of land. $4,802,400 Rehabilitate several roads. $3,076,316 BROOKS Rehabilitate roads and parking lots. $930,666 CALGARY Contribute funding to the Calgary Zoological Society to expand the $2,700,000 Calgary Zoo. Upgrade the Northeast light rail transit stations. $12,859,957 Construct an interchange at Glenmore Trail and Ogden Road. $87,850,001 Construct an interchange at Macleod Trail and 162 Avenue $53,250,000 Southeast, including transit lanes. Improve the interchanges at Stoney Trail, Sarcee Trail, and 112 $11,400,000 Avenue Northwest. Construct roadway connections to the Southeast Ring Road. $2,500,000 Expand the bus rapid transit network at North Crosstown. $16,600,000 Expand the bus rapid transit network at South Crosstown. $6,600,000 Expand and upgrade the Southwest transit route. $13,200,000 Expand and enhance the transit network at 17 Avenue Southeast. $32,600,000 Widen lanes and improve several intersections. $11,596,219 Prepare an assessment study and asset management plan for the $1,602,668 pedestrian walkway network. Construct several wheelchair access ramps. $1,700,000 Upgrade public works depots, including storage facilities and $11,650,000 storm water retention pond. Contribute funding to the Calgary Zoological Society $8,150,000 to redevelop and expand the Eurasian Gateway building at the Calgary Zoo. Construct an access road to Haskayne Legacy Park. $2,500,000 Expand and upgrade the pathway system. $10,163,000 Rehabilitate the Centennial Planetarium. $24,500,010 Prepare several transportation infrastructure studies. $14,600,000 Upgrade arenas at the Village Square Leisure Centre. $1,051,926 Prepare a regional transportation model. $3,410,000 Construct several roads and sidewalks. $1,523,000 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 1 Project descriptions and amounts include accepted amendments as of December 4, 2017. MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2016 Accepted Projects Report CALGARY Install traffic signals and cameras. $3,736,000 Construct several access roads. $9,066,000 Upgrade railway crossings. $2,844,000 Rehabilitate several arterial roads. $35,667,000 Contribute funding to the non-profit "cSpace Project" to convert $1,500,000 the King Edward School into a multi-disciplinary art space. Purchase right-of-ways to improve Crowchild Trail. $2,950,000 Widen a portion of McKnight Boulevard. $8,133,000 Replace a portion of Edmonton Trail, including sidewalks. $1,052,000 Upgrade a portion of 17 Avenue, including underground utilities. $20,213,000 Expand the radio communication system. $10,474,000 Rehabilitate the light rail transit tracks and switches. $3,839,000 Upgrade the light rail transit stations. $3,850,000 Rehabilitate several public transit buses. $2,853,000 CAMROSE Upgrade and expand the aquatic centre. $10,500,000 Replace the 48 Avenue bridge and a portion of roads. $1,250,000 Rehabilitate a portion of roads. $1,050,553 CHESTERMERE Prepare a master plan for the water, wastewater, and storm water $600,000 systems. Construct a public works storage shed. $600,000 Purchase public works vehicles. $225,000 Purchase a skid steer and attachments. $225,000 Construct the Rainbow Road pathway. $350,000 COLD LAKE Jointly upgrade the intersection at Highway 28 and Veterans $1,199,713 Drive with Improvement District 349. Extend and rehabilitate the Meadows storm water system. $1,600,000 EDMONTON Expand the Edmonton Valley Zoo. $19,939,053 Design and construct the light rail transit Valley Line, including the $20,915,000 purchase of land and vehicles. Purchase fire trucks. $4,546,500 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 2 Project descriptions and amounts include accepted amendments as of December 4, 2017. MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2016 Accepted Projects Report EDMONTON Upgrade the public transit buses with Smart Bus technology and $9,846,000 equipment. Upgrade the public transit communication and surveillance $7,832,511 system, including equipment. Upgrade the light rail transit facilities. $15,714,804 Rehabilitate and replace elevators and escalators in the light rail $10,686,501 transit stations. Replace the public transit radio system. $5,673,306 Upgrade the electrical system and traffic signals for the light rail $6,705,387 transit system. Upgrade bus shelters and transit centres. $6,209,085 Repave the busway at Belvedere Transit Centre. $2,767,675 Upgrade the West Edmonton Mall Transit Centre. $2,549,226 Rehabilitate and replace public transit buses. $53,309,978 Contribute funding to the Fort Edmonton Management Company $1,500,000 to construct kitchen facilities at Fort Edmonton Park. Upgrade the underground utilities and construct an access road at $63,690,000 Fort Edmonton Park. Upgrade Dermott District Park. $4,793,015 Replace the helicopter for law enforcement, fire rescue and $3,470,000 emergency services. Rehabilitate arterial roads. $122,309,061 Rehabilitate Jasper Avenue between 109 Street and 124 Street. $16,631,080 Rehabilitate 124 Street between 111 Avenue and 118 Avenue. $9,604,591 Rehabilitate 90 Avenue between 75 Street and 83 Street. $3,634,095 Rehabilitate Connors Road between 90 Avenue and 94 Street. $4,450,000 Rehabilitate 142 Street between 118 Avenue and Yellowhead Trail. $4,794,235 Rehabilitate Sherwood Park Freeway between 71 Street and 94 $6,382,372 Street. Rehabilitate 50 Street between 82 Avenue and 101 Avenue. $6,225,653 Rehabilitate bridges. $28,631,007 Rehabilitate and replace traffic mangement infrastructure, $13,787,000 including traffic lights, signals, and signage. Upgrade the light rail transit traffic signal system. $12,930,000 Rehabilitate and install street lighting. $26,044,000 Stabilize several slopes along right-of-ways, recreational trails, $11,920,000 and waterways. This report reflects the name and status in effect for each municipality at the time the report was produced. Page 3 Project descriptions and amounts include accepted amendments as of December 4, 2017. MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2016 Accepted Projects Report EDMONTON Rehabilitate several roads, including sidewalks. $35,963,401 Design and construct a park in the MacTaggart neighbourhood. $1,665,000 Design and construct a park in the McConachie neighbourhood. $1,254,000 Design and construct a park in the Allard neighbourhood. $2,353,000 Design and construct a park in the Granville neighbourhood. $2,595,000 Design and construct a park in the Orchards neighbourbood. $2,266,000 Design and construct a park in the Desrochers neigbourhood. $1,205,000 Replace the roof on several ambulance stations. $2,216,900 Upgrade the roof on several arenas. $1,869,000 Upgrade the roof on several soccer centres. $2,680,000 Replace the roof on several fire stations. $7,435,800 Upgrade the roof on several transit garages. $4,818,000 Upgrade and replace the roof on several recreational facilities. $4,866,000 Replace the roof on several operational services buildings. $1,018,000 Design and construct a park in the Southeast district. $1,122,474 Design and construct a park in the Walker neighbourhood. $1,618,693 Design and construct a park in the Secord neighbourhood. $1,419,065 Design and construct parks in the Hudson and $1,520,584 Laurel neighbourhoods. Design and construct a park in the Chappelle neighbourhood. $1,721,359 Rehabilitate several parks. $10,942,000 Construct and upgrade sidewalks, paths, and bike routes. $13,285,000 Construct a bikeway along 83 Avenue. $3,731,000 Replace light rail vehicle equipment. $5,416,776 Widen Whitemud Drive. $12,585,998 Replace the 53 Avenue Bridge. $10,260,000 Design and construct an interchange at 23 Avenue and Gateway $1,837,882 Boulevard. Replace the roof at the Muttart Conservatory. $1,450,000 Construct an interchange at 41 Avenue Southwest and Highway 2. $23,322,042 Develop and install pedestrian signage. $1,981,605 FORT SASKATCHEWAN Upgrade City Hall. $850,000 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 4 Project descriptions and amounts include accepted amendments as of December 4, 2017. MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2016 Accepted Projects Report FORT SASKATCHEWAN Upgrade Fort Heritage Precinct. $305,000 Rehabilitate a portion of roads. $1,176,068 Rehabilitate roads, including sidewalks and underground utilities. $988,000 Construct an outdoor sports field and field house at the Dow $8,624,391 Centennial Centre. Upgrade the curling rink. $3,500,000 Rehabilitate roads, including sidewalks and underground utilities. $936,000 GRANDE PRAIRIE Rehabilitate a portion of roads. $8,239,950 Rehabilitate several sidewalks and pathways. $1,675,000 Upgrade storm waterlines. $2,000,000 LACOMBE Upgrade roads in the Regency Subdivision and Woodland Avenue. $484,876 Expand and upgrade the Lacombe Sportsplex. $3,165,865 Rehabilitate a portion of Riviera Drive and 63 Avenue. $617,560 Construct a walking trail. $165,000 Construct a ball diamond in Michener Park. $172,000 LETHBRIDGE Upgrade 43 Street North. $1,100,000 Rehabilitate roads, including sidewalks and wheelchair access $1,530,000 ramps. Replace the traffic control equipment and technology. $2,300,000 Rehabilitate several railway crossings. $1,258,000 Upgrade Whoop Up Drive. $3,886,000 LLOYDMINSTER Rehabilitate roads. $1,400,000 Upgrade and widen intersections. $400,000 Rehabilitate a portion of 25 Street. $500,000 MEDICINE HAT Upgrade the storm water system, including installation of a storm $3,160,000 trunk, outfall structure, and wetland facility. Rehabilitate several roads, including sidewalks and storm water $2,778,453 drainage. This report reflects the name and status in effect for each municipality at the time the report was produced.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    39 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us