Minutes of The

Minutes of The

NORTH DAKOTA LEGISLATIVE MANAGEMENT Minutes of the WATER-RELATED TOPICS OVERVIEW COMMITTEE Monday, July 16, 2012 Viking Room, Grand International Inn, 1505 North Broadway Minot, North Dakota Tuesday, July 17, 2012 Williston State College, 1410 University Avenue Williston, North Dakota The committee toured Minot flood damage and flood hazard mitigation request. He said the goal of flood mitigation infrastructure development during the this process is to demonstrate to the Federal morning of Monday, July 16, 2012. Emergency Management Agency (FEMA) that the Representative Curt Hofstad, Chairman, called the value of project benefits exceeds construction costs. meeting to order at 1:00 p.m. Hazard mitigation project applications and progress, Members present: Representatives Curt Hofstad, he said, include the Sixth Street SW underpass pump Bill Devlin, Curtiss Kreun, Jon Nelson, Kenton Onstad, station and storm drain improvements, water Jim Schmidt; Senators Randy Burckhard, Larry Luick, treatment plant flood mitigation, elimination of gravity George L. Nodland, Connie Triplett sewer river crossings, consolidation of storm sewer Members absent: Representatives Chuck outfalls, improvement in the city's communications Damschen, Lee Kaldor; Senator Tony Grindberg network, and upgrading six lift stations with Others present: Patrick Hatlestad, State emergency generators. Representative, Williston Mr. Jonasson also reviewed the preliminary Matthew M. Klein, State Representative, Minot engineer's report for the Mouse River enhanced flood Scott Louser, State Representative, Minot protection project. He said the scope of the project is Andrew Maragos, State Representative, Minot to design a flood risk reduction project from Burlington Roscoe Streyle, State Representative, Minot to Velva and Mouse River Park for the June 2011 Stanley W. Lyson, State Senator, Williston flood of record. See Appendix A for additional persons present. Mr. Jonasson also updated the committee It was moved by Representative Nelson, concerning the Northwest Area Water Supply Project. seconded by Senator Burckhard, and carried on a He said the State Water Commission is currently voice vote that the minutes of the April 19, 2012, working on filter reconstruction at the water treatment meeting be approved as distributed. plant. He said water service to the Minot Air Force Base, Glenburn, and Lansford is anticipated in 2012, MINOT FLOOD DAMAGE AND and then the project design work will commence for FLOOD MITIGATION the northern tier facilities. He said the project will file a supplemental environmental impact statement in the INFRASTRUCTURE DEVELOPMENT fall of 2012 with a record of decision expected in Chairman Hofstad recognized Mr. Dan Jonasson, spring or summer of 2013. Director of Public Works, City of Minot. A map of In response to a question from Representative proposed infrastructure development in the Mouse Kreun, Ms. Cindy Hemphill, Director of Finance, City River Valley and a map of the city of Minot used by of Minot, said Minot is reviewing the feasibility of Mr. Jonasson in his presentation is on file in the paying the entire nonstate cost-share of the flood Legislative Council office. A study entitled Mouse control project with a potential sales tax. She said if River Enhanced Flood Protection Preliminary Minot pursues this option, it would like to review the Engineering Report: Executive Summary is attached cost-share split between the state and local entities for as Appendix B, and a PowerPoint used by the project. Mr. Jonasson in his presentation is attached as In response to a question from Representative Appendix C. Mr. Jonasson said 4,100 structures were Nelson, Mr. Jonasson said current aquifers cannot damaged by the June 2011 flood. He said 350 to sustain normal growth much less accelerated growth 400 homes will probably need to be demolished as for the city of Minot. Thus, he said, it is essential that they cannot be made habitable. Another challenge Missouri River water be accessed for domestic water facing the city of Minot, he said, is the increase in for the city of Minot and northwest North Dakota. solid waste coming in to the Minot landfill. He said In response to a question from Senator Luick, this will decrease the working life of the landfill. He Mr. Jonasson said the city sewer system has not kept said the city is also in the process of developing a up with growth in the city of Minot. Water-Related Topics Overview 2 July 16-17, 2012 Chairman Hofstad recognized Mr. Curt Zimbleman, portion of the basin is beginning to reappear. For the Mayor, Minot. Mr. Zimbleman addressed wastewater, first time since 1993, he said, the lake is declining and sewer, and landfill issues. Each of these issues, he both outlets are operating. He said construction of the said, must be addressed by the city of Minot. outlets took nine months which was a tremendous engineering achievement. He said the need to blend STATE WATER COMMISSION water from the two outlets to meet water quality Chairman Hofstad recognized Mr. Todd Sando, standards on the Sheyenne River adds to the State Engineer, State Water Commission. Mr. Sando complexity of Devils Lake flood relief. addressed the 2011 flood incidents in North Dakota In response to a question from Representative and water project development in North Dakota. He Nelson, Mr. Sando said the State Water Commission said the state is making great progress addressing the is studying constructing a third gravity outlet to flood incidents of 2011. He said the State Water address any future emergency at Devils Lake. He Commission has put an acquisition process in place said flexibility was the key to the speed with which the for the affected counties. He said the commission has Devils Lake Outlet was constructed. He said the approved a cost-share of 75 percent state and ability of the commission to move money where it is 25 percent nonstate for projects located within the needed and projects are ready to be constructed is affected counties. very beneficial rather than having money allocated or Concerning the Souris River Valley, Mr. Sando set aside for a specific project which for one reason or said the State Water Commission has established a another may not be ready for construction. task force to examine the entire valley to address In response to a question from Senator Luick, Mouse River flooding. He said this study will Mr. Sando said the west end outlet has an ability to determine at what level flood protection should be pump water down to a level of 1,445 feet mean sea provided at various locations in the valley. He said level. He said the current lake elevation is 1,453 feet this study will be time-consuming in that it must mean sea level. At a level of 1,445 feet mean sea necessarily involve Canadian concerns as well as level, he said, 100,000 acres could be reclaimed. North Dakota concerns. Also, he reminded the committee that 1,445 feet mean In response to a question from Senator Burckhard, sea level is still above the 1,428-foot mean sea level Mr. Sando said the Minot flood control project is more meander line. complicated than most in North Dakota because it In the north central part of the state, Mr. Sando involves considerations in another country. said the State Water Commission is working to In response to a question from Representative resolve flood issues at Rice Lake. Concerning Valley Nelson, Mr. Sando said the State Water Commission City, he said, the commission is undertaking an is working with the North Dakota Water Coalition and economic feasibility study to build a levee system the Office of Management and Budget on its through the city. He said this is anticipated to be a recommendations for the 2013-15 executive budget. $40 million to $50 million flood control project. He He said the Minot project will be similar in size and said the commission also is undertaking a feasibility magnitude to the Grand Forks flood control project study to provide flood control for Jamestown, which took 10 years to complete. He said initial LaMoure, and Oakes in the James River system. He expenditures will be small compared to future said other flood control issues include Burleigh County expenditures as the project ramps up. He said it and Bismarck as well as Fargo, Grafton, and Park appears the initial request will be $50 million for Minot River. and $75 million for other flood control projects for the Concerning the Western Area Water Supply 2013-15 biennium. Project, Mr. Sando said the authority has begun In response to a question from Senator Triplett, awarding contracts, and the State Water Commission Mr. Sando agreed that any levees must be set back has approved $100 million for the project. However, far enough to give the river room to pass through the he said, bids for expansion of the Williston water city, and levee alignment is crucial in any flood control treatment plant were deemed to be too high, and the project. authority is considering how to proceed. In response to a question from Representative Concerning the Southwest Pipeline Project, Hofstad, Mr. Sando agreed that current assets in the Mr. Sando said the Southwest Water Authority is resources trust fund are not adequate to address all of having to curtail industrial usage because of growth North Dakota's water infrastructure needs. However, and hot weather. He said $13 million will be he said, although needs far exceed revenues, expended on the project during the current biennium revenues are strengthening and on a very positive with $49 million expected for the 2013-15 biennium as trend. He said the State Water Commission would there are major infrastructure needs in the west. like to focus on western water needs during 2013-15 In response to a question from Representative and then, as Mouse River and Fargo flood control Hofstad, Mr.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    4 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us