CORRIDOR Vc COMPLETION PROJECT Loan No.: 41325

CORRIDOR Vc COMPLETION PROJECT Loan No.: 41325

CORRIDOR Vc COMPLETION PROJECT Loan no.: 41325 Contract title: Civil works on construction of A5 Motorway Subsection (Beli Manastir - Osijek - Svilaj): "Drava Bridge - Osijek Interchange" (in a total length of 3.8 km) Publication ref.: CVcCP /OT/civil works/DB–OI (i) Name of each tenderer who submitted a Tender 1. Viadukt d.d. (Zagreb, Croatia); 2. Strabag AG (Spittal/Drau, Austria); 3. Swietelsky B.m.b.H. (Zagreb, Croatia); 4. Integral Inženjering AD (Laktaši - Banja Luka, Bosnia and Herzegovina); 5. Joint Venture: GP Krk d.d. (Krk, Croatia) - leading partner; Hidepito ZRT (Budapest, Hungary) - partner; (ii) Tender prices as read out at Tender opening (excluding VAT); 1. 16.852.270,30 EUR 2. 17.346.863,43 EUR 3. 16.571.692,32 EUR 4. 18.927.827,30 EUR 5. 19.156.809,01 EUR (iii) Name and evaluated prices of each Tender that was evaluated; 1. Viadukt d.d. (Zagreb, Croatia); Evaluated price: 14.929.943,65 EUR 2. Strabag AG (Spittal/Drau, Austria) Evaluated price: 16.520.822,31 EUR 3. Swietelsky B.m.b.H. (Zagreb, Croatia); Evaluated price: 15.782.564,11 EUR 4. Integral Inženjering AD (Laktaši - Banja Luka, Bosnia and Herzegovina); Evaluated price: 16.234.419,11 EUR (iv) Name of tenderers whose Tenders were rejected; Joint Venture: GP Krk d.d. (Krk, Croatia) - leading partner; Hidepito ZRT (Budapest, Hungary) - partner; (v) Name of the winning tenderer, and the price it offered, as well as the duration and summary scope of the contract awarded; Name of the winning tender: Viadukt d.d. (Zagreb, Croatia); Price it offered (contract price): 15.676.440,83 EUR (excluding VAT) Contract duration: 24 months from the Commencement Date Summary scope of the contract awarded: The 3.8 km long sub-section is located between the Drava Bridge (presently under construction) and the existing Osijek interchange The Tender Documents include construction works on the main route of the motorway, road crossing Petrijevci (991m) with 72 m long overpass with four spans, Josipovac viaduct, 294 metres long with 9 spans on the motorway route, internal and external drainage and side roads. Fill material for the motorway embankment can be partly sourced from the existing sand deposits located on the northern bank of the Drava river and partly sourced from other locations selected by the Contractor. NOTE: After publication of the award, unsuccessful tenderers may request in writing to the Employer for a debriefing seeking explanations on the grounds on which their Tenders were not selected. The Employer shall promptly respond in writing to any unsuccessful tenderer who, after Publication of contract award, requests a debriefing. .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us