EUROCONTROL Experimental Centre, France Director

EUROCONTROL Experimental Centre, France Director

ICAS Workshop 3rd October 2005 “Single European Sky” Implementation Plan - SESAME Jan Van Doorn EUROCONTROL Experimental Centre, France Director European1 Organisation for the Safety of Air Navigation Demand z Aviation is in full expansion z Traffic demand up by 5% z Some Eastern European Countries with spectacular increases of 20% + Growth 2005-2011 2 Single European Sky Air Traffic Management Package z Airspace z High Level Group 2000 z Service Provision z Proposals for Single European Sky 2001 z Charging regime z Equipment (interoperability) z Conciliation concluded in 2003 z Legislation passed end 2004 z Memorandum with Eurocontrol (Implementing Rules) z Commission in charge of implementation, supported by: z Single Sky Committee z Industry Consultation Body 3 SESAME Background Following Single European Sky Legislation z Eurocontrol – AECMA (ASD) implementation road mapping z Air Traffic Alliance – “DEPLOY” proposal to EC (SES implementation support) z EC referral to Eurocontrol z TEN-T proposal (SESAME Initiation “was DEPLOY”) z Accepted for funding by EC TEN-T committee z Single tender received by Eurocontrol z Negotiation complete – contract ready for signature z Long term programme from late 2007 – EC funded 4 A European ATM Master Plan To Unlock Air Transport SESAME EC initiative to support Single European Sky Converging analyses & Converging analyses & (SES) technical/operational implementation, in initiativesinitiatives from from Industry, Industry, EC EC & & addition to the regulatory framework EUROCONTROL EUROCONTROL 2 Phases: Needs:Needs: z Definition of a European ATM Master Plan (Î mid- z 2007), geared to, & followed by… zTurTurnn off offthethe fragmented fragmented approach approach z z Implementation (2007-20) zAccelerateAccelerateEuropeanEuropean ATM ATM evolution evolution & & respondrespond to to Air Air Transport Transport challenges challenges ONE, Common Master Plan for Research and z Synchronise & integrate plans from z Synchronise & integrate plans from Implementation researchresearch to to operations operations z ATM industry, operators & users, civil & military, z Synchronise airborne and ground z Synchronise airborne and ground together in defining, committing to, and carrying deployments deployments out the plan z Based on future requirements & current plans z Agreed change steps Actions & means to make change happen 5 Concept Elements z ATM2000+ and Eurocontrol Operational Concept Document + Portfolio of concept and performance documents Operational Concept – Vision for 2020 + CATM HLOC detailing an integrated ATM system Concept of Operations + CATM Mode of Operation Operational Requirements + CATM OSEDs + OATA Use Cases Logical Architectural Model Performance Requirements 6 Addressing Different Timeframes 2005 2010 2015 2020 Implementation Implementation Deployment Phase I Phase II Foundation Definition Applied R&D Industrialisation Deployment Phase SES Deployment Innovative R&D Applied R&D Industrialisation Deployment Collaborative – High Performance ATM 2005 2010 2015 2020 Building upon an evolving institutional & regulatory framework 7 Financing z Initiation: 60 million Euro / 2 years (100% funding for industry consortium z European Commission TEN-T z 30 Million Euro z Eurocontrol z 10 Million investment z 10 Million in kind (deliverables) z 10 million staff effort 30 Million Euro z Programme: Financing to be agreed 8 Opportunity z Manage European Research according to SESAME z Joint Undertaking launched by EC z Targeted EC finance z Eurocontrol aligned accordingly z ACARE SRA1/2 supported through the 7th Framework Programme from 2007 z Joint Technology Initiative z New working arrangements: z EATM - support of SESAME z Experimental Centre - strategic alliances 9 Looking for the Paradigm Shift “VISION 2020” z ‘Group of Aeronautics Personalities’ goal for Europe z World class leader in the field of aeronautics. z Through: Coordinated collaborative effort, strengthened and guided by a single shared vision & creation of a common framework for research and technological development. z To better serve the needs of European society: Safety, Capacity, Efficiency, Flexibility & Predictability z Responding to issues of public interest including: Noise & emission reduction, reduced travel delays & security. The EUROCONTROL Air Traffic Management 2000+ strategy and the Vision 2020 are aligned together with the ACARE Strategic Research Agenda 10 ACARE z Strategic Research Agenda 2 (SRA 2): z A holistic and integrated view of the European Air Transport System z Meeting societies needs whilst seeking global leadership z High level target concepts - extreme challenges for leading edge research z ATM – a main pillar in SRA 2 z Operational concept vision z Input to each “High Level Target Concept” z Lines of research z Air Traffic Management Challenge - The key infrastructure baseline for the Air Transport System Safely catering for 2 / 3 times traffic growth scenarios > 2020 11 ACARE Five High Level Target Concepts ATM lines of research Highly customer Ultra secure oriented High Level ATM Concept Highly cost Ultra green efficient Supported by a High Highly time Level ATM Concept efficient 12 ACARE z Main themes from the ATM concept: - searching for the “Paradigm Shift?” – challenge the “capacity wall!!” z Safety is “non- negotiable” z Modes of Operation z Dependent on Levels of Service z Density of Traffic z Exploiting z Network wide managed system z Integrated Air Ground approach - System Wide Information Management z 4D Trajectory Management and precision navigation z Aircraft Autonomous Operations / Airborne Separation Assistance System z Human System Automation Support – decision support tools z Exploiting Aircraft Communication and Navigation capability z Integrated Airport and ATM processes with environment considerations 13 Effect on European ATM - Safety z Air / Ground integration – data exchange z Autonomous Aircraft Operations – self separation z UAV in civil airspace z 4D Trajectory Management z Ground system automation Certification issues for both aircraft and ground systems 14 Leading, and Cooperating z Europe - positioning as Leader, Competitor, and Innovator in global aviation z But Global Cooperation required on: z Concepts z Standards z Systems z Working with the US through Memorandum of Cooperation with FAA z Working inside ICAO z ATM Concept z Performance based z SARPS … 15.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    15 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us