Florida Department of Transportation

Florida Department of Transportation

FLORIDA DEPARTMENT OF TRANSPORTATION - DISTRICT FOUR 95 EXPRESS LANES PHASE 3B-2 PROJECT I-95 from south of Glades Road to Linton Boulevard and SR 808/Glades Road from NW 22nd Way to West University Drive, Palm Beach County, Florida Financial Project ID Numbers: 433109-5-52-01, 02/412420-4-52-01 & 435384-1-52-01 FDOT District 4 Website: www.d4fdot.com I-95 NORTHBOUND AT YAMATO ROAD TO UNDERGO FULL NIGHTLY CLOSURE MAY 2, 4 & 5 I-95 northbound lanes at Yamato Road will be closed to traffic overnight Sunday, May 2, Tuesday, May 4 and Wednesday, May 5 so that crews can safely demolish the existing Clint Moore Road bridge over I-95 northbound. The first lane will close at 9 p.m., the second lane will close at 9:30 p.m., and all lanes will be closed by 10 p.m., reopening by 5:30 a.m. each morning. Traffic will be detoured via the- I 95 northbound exit ramp to Yamato Road, Congress Avenue, Peninsula Corp. Drive and the I-95/Congress Avenue interchange. The I-95 northbound entrance ramps from Yamato Road and Spanish River Boulevard will also be closed to traffic during this time. FHP will be on site to assist motorists. 95 Express Lanes Phase 3B-2 will extend the existing Express Lanes north from just south of Glades Road to south of Linton Boulevard in Palm Beach County. One lane will be added and the High Occupancy Vehicle (HOV) lane will be converted to create two Express Lanes in each direction; the number of General Use lanes will remain the same. Access to the Express Lanes will be provided via two designated ingress and egress locations—between Glades Road and Spanish River Boulevard and between Yamato Road and Linton Boulevard. The scope of work includes reconfiguration of the SR 808/Glades Road Interchange to a Diverging Diamond Interchange (DDI). CONTACT INFORMATION WEB AND SOCIAL MEDIA Ariam Galindo, P.E., Senior Project Manager Project website: www.d4fdot.com [email protected] or (561) 370-1146 Facebook: www.facebook.com/MyFDOTSEFL/ Andrea Pacini, I-95 Community Outreach Specialist [email protected] or (561) 214-3358 Instagram/Twitter:@MyFDOT_SEFL Construction Cost: $148 million Construction Start: November 7, 2019 Anticipated Completion: Late 2023 FLORIDA DEPARTMENT OF TRANSPORTATION MISSION STATEMENT The Department will provide a safe transportation system that ensures the mobility of people and goods, enhances economic prosperity, and preserves the quality of our environment and communities. Updated: 4/29/2021 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us