Audun Hustoft: Statnett in the North

Audun Hustoft: Statnett in the North

Statnett in the North Saint-Petersburg, February 28, 2014 President Arctic Program Audun Hustoft, Statnett Statnett in brief • The Norwegian TSO (Transmission System Operator) • Statnett owns and operates: Alta • 11.000 km power lines - the national grid • 150 transformer stations • National and regional control centre • interconnections to five countries including 4 HVDC subsea cables • Russia, Finland, Sweden, Denmark, The Netherlands Sunndalsøra • Number of employees : 1100 Oslo • Offer international consultancy service • Statnett SF is a 100 %state-owned enterprise, administrated by the Ministry of Petroleum and Energy 12 March 2014 The next generation national grid CAPEX 50-70 bill NOK in coming 10 year period 420 kV 2013 300 kV 2030 <300 kV Grid development towards 2030 is driven by: Electrification / New renewables Petroleum Industry Industry Population growth Where- How much- When? Undiscovered petroleum resources – a driver of the grid development in the North Kilde : OD Norway is facing large growth in power generation and grid investments Investments in the power system (Mrd. NOK) 30 Expected investments 25 20 Production facilities kroner) - 15 Historical investments The Mrd. NOK (2010 10 Regional- and Distribution grid 5 The National grid = Statnett 0 1975 1977 1979 1981 1983 1985 1987 1989 1991 1993 1995 1997 1999 2001 2003 2005 2007 2009 2011 2013 2015 2017 2019 2021 Kilde: Statnett, SSB, NVE, NUP 2011, RKSUer, THEMA Consulting Group Northern Norway. The main electricity grid 2014. - Low grid capacity (132 kV) -Insufficient security of supply -Restrictions for new load -Restrictions for new generation- 12.03.2014 Grid development strategy for Northern Norway New 420 kV line Ofoten- 420 kV line Balsfjord and Balsfjord-Skaidi Skaidi- Varangerbotn Skogfoss – Nikel? Varangerbotn- Finland? 12 March 2014 420 kV Ofoten – Skaidi (Hammerfest) -the longest HV power line in Norway • 513 km Ofoten-Hammerfest • 1546 towers • 21 000 ton steel for towers • 15-22000 m3 concrete • 30 000 ton conductors, insulators and fittings Ørskog-Sogndal Sima-Samnanger Hammerfest Skaidi Step – by – step: Step 3: Ofoten-Balsfjord-Skaidi-Hammerfest Alta Step 2: Balsfjord Bardufoss Step 1: Kvandal Starting 2014 Ofoten 420 kV Ofoten to Skaidi Ofoten-Balsfjord 3 years construction period Construction starting Q2 2014 Estimate 3-4 billion NOK Balsfjord-Skaidi 6-7 years construction period Awaiting final license Project schedule to be adapted to consumption growth and power production developments 420 kV Skaidi –Varangerbotn; next step for increased east-west interconnection Planning has started Triggered by oil and gas industry consumption growth Important and interesting for Step 4: stronger Nordic / 215 km Russian interconnection Boris Gleb - Kirkenes Power from Boris Gleb hpp to Kirkenes is a well established electricity trade between Norway and Russia The grid is owned by Statnett – the power is sold by InterRAO Nordic OY to the market at NordPool Good and positive international co- operation A future possible bidirectional power exchange Nikel – Skogfoss has been evaluated Norway together with Inter RAO Purpose: Electricity exchange and Russia Skogfoss increased security of supply in both Nikel regions Possible capacity: Step 1: 100-150 MW. Step 2: 250 MW Planning can continue, but conditions for start of operation are set by the Norwegian Government 14 Possible development in the Arctic … Skaidi - Varangerbotn • Increased security of supply Skogfoss – Nikel • Power exchange • Increased security of supply ? Varangerbotn – Ivalo • Two-sided supply of the northern areas is of importance to the security of supply Reinforcements southward of Ofoten ? • Increased security of supply • Secures balance and capacity 12 March 2014 Key challenges to implementation inn the north Reindeer husbandry Time consuming processes to build new lines • Approx 8 – 10 years Coordination with petroleum industry and new renewable generation required Extensive plans to build new lines all over Europe (ref. ENTSO-E Ten Year Network Development Plan) • The same suppliers 12 March 2014 Thank you for your attention ! www.Statnett.no 12 March 2014 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    17 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us