NORTHERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION and REPLACEMENT for 2014-15 (Figures in Thousand of Rupees) Item Particulars Allocation RE 2014-15 No

NORTHERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION and REPLACEMENT for 2014-15 (Figures in Thousand of Rupees) Item Particulars Allocation RE 2014-15 No

3.1.1 NORTHERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item Particulars Allocation RE 2014-15 No. NEW LINES (CONSTRUCTION) A - Works in Progress 1 Nangal Dam-Talwara (83.74 km) - New broad gauge line & taking over siding Cap. 30,00,16 Mukerian-Talwara (29.16 km) 2 Abohar-Fazilka (42.717 km) Cap. 1,00,00 3 Tarantaran-Goindwal (21.5 km) Cap. 30,00 4 Chandigarh-Ludhiana (112 km) Cap. 20,25,00 EBR 5,00,00 5 Rewari-Rohtak (81.26 km) incl. new material modification for shifting of Rohtak - Cap. 12,00,00 Gohana - Panipat through bypass line EBR 20,00,00 6 Jind-Sonepat (88.9 km) Cap. 117,49,78 EBR 45,00,00 7 Jawarhar Lal Nehru Port-Tughlakabad-Dadri via Ahmedabad & Palanpur - Dedicated Cap. 764,00,00 multimodal high axle load freight corridor - Land acquisition 8 Dankuni - Ludhiana - Dedicated multimodal high axle load freight corridor - Land Cap. 286,00,00 acquisition 9 Chandigarh-Baddi (33.23 km) Cap. 13,00 EBR 2,00,00 10 Deoband (Muzaffarnagar)-Roorkee (27.45 km) Cap. 1,00,00 EBR 5,00,00 11 Bhanupalli-Bilaspur-Beri (63.1 km) Cap. 2,00,00 EBR 5,00,00 12 Rishikesh-Karnaprayag (125.09 km) Cap. 20,00,00 13 Qadian-Beas (39.68 km) Cap. 1 14 Unchahar-Amethi (66.17 km) Cap. 56,00 15 Rohtak-Meham-Hansi (68.8 km) Cap. 1,00,00 EBR 10,00,00 16 Delhi - Sohna - Nuh - Firozpur Jhirka - Alwar (104 km) Cap. 1 17 Yamuna Nagar - Chandigarh via Sadhaura, Narayangarh (91 km) Cap. 1 18 Faizabad - Lalganj via Akbarganj, Maharajganj and Raebareli (116 km) Cap. 1 19 Hissar - Sirsa via Agroha & Fatehabad (93 km) Cap. 1 21 Ferozpur - Patti (25 km) Cap. 1 TOTAL-WORKS IN PROGRESS Cap. 1255,74,00 EBR 92,00,00 TOTAL-New Lines (Construction) Cap. 1255,74,00 EBR 92,00,00 NEW LINES (CONST.) - DIVIDEND FREE PROJECTS A - Works in Progress 22 Udhampur-Srinagar-Baramula (290 km) Cap. 1300,00,00 TOTAL-WORKS IN PROGRESS Cap. 1300,00,00 TOTAL-New Lines (Const.) - Dividend free projects Cap. 1300,00,00 3.1.2 NORTHERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item Particulars Allocation RE 2014-15 No. DOUBLING A - Works in Progress 23 Raebareli - Amethi (60.1 km) Cap. 10,00 24 Jalandhar-Pathankot-Jammu Tawi (211.26 km) Cap. 1,75,00 C.Fund .. 25 New Delhi-Tilak Bridge - 5th & 6th line (2.65 km) Cap. .. Dep(RVN) 2,98,00 26 Dayabasti - Grade separator Cap. 6,00,00 C.Fund .. 27 Hapur-Kankather (42.71 km) Cap. 1 C.Fund .. 28 Utretia-Zafrabad - Doubling of balance 148 km section with MMs for Rae Bareli - Cap. 167,31,97 Akbarganj (46.9 km) & Sultanpur - Amethi (29.22 km) with new MM of Sultanpur - Kadipur (38.7 km) - new lines C.Fund .. 29 Tughlakabad (Joint Cabin)-Palwal - 4th line (33.5 km) Cap. 26,00,00 C.Fund .. 30 Khukrana-Panipat Cap. 1,00,00 31 Jakhal-Mansa - Doubling on SPR section Cap. 4,70,00 C.Fund .. 32 Phaphamau-Allahabad (12.9 km) with new material modification for bypass line Cap. 10,00,00 between Northern Railway and North Eastern Railway track 33 Mansa-Bhatinda (Phase-I), incl. new material modification for Rama Mandi (Raman) - Cap. 37,00,00 Sada Singhwala via Talwandi Sabo (29.11 km) - new line 34 Lohta-Bhadoi (39 km) Cap. 35,00,00 35 Ambala Cantt-Dhapper (Phase-I), with new material modificaton of Dhapper - Cap. 36,00,00 Chandigarh (22.71 km) 36 Chakki Bank-Bharoli (3.5 km) Cap. 3,76,00 37 Jalandhar Cantt-Suchi Pind - Doubling with electrification (3.5 km) Cap. 4,80,00 38 Sambha-Vijaypur Jammu - Doubling across Basanter bridge Cap. 15,00,00 39 Bhadohi-Janghai (31 km) Cap. 35,00,00 40 Kathua-Madhopur Punjab - Doubling across Ravi bridge Cap. 70,00 41 Kathua-Madhopur - Doubling accross bridge No.16, 18 & 19 Cap. 3,42,00 42 Mirthal-Bhangala - Doubling across Beas bridge Cap. 20,00,00 43 Utretia-Rae Bareli (65.6 km) Cap. 10,00,00 44 Anand Vihar-Tilak Bridge - 3rd & 4th line (9.77 km) Cap. 18,00 45 Meerut-Muzaffarnagar - Patch doubling (55.47 km) Cap. 15,00,00 46 Haridwar-Laksar (27.03 km) Cap. 2,38,00 TOTAL-WORKS IN PROGRESS Cap. 435,10,98 Dep(RVN) 2,98,00 3.1.3 NORTHERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item Particulars Allocation RE 2014-15 No. DOUBLING B - New Works 47 Works costing below Rs.2.5 crore each Cap. 33,02 DRF 4,13,25 TOTAL-NEW WORKS Cap. 33,02 DRF 4,13,25 TOTAL-Doubling Cap. 435,44,00 DRF 4,13,25 Dep(RVN) 2,98,00 TRAFFIC FACILITIES-YARD REMODELLING & OTHERS A - Works in Progress 48 Sunam - Addl. traffic handling facilities DF(1) 10,00 49 Chheharta - Development of coaching cum maintenance facilities DF(3) 1 50 Giddarbaha - Conversion from rail level goods to high level passenger platform, foot DF(3) 10,00 over bridge, one bay platform shelter etc. 51 Beas - Development into coaching terminal station DF(3) 10,00 52 Panipat-Subzimandi - Automatic signalling Cap. 3,27,47 EBR .. 53 Moradabad Yard - Remodelling & route relay interlocking DRF .. DF(3) 5,00 54 Bhatinda-Firozepur - Tokenless system DF(3) 10 55 Anand Vihar - Development of new terminal Cap. 5,00,00 C.Fund .. 56 Moradabad - Remodeling of yard & route relay interlocking (Phase-II) DF(3) 35,00 57 Northern Railway - Improvement of freight terminal (7 stations) DF(3) 74 58 Amritsar Yard - Additions & alterations DF(3) 10,00 59 Delhi Sarai Rohilla (Coaching Yard) - Stabling & washing lines (2 each) DF(3) 1 60 Mandi Dhanaura, Bijnore & Haldaur - Extension of loops line DF(3) 1 61 Tharwai, Bariya Rampur & Pariawan Kalan - Addl. loops DF(3) 24,00 62 Faridabad - Development of freight terminal DF(3) 30,00 63 Bijwasan - Land acquisition for development of freight & coaching terminal Cap. 45,00 C.Fund .. 64 Lucknow Division - Augmentation of loop line to standard length (12 stations) DRF .. DF(3) 8,00 65 Delhi Division - Emergency cross-over on double line sections (16 stations) DF(3) 75,00 66 Laksar-Haridwar - Development of facilities for running 24-coach trains DRF .. DF(3) 6,00,00 67 Haridwar-Dehradun - Development of facilities for running 18-coach trains DRF 1,16 DF(3) 2,88,00 3.1.4 NORTHERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item Particulars Allocation RE 2014-15 No. TRAFFIC FACILITIES-YARD REMODELLING & OTHERS 68 Lucknow Division - Addl loops (5 stations) DF(3) 33,00 69 Barara - Common loop DF(3) 4,36 70 Moradabad Division - Addl. directional up / down loops (5 stations) Cap. 2,00 71 Shakurbasti - Coaching terminal in metre gauge area Cap. 8,80,00 72 Bijwasan - Coaching / freight handling terminal Cap. 31,00 73 Delhi Subzimandi-Delhi Main - Addl. lines DF(3) 25,00 74 Lucknow-Saharanpur - Addl directional up & down loops (17 Nos) Cap. 3,22,39 75 Rosa-Sitapur - Two crossing stations Cap. 86,18 76 Lucknow-Saharanpur - Intermediate block huts (8 Nos) Cap. 80,00 EBR .. 77 Ghaziabad - Improvement of goods terminal handling facilities DF(3) 1,24,00 78 Chandigarh - Development of freight terminal DF(3) 75,00 79 Anand Vihar - Development of new coaching terminal (Phase-II) DF(3) 15,24,91 80 Tilak Bridge, Subzi Mandi, Sarai Rohilla, Shakurbasti, Ghaziabad, Nizamuddin & DF(3) 2,88,24 Tughlakabad - Development of addl. train handling facilities 81 Noli-Shahdara - Electrification of the section incl. M/s Central Warehousing Cap. 1,50,00 Corporation siding at Noli EBR .. EBR .. 82 Prayag Ghat - Upgradation as coaching terminal DF(3) 4,44,00 83 Kalka - Yard remodeling for addl. broad gauge platform with provision of central DF(3) 1 panel 84 Ballabhgarh Yard - Additions & alterations DF(3) 20,00 85 Delhi Division - Extension of length of loop lines (full length CSL) (17 stations) DF(3) 1 86 Holambi Kalan - Addl acquisition of land & development of world class freight DF(3) 1 terminal 87 Lucknow - 4-line entry & exit with yard remodelling DF(3) 1 88 Varanasi - Yard remodeling DF(3) 1 89 Adarsh Nagar - Addl loop line DF(3) 1 90 Lucknow-Moradabad - Intermediate block section (8 Nos) DF(3) 1,92,24 91 Patel Nagar - Yard modification & upgradation of signalling gears DF(3) 35,00 92 Chandigarh - Addl. traffic facilities incl. stabling lines, end platform line No.8 etc. DF(3) 2,00,00 93 Estimated investment through EBR EBR 1 94 Works costing below Rs.2.5 crore each Cap. 14,74,71 DRF 1,00,00 DF(1) 50,00 DF(2) 8,00 DF(3) 6,04,93 DF(4) 19,00 3.1.5 NORTHERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item Particulars Allocation RE 2014-15 No. TOTAL-WORKS IN PROGRESS Cap. 38,98,75 DRF 1,01,16 DF(1) 60,00 DF(2) 8,00 DF(3) 46,66,61 DF(4) 19,00 EBR 1 B - New Works 95 Faridabad Station Yard - Removal of permanent speed restriction by shifting 280 m DRF 10,00 of point No.101 A&B and 102 A&B 96 Varanasi - Yard remodelling work (Phase-II) DF(3) 10,00 97 Works costing below Rs.2.5 crore each Cap.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    49 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us