0 0 06 Sep 2018 135018963

0 0 06 Sep 2018 135018963

Agenda Number 3.7 F.No.10-35/2018-IA.III Satellite Town Ring Road (STRR) ‐ Phase‐III Development of Satellite Town Ring Road (STRR) Phase-III newly declared Highway NH-948A from Peddamadhagondapalli to Tamil Nadu/Karnataka border (km 140.000 to km 179.969) 39.969 km in District Krishnagiri , Tamil Nadu by M/s National Highways Authority of India. SALIENT FEATURES The Satellite Town Ring Road (STRR) of Bangalore (Newly declared NH 948A) is proposed 6 lane highway having a total length of 179.969 Km in the states Karnataka and Tamil Nadu. The Project will be taken in 3 Phases viz; Phase-I (From Ch. 0+00 to Ch. 82+200) in the state of Karnataka. Phase-II (From Ch. 82+200 to Ch. 140+000), in the state of Karnataka and Tamil Nadu. Phase-III (From Ch. 140+000 to Ch. 179+969) in the state of Tamil Nadu This proposal is for the Proposed Phase-III, which starts from Ch. 140+000 near to SH-17B (Denkanikotattai Road) and terminates at Ch. 179+969 at TN/ Karnataka Border near Deeviripalli village of Hosur Taluk (Krishnagiri District). The Land use pattern within 10 km on either side of project area is predominantly agricultural followed built-up area and barren area. The proposed road location is falling within 15 Km from Bannerghatta National Park’s ESZ and North Cauvery Wildlife Sanctuary’s ESZ however outside from their 10 Km ESZ boundary. Hosur is an automobile industry town located approximately about 7 km away from Karnataka state border. This city generates huge amount of traffic and currently experiencing massive traffic congestions. The STRR Phase-III is designed for inclusion of Ring Road of Hosur town, Automobile Hub of Tamil Nadu and Connecting with the proposed KITCO alignment. There are 16 Major Settlements along the alignment, namely Kappakollu, Payarakanahalli, S. Mudugandanahally, Golisandram, Thorapalli Agraharam, Kothur, Perandapalli, Kadirapalli, Alur, Dasapalle, Payarkuttalai, Nandimangalam, Attur, B. Mudaganahalli, Kadiriganadinna, Sampangere. It is a Greenfield project and the proposed right of way (RoW) is kept as 70 m. The Original STRR of the Govt. of Karnataka was taken and modified by NHAI under Bharatmala Program, which was concurred by State Govt. of Karnataka vide their letter no. PWD 518 CNH 2017 dated 27.10.2017 and Govt. of Tamil Nadu vide their letter no. 14787/HV1/2017-2, dated 24.01.2018 The proposed land acquisition for the proposed alignment is approx. 448.78 ha. The proposed road will have 1 Major Bridge, 6 nos. of Minor Bridges, 1 ROB, 67 nos. of Culverts, 18 nos. of Vehicular Underpasses, 4 nos. of Interchanges. Safety measures shall be provided as per NHAI Safety Manual and IRC: SP 88, IRC: SP: 55 and MoRTH guidelines in this regard. The detail of water body around the proposed project is as follows: River Poniyar crossing at (Design Ch. 158+500) and 7 streams crossing the alignment. As per initial assessment, it is anticipated that on an average about 150 trees are likely to be affected per km. The detailed assessment of actual trees to be affected (tree inventory) on the finalized alignment will be undertaken during detailed EIA Study and preparation of Forest Clearance proposals as per FC (Act) 1980, and the subsequent amendments thereafter. Efforts will be made to minimize the trees loss by restricting tree cutting within formation width. Avenue plantation shall be carried out as per IRC SP: 21:2009 on available ROW apart from statutory requirements. 1 | Page Agenda Number 3.7 F.No.10-35/2018-IA.III Materials requirement are aggregate (13.88 Lakh Cum), Bitumen (0.22 Lakh Tonnes), Earth (63.82 Lakh Cum.), Sand (4.75 Lakh Cum), Steel (0.29 Tonnes), and Cement (1.17 Lakh ton). Fly ash will be used in the project depending upon their availability as per existing fly as notification. The total requirement of water for construction is estimated to be approx.130 KLD for 2 years. The total estimated cost of the project is Approx. INR.1327 Crores. 2 | Page APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE UNDER ENVIRONMENT (PROTECTION) ACT, 1986 August- 2018 Satellite Town Ring Road (STRR) ‐ Phase‐III Form - I and TOR as per EIA Notification 2006 and its amendment thereafter 2 Satellite Town Ring Road (STRR) ‐ Phase‐III Form-I & Approved Terms of Reference (TOR) As per EIA Notification 2006 and its amendment thereafter DPR for Development of Economic Corridors, Inter Corridors, Feeder Routes to improve the efficiency of freight movement in India Under Bharatmala Pariyojana - Lot 3/ Andhra Pradesh, Karnataka, Goa & Kerala /Package 1 (Name of Corridor: Satellite Town Ring Road (STRR)-New NH-948A Phase-III From Design Ch. 140+000 to 179+969) Form - I and TOR as per EIA Notification 2006 and its amendment thereafter 3 Satellite Town Ring Road (STRR) ‐ Phase‐III Form - I and TOR as per EIA Notification 2006 and its amendment thereafter 4 Satellite Town Ring Road (STRR) ‐ Phase‐III APPENDIX I (See paragraph – 6) FORM I I. Basic information S.No. Item Details 1. Name of the Project/s Consultancy Services for preparation of DPR for Development of Economic Corridors, Inner Corridors, Feeder Routes and Coastal Roads to Improve the Efficiency of Fright Movement in India - Lot 3/Andhra Pradesh, Karnataka, Goa & Kerala /Package 1 The Satellite Town Ring Road (STRR) (New National Highway- NH 948A) is having a total length of 179+969 Km. The Project will be taken in 3 Phases: - Phase I: Design Ch. 0+000 to Ch. 82+200 - Phase II: Design Ch. 82+200 to Ch. 140+000 - Phase III: Design Ch. 140+000 to Ch. 179+969 This application is for Phase-III of project, which starts at Design Ch. near to SH-17B (Denkanikotattai Road) and terminates at Ch. 179+969 at TN/ Karnataka Border near Deeviripalli village of Hosur Taluk (Krishnagiri District). 2. S No. in the Schedule 7(f) 3. Proposed Capacity/ Length: 39.969 Km Area/Length/ Tonnage/ to be handled/ Command Area/Lease Area/ Number of Wells to be Drilled. 4. New /Expansion/Modification New Greenfield alignment 5. Existing Capacity /Area, etc. NA 6. Category of Project i.e. ‘A’ or ‘B’ “A” 7. Does it Attract the General No Condition? If yes please specify 8. Does It Attract the Specific No Condition? If yes please specify 9. Location The proposed road starts from Design Ch. 140+00 near to SH-17B (Denkanikotattai Road) and end at Design Ch. 179+769 at TN/KNT Border in Krishnagiri District of Tamil Nadu (Project Map enclosed as Annexure-I). Form - I and TOR as per EIA Notification 2006 and its amendment thereafter 1 | Page Satellite Town Ring Road (STRR) ‐ Phase‐III S.No. Item Details Plot/Survey/Khasra No The proposed project is a linear greenfield alignment. The information regarding the Land shall be obtained during the LA Processes. Village List of villages is enclosed under as Annexure-II Tehsil Total 2 Tehsils i. Hosur Tehsil ii. Denakanikottai Tehsil District 1 District i. Krishnagiri State Tamil Nadu 10. Nearest Railway Station / Airport Major Railway Station: Hosur Railway Station (approx. along with distance in Kms 8Km) Airport: Hosur Aerodrome (approx. 5 Km) 11. Nearest Town, City, District Some of the nearest towns are Headquarters along with Distance i. Hosur (8Km) in Kms 12. Village Panchayats, Zilla Parisad, The proposed road is passing through Hosur Tehsil and Municipal Corporation. Local Denakanikottai Tehsil in Krishnagiri district of Tamil Bodies (Complete Address with Nadu Phone Numbers to be given) 13. Name of the Applicant Dr. B. Mukhopadhay, GM (Environment)-II 14. Registered Address National Highways Authority of India G 5 & 6, Sector-10, Dwarka, New Delhi - 110 075 Phone: 91-011-25074100 & 25074200 Fax : 91-011-25093543 15. Address of Correspondence Name Dr. B. Mukhopadhay Designation General Manager (Environment)-II (Owner/Partner/CEO) Address National Highways Authority of India G 5 & 6, Sector-10, Dwarka, New Delhi - 110 075 Pin Code 110075 Email [email protected] Form - I and TOR as per EIA Notification 2006 and its amendment thereafter 2 | Page Satellite Town Ring Road (STRR) ‐ Phase‐III S.No. Item Details Telephone No. 91-011-25074100 & 25074200 Fax No. Fax : 91-011-25093543 16. Details of Alternative Site Yes, the alignment report enclosed herewith (Annexure- Examined. If any location of these III) sites should be shown on a toposheet. 17. Interlinked Projects No 18. Whether Separate Application of N/A interlinked project has been submitted? 19. If Yes date of submission - 20. If no reason 21. Whether the proposal involves approval /clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act No 1980? (b) Wildlife (Protection) Act 1972? No (c) The CRZ Notification, 1991? No 22. Whether there is any Government No Order/Policy relevant/relating to site? 23. Forest Land Involved (Hectare) 24. Whether there is any litigation No pending against the project and /or land which the project is propose to be set up? (a) Name of the Court? N/A (b) Case No. N/A (c) Order/directions of the N/A Courts, if any and its relevance with the proposed project “I hereby given undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information Form - I and TOR as per EIA Notification 2006 and its amendment thereafter 3 | Page Satellite Town Ring Road (STRR) ‐ Phase‐III submitted is found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.” Date: 21.08.2018 Place: New Delhi Dr.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    34 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us