Energy Storage Project IHG - Stem

Energy Storage Project IHG - Stem

Energy Storage Project IHG - Stem Harry Hobbs Area Director of Engineering InterContinental Hotels of San Francisco San Francisco Hotels InterContinental SF and Mark Hopkins Hotel • Intercontinental Hotels Group – North America: 2,800 sites – Global: 4,400 sites • Responsible for SF hotels engineering San Francisco Hotels InterContinental SF and Mark Hopkins Hotel • IC San Francisco: – 5-year old building – 32 stories – 550 guest room – LEED® EBOM Gold Certified • Largest of existing CA buildings • 3rd largest in U.S. San Francisco Hotels InterContinental SF and Mark Hopkins Hotel • IC Mark Hopkins: – 85-year old building – 380 rooms – EnergyStar rating of 69 Beginning of project IHG and Stem, Inc. • Met in Spring 2012 via SF Community Power – DR aggregator – Mark Hopkins hotel is member of DR pool • Signed up SF hotels for SGIP – “Hybrid energy” concept in line with hotel philosophy • Stem showcase at two hotels – Applicable to both new and old buildings Launch Event IHG and Stem, Inc. • Conducted launch event at MH in Nov 2012 • In conjunction with VERGE / GreenBuild events Launch Event IHG and Stem, Inc. 100+ attendees Strong press coverage Stem System IHG and Stem, Inc. Business Case IHG and Stem, Inc. • 2 hotels • 54 kW system each • Expected savings: $11k per year per hotel Business Case (cont’d) IHG and Stem, Inc. Capital Savings • $75K per installation (2 at IC Mark Hopkins). • Confirmed 16 hotels • Capital savings (SGIP rebate) of $1,200,000. Operational Savings • 50/50 split of the ongoing electric utility monthly savings • Received initial estimate of $130K to $150K per year • for all properties where rebates were applied. Process (cont’d) IHG and Stem, Inc. • Legal reviews – Review by corporate legal department in Atlanta – Familiarity with energy purchasing • PPAs, energy buying contracts, risk management, etc. • Installations completed in Q4 2012 Bumps along the way … IHG and Stem, Inc. • Expected: interconnection not needed – Currently designed to cover co-generation assets – No form available to cover small systems – Stem system doesn’t backfeed; sits on customer side of meter • Actual: interconnection needed – Permission to operate rejected – PG&E very cooperative – Expedited interconnection in time for launch event Bumps along the way … IHG and Stem, Inc. • Initial test system – On one branch rather than main • Delays – Initially planned for installation in April – Likely Summer • Software delays – Battery status visibility missing Relationship evolution IHG and Stem, Inc. • Began conversation with InnSupply – IHG corporate procurement group • 15 properties signed • Worked through holiday season to meet SGIP deadline Relationship evolution IHG and Stem, Inc. • 15 properties signed: Brand Hotels Approved in 2012 InterContinental 2 Next Steps: Crowne Plaza 2 Investigate opportunity Holiday Inn 2 to expand to 200 Indigo 1 InnSupply CA properties Staybridge Suites 5 Candlewood Suites 4 • 15 – 16 hotels; 54 kW systems: – Expect $200 – 300k total savings per year Next steps IHG and Stem, Inc. • Installation of third party meter • Independent verification of results Summary / Learnings Summary • Key component of energy strategy • No operational changes: – No change to hotel operations – No operator or training required • Machine learning: – Additional improvements over time Learnings • New technology means that existing processes may not fit • Education within IHG paved the way for acceptance • Technology will evolve and be fine-tuned over time • Strong communication between vendor/customer is critical .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    17 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us