Boone Dam Seepage Remediation

Boone Dam Seepage Remediation

Boone Dam Seepage Remediation FINAL ENVIRONMENTAL ASSESSMENT JANUARY 2016 TENNESSEE VALLEY AUTHORITY This page intentionally left blank. Document Type: EA-Administrative Record Index Field: Final Environmental Assessment Project Name: Boone Dam Seepage Remediation Project Number: 2015- 15 Boone Dam Seepage Remediation Final Environmental Assessment January 2016 For Information Contact: Matthew Higdon, NEPA Specialist Tennessee Valley Authority 400 West Summit Hill Drive, WT 11D Knoxville, Tennessee 37902-1499 Phone: 865-632-8051 Email: [email protected] Boone Dam Seepage Remediation Table Of Contents TABLE OF CONTENTS 1.0 INTRODUCTION ............................................................................................... 1-1 1.1 PROJECT LOCATION AND DESCRIPTION ..................................................... 1-1 1.2 BACKGROUND .................................................................................................. 1-7 1.2.1 Prior Related Activities and NEPA Compliance ...................................... 1-7 1.3 PURPOSE AND NEED FOR ACTION ............................................................... 1-9 1.4 SCOPE OF THIS ENVIRONMENTAL ASSESSMENT ...................................... 1-9 1.5 SIMILAR AND CONNECTED ACTIONS .......................................................... 1-10 1.5.1 Related Actions to Address Near-Term Needs ..................................... 1-10 1.5.2 Related Actions to Address Long-Term Needs .................................... 1-11 1.6 RELATED ENVIRONMENTAL REVIEWS ....................................................... 1-12 1.7 PUBLIC INVOLVEMENT .................................................................................. 1-13 2.0 DESCRIPTION OF THE PROPOSED ACTION AND ALTERNATIVES ........... 2-1 2.1 NO ACTION – NO BOONE DAM REMEDIATION AND CONTINUE INTERIM OPERATIONS .................................................................................................... 2-1 2.2 PROPOSED ACTION – REMEDIATE BOONE DAM AND RETURN TO NORMAL OPERATIONS.................................................................................... 2-2 2.2.1 Construction............................................................................................ 2-2 2.2.2 Construction Support and Management of Excess Rock and Soil ......... 2-5 2.2.3 Reservoir Drawdown and Interim Operations ......................................... 2-6 2.2.4 Summary of TVA Commitments and Proposed Mitigation Measures ..... 2-6 2.3 OTHER ALTERNATIVES EVALUATED, BUT DISMISSED FROM FURTHER CONSIDERATION ............................................................................................. 2-9 2.4 ENVIRONMENTAL RESOURCES CARRIED FORWARD .............................. 2-16 2.5 COMPARISON OF ALTERNATIVES ............................................................... 2-18 2.6 THE PREFERRED ALTERNATIVE.................................................................. 2-18 3.0 AFFECTED ENVIRONMENT AND ENVIRONMENTAL CONSEQUENCES .... 3-1 3.1 BACKGROUND FOR ENVIRONMENTAL ANALYSIS ....................................... 3-1 3.1.1 Boone Project Operations....................................................................... 3-1 3.1.1.1 Normal Operations (Prior to October 2014) ........................................ 3-1 3.1.1.2 Normal Flood Control Operations ....................................................... 3-4 3.1.1.3 Interim Operations during Dam Remediation ...................................... 3-5 3.1.1.4 Interim Flood Control Operations ........................................................ 3-6 3.1.2 General Characterization of Drawdown .................................................. 3-6 3.2 GEOLOGIC RESOURCES .............................................................................. 3-12 3.2.1 Affected Environment ........................................................................... 3-12 3.2.2 Environmental Consequences .............................................................. 3-13 3.2.2.1 No Action Alternative ......................................................................... 3-13 3.2.2.2 Proposed Action ................................................................................ 3-14 3.3 WATER RESOURCES ..................................................................................... 3-15 3.3.1 Affected Environment ........................................................................... 3-15 3.3.2 Environmental Consequences .............................................................. 3-24 3.3.2.1 No Action Alternative ......................................................................... 3-24 3.3.2.2 Proposed Action ................................................................................ 3-26 3.4 FLOODPLAINS AND FLOOD RISK ................................................................. 3-29 3.4.1 Affected Environment ........................................................................... 3-29 3.4.2 Environmental Consequences .............................................................. 3-31 3.4.2.1 No Action Alternative ......................................................................... 3-31 3.4.2.2 Proposed Action ................................................................................ 3-32 iv Tennessee Valley Authority Boone Dam Seepage Remediation Table Of Contents 3.5 WETLANDS ..................................................................................................... 3-34 3.5.1 Affected Environment ........................................................................... 3-34 3.5.2 Environmental Consequences .............................................................. 3-36 3.5.2.1 No Action Alternative ......................................................................... 3-36 3.5.2.2 Proposed Action ................................................................................ 3-39 3.6 TERRESTRIAL ECOLOGY .............................................................................. 3-40 3.6.1 Affected Environment ........................................................................... 3-40 3.6.2 Environmental Consequences .............................................................. 3-45 3.6.2.1 No Action Alternative ......................................................................... 3-45 3.6.2.2 Proposed Action ................................................................................ 3-46 3.7 AQUATIC ECOLOGY ....................................................................................... 3-48 3.7.1 Affected Environment ........................................................................... 3-48 3.7.2 Environmental Consequences .............................................................. 3-53 3.7.2.1 No Action Alternative ......................................................................... 3-53 3.7.2.2 Proposed Action ................................................................................ 3-55 3.8 THREATENED AND ENDANGERED SPECIES .............................................. 3-57 3.8.1 Affected Environment ........................................................................... 3-57 3.8.2 Environmental Consequences .............................................................. 3-63 3.8.2.1 No Action Alternative ......................................................................... 3-63 3.8.2.2 Proposed Action ................................................................................ 3-64 3.9 HISTORIC AND CULTURAL RESOURCES .................................................... 3-65 3.9.1 Affected Environment ........................................................................... 3-65 3.9.2 Environmental Consequences .............................................................. 3-67 3.9.2.1 No Action Alternative ......................................................................... 3-67 3.9.2.2 Proposed Action ................................................................................ 3-68 3.10 AIR QUALITY ................................................................................................... 3-69 3.10.1 Affected Environment ........................................................................... 3-69 3.10.2 Environmental Consequences .............................................................. 3-71 3.10.2.1 No Action Alternative ......................................................................... 3-71 3.10.2.2 Proposed Action ................................................................................ 3-71 3.11 SOCIOECONOMICS ........................................................................................ 3-72 3.11.1 Affected Environment ........................................................................... 3-72 3.11.2 Environmental Consequences .............................................................. 3-83 3.11.2.1 No Action Alternative ......................................................................... 3-87 3.11.2.2 Proposed Action .............................................................................. 3-100 3.12 RECREATION ................................................................................................ 3-103 3.12.1 Affected Environment ......................................................................... 3-104 3.12.2 Environmental Consequences ............................................................ 3-108 3.12.2.1 No Action Alternative ....................................................................... 3-108 3.12.3 Proposed Action

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    239 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us