Joint Rail and Road Project Ringerike Line and E16 Highway Sandvika, 03.11.2020

Joint Rail and Road Project Ringerike Line and E16 Highway Sandvika, 03.11.2020

Ringeriksbanen og E16 Joint Rail and Road Project Ringerike Line and E16 Highway Sandvika, 03.11.2020 1 06.11.2020 Project status • Zoning plan State approved 27 March 2020 • Final Investment Decision expected in May 2021 • All dates in this presentation are based on this decision-date • Start of prequalification for handling and processing of tunnel masses at Avtjerna during 2nd half 2021 • Start prequalification for the first tunnelling contract during 2nd half 2021 • Start preparatory works within end 2021 2 06.11.2020 Ringeriksbanen og E16 Preliminary schedule from contract award to completion S1 IB/ S1 21 NTP 22 Masseoverskudd TK-01 Tunnel + påkobling Jong Massebehov TK-02 Tunnel TK-03 Tunnel, fyllinger, stasjon, jernbanebru, vegbru TK-041 Bergtunnel TK-042 Berg- og løsmassetunnel, dagsone – TK-05 Bruer og fyllinger TK-06 (inkl JBT) Dagsone veg og bane, stasjon, hensetting, lang kulvert, JBT TK-07 (JBT) Ballast og ballastfritt spor TK-08 Massehåndtering 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Hitting “the political board” 4 06.11.2020 Ringeriksbanen og E16 Ringerike Line and E16 Highway 5 06.11.2020 Ringeriksbanen og E16 Project summary – railway and highway • 40 km new double track railway from Sandvika to Hønefoss designed for a max speed of 250 km/h • 15 km four lane highway from Høgkastet to Hønefoss/Ve, designed for max speed 110 km/h • Complete rebuild of existing railway station at Hønefoss • Estimated project value 34 billion NOK 6 06.11.2020 Ringeriksbanen og E16 Project summary – tunnels and bridges • 23 km double track railway tunnel with parallel escape and service tunnel from Sandvika to Sundvollen • 3 km double track railway tunnel at Vik/Bymoen • 2 x 3 km 2-lane highway tunnels at Vik/Bymoen • 770 m double track railway bridge across Kroksund • 640 m 4-lane highway bridge across Kroksund • Bridge crossings of the river and wetlands at Mælingen by two railway bridges (300 m + 900 m) plus three highway bridges (1 x 300 m 4-lane + 2 x 900 m 2-lane) in parallel with a 600 m embankment in-between 7 06.11.2020 Ringeriksbanen og E16 Requirements for model-based engineering • The project will be fully model based and according to the Road and Rail Authorities' BIM-strategies • Standardised requirements for model based engineering and building are now implemented across the contracts focusing on: • Standardised formats per discipline • Standardised information per discipline • Model based reviews and interface checks • Webpage for project requirements: www.banenor.no/kim 8 06.11.2020 Ringeriksbanen og E16 Distribution and reuse of excavated materials • 9,8 million m3 of excavated materials will be distributed and reused in the project • 70% embankments, quality masses and concrete aggregates • 30% landfill and preparation of land for future construction of homes 9 06.11.2020 Ringeriksbanen og E16 Contract Structure 10 06.11.2020 Ringeriksbanen og E16 Ringeriksbanen og E16 EPC Jong / EPC Sollihøgda / EPC Sundvollen 2 x 23 km tunnel from Jong to Sundvollen 11 06.11.2020 23km tunnels from Jong to Sundvollen • Two tubes; one double track tunnel with one parallel escape and service tunnel • Excavation method; drill and blast 12 06.11.2020 Ringeriksbanen og E16 3 EPC tunnel contracts from Jong to Sundvollen TK-01 JONG TK-02 SOLLIHØGDA TK-03 SUNDVOLLEN 13 06.11.2020 Ringeriksbanen og E16 Ringeriksbanen og E16 EPC Jong 14 06.11.2020 Jong – Civil works • Two 2,5 km single track tunnels • 2,5 km parallel escape and service tunnel • Connection to existing tunnel at Jong • Rig areas at tunnel portals of access tunnels at Jong and Reverud • Excavated volume: 690.000 solid m3 • Expected duration (award to completion): 4 years 15 06.11.2020 Ringeriksbanen og E16 Ringeriksbanen og E16 EPC Sollihøgda 16 06.11.2020 Sollihøgda 17 06.11.2020 Ringeriksbanen og E16 Sollihøgda – Civil works • 14,5 km double track tunnel • 14,5 km parallel escape and service tunnel • Firefighting point at tunnel center point • Rig areas at tunnel portals of access tunnels at Avtjerna and Nordby • Excavated volume: 2.700.000 solid m3 • Expected duration (award to completion): 6 years 18 06.11.2020 Ringeriksbanen og E16 Sollihøgda – Avtjerna rig and production area for quality masses 19 06.11.2020 Ringeriksbanen og E16 Ringeriksbanen og E16 EPC Sundvollen 20 06.11.2020 Sundvollen 21 06.11.2020 Ringeriksbanen og E16 Sundvollen – Civil works railway line • Railway station with platforms, bus stop, car parking, stairs and elevators • Railway bridge: 770 m total length, 2 tracks • Fillings in the lake: 340.000 solid m3 / 610.000 m3 • 6 km double track tunnel • 6 km parallel escape and service tunnel • Excavated volume: 990.000 solid m3 22 06.11.2020 Ringeriksbanen og E16 Sundvollen – Civil works highway • Highway bridge: 640 m total length, 4 lanes • Intersection at Elstangen with bridges and “roundabouts” for local roads and pedestrians • Total cuts = fillings: 370.000 solid m3 Railway and highway works: • Expected duration (award to completion): 5 ½ years 23 06.11.2020 Ringeriksbanen og E16 Ringeriksbanen og E16 EPC Vik and EPC Bymoen 24 06.11.2020 Vik and Bymoen 25 06.11.2020 Ringeriksbanen og E16 Vik and Bymoen – Railway and Highway Tunnels EPC Vik EPC Bymoen 26 06.11.2020 Ringeriksbanen og E16 Vik – Railway and Highway Tunnels • Conventional drill and blast tunneling • 1.300 m two-track railway tunnel from Kroksund to Smiujordet • 2 x 1.600 m two-lane highway tunnels from Rudsøgarden below the soil section to after Smiujordet • Access and escape tunnels • Excavated volume: 430.000 solid m3 • Rock from tunneling to be reused in the project • Expected duration (award to completion): 3 years 27 06.11.2020 Ringeriksbanen og E16 Bymoen – Railway and Highway Tunnels and Open Landscape • 1.900 m two-track railway tunnel from and including the cut soil section at Smiujordet to Kjellerberget • 2 x 1.500 m two-lane highway tunnels from after Smiujordet to Kjellerberget • Conventional drill and blast tunneling + cut and cover (rail: 350 m + 260 m cut & cover, road: 2 x 260 m cut & cover) • Access and escape tunnel • Excavated volume: 390.000 solid m3 • Rock from tunneling to be reused in the project • 3 km two-track railway and four-lane highway in parallel across the open landscape from Kjellerberget to Helgelandsmoen • 9 small bridges, 1.500 m of embankments from Mosmoen to Helgelandsmoen and 2,5 km of local roads • Expected duration (award to completion): 3 years 28 06.11.2020 Ringeriksbanen og E16 Ringeriksbanen og E16 EPC Mælingen 29 06.11.2020 Mælingen 30 06.11.2020 Ringeriksbanen og E16 Mælingen • Crossing of unique wetlands and high value natural resorts • 1 800 m combined bridge and embankment crossing • Challenging soil conditions, typically 70 - 130 m to solid rock • Looking for best combination of concept, technical solution and cost • High focus on foundation methods • Expected duration (award to completion): 6 ½ years 31 06.11.2020 Ringeriksbanen og E16 River and wetlands crossings 32 06.11.2020 Ringeriksbanen og E16 River crossing • 140 m free span. No columns allowed in the river • Minimum 7.5 m free height under the bridges • Soil conditions at the riverbank: 80 m to solid rock Examples Storelva Crossing, illustration only 33 06.11.2020 Ringeriksbanen og E16 Full scale testing at Mælingen • Available results from testing: • Bearing capacity of friction piles and direct foundations • Level of ground deformations • Time required for pile installation • Schedule effects • Optimisation of foundation works • Input to design • Risk reduction 34 06.11.2020 Ringeriksbanen og E16 Ringeriksbanen og E16 ECI/EPC Hønefoss 35 06.11.2020 Hønefoss 36 06.11.2020 Ringeriksbanen og E16 Hønefoss railway station • Complete rebuild of Hønefoss railway station • 400 m concrete double track railway tunnel through Storskjæringa • Railway systems (excl. signal) at the station area including Storskjæringa 37 06.11.2020 Ringeriksbanen og E16 Hønefoss train parking • Train parking for 5 x 220 m trains at Tolpinrud 38 06.11.2020 Ringeriksbanen og E16 Hønefoss – Civil works railway and highway • Substructure for two track railway from Prestmoen to Hønefoss station and Ve • New E16 Highway from Prestmoen to Ve including two intersections (about 5 km) 39 06.11.2020 Ringeriksbanen og E16 Hønefoss – Civil works railway and highway • More than 25 constructions incl bridges and concrete tunnels of variable sizes • 2 million m³ of rock from the tunneling plus 2 million m³ of soil and loose materials to be moved and reused in the project • Logistically challenging with continuous rail and road traffic on existing lines and roads through the entire construction period • Large areas covered by marine deposits including quick clay of various depths • Early Contractor Involvement (ECI to EPC or alliance) • Expected duration (award to completion): 5 - 6 years 40 06.11.2020 Ringeriksbanen og E16 Ringeriksbanen og E16 EPC Railway systems 41 06.11.2020 Railway systems Jong – Ve (Hønefoss) • 40 km double track from Jong to Styggdalen • 23 km tunnel (2x3 km single track and 20 km double track) with parallel service tunnel • Station at Sundvollen • 3 km tunnel double track • 14 km double track through open landscape • Civil works • Expected duration from award to completion: 4 years 42 06.11.2020 Ringeriksbanen og E16 Civil works • Water and frost protection in the service tunnel where needed • Concrete works in cross passages • Substructure in service tunnel • Parts of substructure in railway tunnels • Cable conduits 43 06.11.2020 Ringeriksbanen og E16 Permanent way • Connection to existing line (Askerbanen), ballasted track • 26,5 km slab track in tunnels and on the bridge at Sundvollen • 13,5 km ballasted track from Bymoen to Ve (Hønefoss) • Approx.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    52 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us