Cordillera Energy Development: Car As A

Cordillera Energy Development: Car As A

LEGEND WATERSHED BOUNDARY N RIVERS CORDILLERACORDILLERA HYDRO ELECTRIC PLANT (EXISTING) HYDRO PROVINCE OF ELECTRIC PLANT ILOCOS NORTE (ON-GOING) ABULOG-APAYAO RIVER ENERGY MINI/SMALL-HYDRO PROVINCE OF ENERGY ELECTRIC PLANT APAYAO (PROPOSED) SALTAN B 24 M.W. PASIL B 20 M.W. PASIL C 22 M.W. DEVELOPMENT: PASIL D 17 M.W. DEVELOPMENT: CHICO RIVER TANUDAN D 27 M.W. PROVINCE OF ABRA CARCAR ASAS AA PROVINCE OF KALINGA TINGLAYAN B 21 M.W AMBURAYAN PROVINCE OF RIVER ISABELA MAJORMAJOR SIFFU-MALIG RIVER BAKUN AB 45 M.W MOUNTAIN PROVINCE NALATANG A BAKUN 29.8 M.W. 70 M.W. HYDROPOWERHYDROPOWER PROVINCE OF ILOCOS SUR AMBURAYAN C MAGAT RIVER 29.6 M.W. PROVINCE OF IFUGAO NAGUILIAN NALATANG B 45.4 M.W. RIVER PROVINCE OF (360 M.W.) LA UNION MAGAT PRODUCERPRODUCER AMBURAYAN A PROVINCE OF NUEVA VIZCAYA 33.8 M.W AGNO RIVER Dir. Juan B. Ngalob AMBUKLAO( 75 M.W.) PROVINCE OF BENGUET ARINGAY 10 50 10 20 30kms RIVER BINGA(100 M.W.) GRAPHICAL SCALE NEDA-CAR CORDILLERA ADMINISTRATIVE REGION SAN ROQUE(345 M.W.) POWER GENERATING BUED RIVER FACILITIES COMPOSED BY:NEDA-CAR/jvcjr REF: PCGS; NWRB; DENR DATE: 30 JANUARY 2002 FN: ENERGY PRESENTATIONPRESENTATION OUTLINEOUTLINE Î Concept of the Key Focus Area: A CAR RDP Component Î Regional Power Situation Î Development Challenges & Opportunities Î Development Prospects Î Regional Specific Concerns/ Issues Concept of the Key Focus Area: A CAR RDP Component Cordillera is envisioned to be a major hydropower producer in Northern Luzon. Car’s hydropower potential is estimated at 3,580 mw or 27% of the country’s potential. Hydropower development in CAR shall focus on mini and small run-of- river type hydro projects for being socially acceptable and environment- friendly. CAR’SCAR’S HydropowerHydropower PotentialPotential ProvinceProvince EstimatedEstimated CapacityCapacity (MW)(MW) AbraAbra 671671 ApayaoApayao 1,3281,328 BenguetBenguet 535535 IfugaoIfugao 154154 KalingaKalinga 602602 Mt.Mt. ProvinceProvince 297297 CARCAR TotalTotal 3,5873,587 Regional Power Situation At present CAR’s hydropower generation is merely 208 MW (100 MW Binga Dam, 70 MW Bakun HEP, & 14 mini hydros; excluding inoperational 75 MW Ambuklao Dam). As watershed cradle of the North, CAR provides water to run the 360 MW Magat Dam in Isabela & the 345 MW San Roque Dam in Pangasinan. Regional Power Situation The proposed Palsiguan Dam with irrigation component in Ilocos Norte & Ilocos Sur will divert water from Tineg, Abra CAR’s annual peak demand is 107.5 MW (only half of its power generation). Province Demand (MW) Abra 7.1 Benguet/Baguio 92.3 Ifugao 1.9 Kalinga/ Apayao 3.1 Mt. Province 2.9 Regional Power Situation In terms of rural electrification, all CAR’s poblaciones were energized since 1997. At the barangay level, 96% or 1,127 out of 1,172 barangays covered. Among the provinces, Abra & Mt. Province are 100% covered while Benguet, Ifugao & Kalinga are above 90%, Apayao is last with 76 %. At the household level, 90% now enjoys the benefits of electricity. Off-grid barangays are served by micro hydro projects, solar home system or diesel generators. RuralRural ElectrificationElectrification StatusStatus as of June 2008 BarangaysBarangays %% ProvinceProvince TotalTotal ServedServed UnservedUnserved CoverageCoverage (#(# Mun.)Mun.) AbraAbra (27)(27) 303303 303303 00 100100 ApayaoApayao (7)(7) 131131 100100 3131 76.3376.33 BenguetBenguet(13)(13) 140140 136136 44 97.1497.14 IfugaoIfugao (11)(11) 175175 173173 22 98.8598.85 KalingaKalinga (8)(8) 150150 142142 88 94.6794.67 Mt.Mt. Prov.Prov.(10)(10) 144144 144144 00 100100 BaguioBaguio (1)(1) 129129 129129 00 100100 CARCAR (77)(77) 1,1721,172 1,1271,127 4545 96.1696.16 Development Challenges & Opportunities Cordillera remains to be potentially rich in power. DOE predicts that Luzon’s power requirement would increase from 8,302 MW in Year 2006 to a critical level of 9,721 MW by Year 2010 which requires additional power sources. This could be a key opportunity for CAR to develop its hydropower potentials. When developed would translate into savings from imported fuel. Development Challenges & Opportunities Serves as impetus for local development through revenue shares. Previously, CAR’s hydropower development is constrained by issues on social acceptability among local residents due to past experiences. Development Challenges & Opportunities Recently, through the DOE-assisted Cordillera Energy Producer Master Plan (CEPMP), which advocates the development of mini to small hydro projects through affected communities involvement, people through series of consultations were enlightened and became receptive. Development of these projects is proposed to be in collaboration with the affected LGUs & villages. Development Prospects CEPMP primarily proposes the establishment of Local Power Corporations (LPC) with the LGUs, electric cooperatives, private sector & host communities as incorporators. This arrangement will optimize benefits for the LGUs & host communities more than those mandated by relevant laws. The LPC partners with an experienced power developer. Region Specific-Issues/Concerns Legal Environment Concerns: The DOE Energy Regulation (ER) No. 1- 94 financial benefit of one centavo per kWh generated should be updated into its current and real value considering inflation. Adjust to 0.5 % of the gross sales to reckon with the year 1994 percentage rate. Redefine “host community” to cover villages along the upstream or within the watershed area that financial benefits be shared as incentive for watershed sustainability. Region Specific-Issues/Concerns Legal Environment: Direct remittance of ER No. 1-94 financial benefits to the host LGUs similar to national wealth tax. Push for the Renewable Energy Bill to provide incentive to the NRE developers Reduce the cap on systems losses & should not be subjected to VAT Review contracts of distribution utilities under “take or pay” terms Region Specific-Issues/Concerns Infrastructure Concerns: CAR needs a transmission trunkline and fast track transmission expansion program and substation upgrading Allow franchises in transmission but excluding generation and distribution sectors Organizational Concerns Conversion of electric cooperatives to stock cooperatives. Region Specific-Issues/Concerns Environment/ IEC Concerns: Education campaign on clean air, climate change, NRE, etc. (incorporate in curriculum) Bring consultations and energy literary to the barangays with assistance of the academe, private sector & line agencies. AGYAMANAGYAMAN KAMIKAMI APOAPO …….

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    17 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us