Rehabilitation of Ampera Bridge on Musi River Project Indonesia

Rehabilitation of Ampera Bridge on Musi River Project Indonesia

41 Indonesia Rehabilitation of Ampera Bridge on Musi River Project Rehabilitated Ampera Bridge Outline of Loan Agreement Loan Amount / 1,804 million yen / 1,695 million yen Disbursed Amount Loan Agreement July 1988 Terms &Conditions Interest rate 3.0% p.a. Repayment period 30 years (Grace period 10 years) Final Disbursement September 1993 Date Project Outline The project covered the rehabilitation of the Ampera Bridge, which spans the Musi River running through Palembang, a core city in South Sumatra Province, in order to address deterioration of the structure and to ensure smooth flow of traffic around the city. Results and Evaluation Palembang City is divided into two areas on the north and south sides of the Musi River, and the objective of city development plans has been to redevelop the northern side as a center for administration and commercial industry and to promote the development of new residential and commercial districts on the south side. Ampera Bridge was the only road bridge connecting the north and the south sides of the river, however, the 1993 completion of rehabilitation work was followed by con- struction of a new bridge (the Second Musi Bridge) 5km up river in 1994, in order to bypass the city center. It is anticipated that the synergistic effects of the two bridges will smooth the flow of traffic through the city, and traffic volume on the Ampera Bridge has grown substantially from approximately 44,000 vehicles/day at project appraisal (1986) to approximately 78,000 vehicles/day in 2000 (approx. 1.8 times), whilst that on the Second Musi Bridge has increased to around 7,000 vehicles/day. In terms of its convenience, the Ampera Bridge continues to be the more important of the two bridges for the residents of Palembang. Regarding the operation and maintenance of the bridge, an accident occurred after project completion, in which a ship traversing the Musi River crashed directly into one of the piers, and there is need to promote the safe operation of ships in cooperation with the relevant ministries..

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us