SHIFT 2020 Statewide Projects List

SHIFT 2020 Statewide Projects List

Projects Under Consideration for Statewide Funding SHIFT Statewide Score County District Item # Primary Route Project Type Remaining Project Cost: Description Max 100 Fayette 7 7-252 / 7-252.02 KY 922 MAJOR WIDENING $27,640,000 IMPROVE NEWTOWN PIKE FROM KY-4 TO I-75. 1.65 - 3.4 73.2 Kenton 6 6-17.05 I 75 AM-BRIDGE $1,200,000,000 BRENT SPENCE BRIDGE PROJECT 187.3 - 191.777 64.8 Laurel 11 11-11 I 75 MAJOR WIDENING $85,100,000 IMPROVE I-75 FROM KY 80 AT LONDON TO SOUTH OF THE KY- 909 UNDERPASS. 41 - 48 64.1 Woodford 7 IP20080478 I 64 MAJOR WIDENING $128,251,000 IMPROVE CAPACITY ON I-64 FROM US 60 TO I-64/I-75 NORTHERN SPLIT IN FAYETTE COUNTY. 57.86 - 74.26 60.3 Jefferson 5 5-557 I 71 MAJOR WIDENING $211,280,000 IMPROVE SAFETY AND REDUCE CONGESTION ON I-71 FROM ZORN AVENUE TO I-265. 1.724 - 9 59.9 Jefferson 5 5-48.10 I 71 RECONSTRUCTION $23,750,000 NB AND SB AUXILIARY LANES ON I-71 NEAR KENNEDY INTERCHANGE, INCLUDING OPERATIONAL IMPROVEMENTS TO 59.5 0 - 2.5 THE ZORN INTERCHANGE. Monday, June 24, 2019 Revision 1 7/19/19 Page 1 of 8 SHIFT Statewide Score County District Item # Primary Route Project Type Remaining Project Cost: Description Max 100 Campbell 6 6-81 I 471 MAJOR WIDENING $1,600,000,000 IMPROVE CONGESTION ALONG THE I-471 CORRIDOR FROM US- 27 TO OHIO STATE LINE. 0 - 5 58.5 Pulaski 8 8-8901/ HR 9006 MAJOR WIDENING $500,000,000 UPGRADE ROUTE FROM SOMERSET TO LONDON TO 8-8902/ INTERSTATE STANDARDS 8-8903 58.3 11-8907 Boone 6 6-79 I 75 CONGESTION MITIGTN $300,000,000 IMPROVE SAFETY, MOBILITY, OPERATIONS, AND GEOMETRICS AT THE JUNCTION OF I-75 AND I-275 AND THE SYSTEM-TO-SYSTEM 57.9 182 - 183.312 RAMPS. Jefferson 5 5-804 I 264 RECONSTRUCTION $59,630,000 IMPROVE I-264 (WATTERSON EXPRESSWAY) FROM WESTPORT ROAD (KY-1447) TO I-71, INCLUDING THE US-42 INTERCHANGE. 20.9 - 22.6 57.6 Jefferson 5 5-553 I 64 CONGESTION MITIGTN $36,550,000 IMPROVEMENTS WITHIN THE I-64 CORRIDOR FROM THE KENNEDY INTERCHANGE TO I-264 (WATTERSON EXPRESSWAY) 57.5 6.581 - 12.275 ADDRESSING SAFETY AND CONGESTION ISSUES. Jefferson 5 5-554 I 265 MAJOR WIDENING $88,360,000 IMPROVE SAFETY AND REDUCE CONGESTION ON I-265 FROM I- 65 TO US-31E. 10.25 - 17.3 56.9 Oldham 5 5-483.10 I 71 MAJOR WIDENING $39,600,000 IMPROVE I-71 FROM KY-329 (MP 14.1) TO KY-393 (MP 18.0). 14.1 - 18 55.0 Monday, June 24, 2019 Page 2 of 8 SHIFT Statewide Score County District Item # Primary Route Project Type Remaining Project Cost: Description Max 100 Christian 2 IP20070011 I 24 MAJOR WIDENING $119,276,000 IMPROVE SAFETY AND REDUCE CONGESTION ON I-24 FROM US 41A TO THE KENTUCKY/TENNESSEE STATE LINE. 85.563 - 93.373 53.8 Jefferson 5 5-559 I 65 RECONSTRUCTION $500,000,000 IMPROVE SAFETY AND REDUCE CONGESTION AT THE I-65/I-264 (WATTERSON EXPRESSWAY) INTERCHANGE. 129.289 - 131.587 53.2 Bullitt 5 5-550 I 65 MAJOR WIDENING $298,230,000 IMPROVE I-65 FROM KY-61 (PRESTON HIGHWAY) IN LEBANON JUNCTION TO I-265 (GENE SNYDER FREEWAY). 104.788 - 123.18 52.7 Fayette 7 7-8909 I 75 MAJOR WIDENING $85,320,000 IMPROVE SAFETY AND REDUCE CONGESTION ON I-64/I-75 FROM MAN O' WAR BOULEVARD TO THE NORTHERN SPLIT. 108.616 - 117.665 52.1 Franklin 5 5-551 I 64 MAJOR WIDENING $144,231,000 IMPROVE I-64 FROM US-127 TO US-60 SOUTH OF FRANKFORT. 53.11 - 57.86 51.9 Henderson 2 2-1088 New Route NEW ROUTE $830,000,000 I-69 BRIDGE PROJECT IN HENDERSON. 51.6 Jefferson 5 5-558 I 265 MAJOR WIDENING $85,730,000 IMPROVE SAFETY AND REDUCE CONGESTION ON I-265 FROM US- 31E (BARDSTOWN RD) TO KY-155 (TAYLORSVILLE RD). 17.3 - 23.1 50.7 Jefferson 5 IP20080190 I 71 RECONSTRUCTION $57,734,000 IMPROVE SAFETY AND REDUCE CONGESTION OF THE I-265 NORTHBOUND TO I-71 SOUTHBOUND MOVEMENT AT THE I-71/I- 48.6 7.5 - 9.08 265 (GENE SNYDER FREEWAY) INTERCHANGE. Monday, June 24, 2019 Page 3 of 8 SHIFT Statewide Score County District Item # Primary Route Project Type Remaining Project Cost: Description Max 100 Christian 2 IP20180067 EB 9004 RECONSTRUCTION $37,901,000 IMPROVE PENNYRILE PARKWAY TO MEET INTERSTATE STANDARDS FROM I-24 IN CHRISTIAN COUNTY TO THE I- 48.0 0 - 28.095 69/WESTERN KENTUCKY PARKWAY INTERCHANGE IN HOPKINS COUNTY. Henry 5 IP20110217 I 71 MAJOR WIDENING $67,586,000 IMPROVE SAFETY AND REDUCE CONGESTION ON I-71 FROM KY 153 TO US 421. 28 - 34 47.2 Oldham 5 5-483.20 I 71 MAJOR WIDENING $48,800,000 WIDEN I-71 FROM FOUR TO SIX LANES FROM KY-393 TO KY-53 18 - 22.4 46.7 Henry 5 5-552 I 71 MAJOR WIDENING $64,200,000 IMPROVE SAFETY AND REDUCE CONGESTION ON I-71 FROM KY- 53 TO KY-153. 22.4 - 28 46.6 Kenton 6 IP20170081 I 75 RECONSTRUCTION $1,000,000 STUDY HARD SHOULDER RUNNING IN NORTHERN KENTUCKY (ALL INTERSTATES). 183.312 - 190.8 46.5 Fayette 7 7-113.02 KY 4 MAJOR WIDENING $50,990,000 IMPROVE NEW CIRCLE ROAD FROM LEESTOWN ROAD TO NEAR GEORGETOWN ROAD. 7.26 - 8.26 46.4 Franklin 5 5-2035.71 I 64 MAJOR WIDENING $74,000,000 IMPROVE I-64 FROM MP 47.70 TO MP 53.75. 47.7 - 53.75 45.8 Monday, June 24, 2019 Page 4 of 8 SHIFT Statewide Score County District Item # Primary Route Project Type Remaining Project Cost: Description Max 100 Shelby 5 5-2035.40 I 64 MAJOR WIDENING $50,000,000 IMPROVE I-64 FROM KY-395 TO KY-151. Franklin 43.332 - 47.7 45.7 Montgomery 7 IP20080461 I 64 MAJOR WIDENING $36,257,000 IMPROVE SAFETY, CAPACITY, AND CONGESTION ON I-64 FROM THE CLARK/MONTGOMERY COUNTY LINE TO APPROXIMATELY 45.3 104.26 - 107.5 0.2 MILES EAST OF THE GRASSY LICK ROAD UNDERPASS. Shelby 5 5-65.40 I 64 MAJOR WIDENING $80,820,000 IMPROVE I-64 FROM 0.458 MILES EAST OF THE KY-55 INTERCHANGE TO THE KY-1790 UNDERPASS. 32.3 - 38.122 43.8 Montgomery 7 7-8819 I 64 MAJOR WIDENING $95,350,000 IMPROVE I-64 FROM MP 107.5 TO MP 113.7. 107.5 - 113.7 41.8 Jefferson 5 5-560 I 65 RECONSTRUCTION $100,000,000 IMPROVE SAFETY AND REDUCE CONGESTION AT THE I-65/I-265 (GENE SNYDER FREEWAY) INTERCHANGE. 124.7 - 125.7 40.1 Gallatin 6 6-8910 I 71 RECONSTRUCTION $40,030,000 IMPROVE GEOMETRICS ON I-71 FROM US-127 TO MP 64. 62.8 - 64 37.8 Graves 1 1-26 JC 9003 RECONSTRUCTION $18,880,000 IMPROVE THE PURCHASE PARKWAY FROM SOUTHWEST OF THE US-51 INTERCHANGE TO CARDINAL ROAD NEAR MAYFIELD 37.8 8.352 - 20 INCLUDING THE KY-339 INTERCHANGE IN WINGO, KY. Monday, June 24, 2019 Page 5 of 8 SHIFT Statewide Score County District Item # Primary Route Project Type Remaining Project Cost: Description Max 100 Fulton 1 1-25 JC 9003 RECONSTRUCTION $29,350,000 IMPROVE THE PURCHASE PARKWAY AT THE KENTUCKY/TENNESSEE LINE TO SOUTHWEST OF THE US-51 34.7 0 - 1.66 INTERCHANGE. Clay 11 11-8911/ HR 9006 MAJOR WIDENING $446,000,000 IMPROVE HR 9006 FROM LONDON TO HAZARD TO INTERSTATE 11-8908/ STANDARDS. 33.6 11-8909/ 11-8910 Pulaski 8-59.508 / 8-59.52 / 8-59.60 / 8-59.61 New Route NEW ROUTE $126,910,000 SOMERSET NORTHERN BYPASS (HAL ROGERS PKWY) SECTION 3; "GRADE AND DRAIN" FROM WEST OF THE BRIDGE OVER US-27 32.7 - AND THE SOUTHERN RR, E TO KY-39 N OF BROYLES RD. (INCLUDES INTERCHANGE AT KY-39). Jefferson 5 5-564 New Route TRANSPORTATION STUDY $5,000,000 SCOPING - NEW CONNECTION BETWEEN I-65 IN BULLITT COUNTY TO I-64 IN SHELBY COUNTY TO I-71 IN OLDHAM 31.9 - COUNTY. Clark 7 7-8506.01 I 64 MAJOR WIDENING $16,570,000 RECONSTRUCT I-64/MOUNTAIN PARKWAY INTERCHANGE TO ADD NEW RAMPS TO AND FROM THE EAST. 95.1 - 97.675 31.8 Clark 7 IP20080417 I 64 MAJOR WIDENING $83,350,000 IMPROVE I-64 FROM EAST OF THE BERT T. COMBS MOUNTAIN PARKWAY TO THE CLARK/MONTGOMERY COUNTY LINE. 97.775 - 104.26 30.7 Wolfe 10 10-168 KY 9009 MAJOR WIDENING $114,150,000 IMPROVE THE MOUNTAIN PARKWAY FROM 0.6 MILES WEST OF KY 191 OVERPASS TO 0.45 MILES WEST OF KY 205 INTERCHANGE. 45.8 - 56.8 28.9 Monday, June 24, 2019 Page 6 of 8 SHIFT Statewide Score County District Item # Primary Route Project Type Remaining Project Cost: Description Max 100 Magoffin 10 10-169 New Route MAJOR WIDENING $117,530,000 IMPROVE THE MOUNTAIN PARKWAY FROM US 460 TO THE MAGOFFIN/FLOYD COUNTY LINE. - 27.4 Kenton 6 IP20190073 I 275 RECONSTRUCTION $2,000,000 PLANNING STUDY OF THE I-275 CORRIDOR IN NORTHERN KENTUCKY. 79.5 - 81 27.2 Floyd 12 12-1.40 New Route MAJOR WIDENING $49,490,000 IMPROVE THE MOUNTAIN PARKWAY FROM NEELEY BRANCH ROAD TO COUNTY ROAD 1386 AT PRESTONSBURG ELEMENTARY 25.4 - SCHOOL.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    8 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us