Review of Lessons Learned and Best Management Practices for Dredging Inland Lakes

Review of Lessons Learned and Best Management Practices for Dredging Inland Lakes

Review of Lessons Learned and Best Management Practices for Dredging Inland Lakes Travis Merritts, Walter Dinicola, Chris Hayward, and Ram Mohan, Anchor QEA, LLC; Charles Grey, Columbia Association WEDA Dredging Summit & Expo 2014 Toronto, Ontario June 16, 2014 Columbia Association (CA) • Columbia, Maryland • Howard County • Private, non-profit association • 3,500 acres of open space • Lakes; parks; playgrounds; sports facilities; and pathways for walking, jogging, and biking 2 Dredging Summit & Expo 2014 Recent Dredging Work Wilde Lake (2012) Lake Kittamaqundi (2011) Lake Elkhorn (Phase 1: 2010-2011) (Phase 2: 2012) 3 Dredging Summit & Expo 2014 Recent Dredging Work (cont.) Volume Year(s) Project Dredge Type Removed (cy) Performed Wilde Lake DSC 8” 15,000 2012 Lake Elkhorn Phase 1 DSC 8” 17,000 2010-2011 Lake Elkhorn Phase 2 DSC 8” 28,000 2012 Lake Kittamaqundi Ellicott 8” and 12” 47,000 2011 4 Dredging Summit & Expo 2014 Review of CA Lake Maintenance Program Goals • Aesthetics • Restore lake capacity • Create catchment basin near inlet of lake • Increase duration between required dredge events 5 Dredging Summit & Expo 2014 Wilde Lake Overview • 22-acre, man-made lake • Residential and open space 6 Dredging Summit & Expo 2014 Wilde Lake Sedimentation • Island formation the result of lake sedimentation View from the Northwestern corner of the lake (facing east) 7 Dredging Summit & Expo 2014 Wilde Lake Dam • View of dam face (facing west) • Originally constructed in 1967 • Approximately 15 feet tall, 288 feet long • Significant (class 2) Hazard Dam 8 View of dam face (facing west) Dredging Summit & Expo 2014 Lake Kittamaqundi Overview • 27-acre, man-made lake • Residential, commercial, and open space 10 Dredging Summit & Expo 2014 Lake Kittamaqundi Overview (cont.) 11 Dredging Summit & Expo 2014 Lake Elkhorn Overview • 37-acre, man-made lake • Residential and open space 13 Dredging Summit & Expo 2014 Cost Summary Volume Cost per Project Removed (cy) Project Cost Cubic Yard Wilde Lake 15,000 cy $1,800,000 $120 Information not Lake Elkhorn Phase 1 17,000 cy N/A available Lake Elkhorn Phase 2 28,000 cy $3,200,000 $114 Lake Kittamaqundi 47,000 cy $5,000,000 $106 15 Dredging Summit & Expo 2014 Construction – What Went Right • Utilizing the same contractor to complete two projects – Reduced costs – Incentive to optimize schedule • Hydraulic dredging with mechanical dewatering • Bathymetric surveying to track construction progress and determine pay volumes • Disposal operations 16 Dredging Summit & Expo 2014 Construction – Inefficiencies • Initial cost inefficiencies from individual contracts • Variable physical properties of sediment • Pre-design surveys conducted with survey rod method • Disposal costs 17 Dredging Summit & Expo 2014 Contractor and Design Consultant Selection Process • All lakes were contracted separately • Open bid process • Scope of services • Low price bids with evaluation of qualifications • Contractor evaluation based on –Cost –Qualifications – Methodology and approach – Cover letter – Possible BAFO and interview process 18 Dredging Summit & Expo 2014 Future Considerations for CA Dredging Program • Increased monitoring of lakes • Enhanced watershed management • Regularly scheduled dredging events – Smaller volumes from focused removal areas • Consolidation of dredging contracts, if possible • Maintenance permits • On-site disposal opportunities • Retain single design consultant and/or contractor 19 Dredging Summit & Expo 2014 Watershed Improvement Projects 20 Dredging Summit & Expo 2014 Sediment Management Plans 21 Dredging Summit & Expo 2014 Dredge Event Scheduling • Regularly scheduled bathymetric surveys to track lake sedimentation • Focused dredging projects scheduled every 4 to 6 years – Approximately 5,000 to 12,000 cubic yard removal per lake • Lake dredging to be strategically scheduled so that projects may be performed sequentially, if possible 22 Dredging Summit & Expo 2014 Disposal Options • Sediment Management Plans include the evaluation of potential on-site disposal sites • Off-site, CA-owned properties • Privately owned property for lease or purchase 23 Dredging Summit & Expo 2014 Summary 24 Dredging Summit & Expo 2014.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    21 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us