Road Modifications with Sarcee Trail, Glenmore Trail, Crowchild Trail Area

Road Modifications with Sarcee Trail, Glenmore Trail, Crowchild Trail Area

Future West Calgary Ring Road 4 3 Fitting the Southwest Calgary Ring Road (SWCRR) with Calgary’s road network Sarcee Trail, Glenmore Trail, Crowchild Trail area Location Changes (construction and improvements) Schedule and notes Sarcee Trail/Richmond Road An interchange is recommended to manage The interchange is unfunded at this time. S.W. intersection traffic flow on Sarcee Trail in the short term and long term. This interchange will encourage more people It will be reviewed as part of The City’s Investing to use Sarcee Trail and reduce pressure on local in Mobility evaluation process, to be updated in streets in the area. 2018. Richmond Road/37 Street Modify existing traffic signal timing to better Schedule is to be determined, prior to 2021. S.W. intersection manage traffic. Richmond Road/Sarcee Road Monitor the intersection after SWCRR opens to Can install modifications, if required, once ring S.W. intersection determine if modifications are needed. road is open. 37 Street/46 Avenue S.W. Modify the intersection to manage traffic flow, Schedule is to be determined, prior to 2021. (Richardson Way S.W.) with specific changes for vehicles traveling intersection north and west. Details and designs of those changes are Modifications consider future traffic from Currie currently underway. Barrack development and Mount Royal University. continued on next page calgary.ca/swrr | contact 311 Fitting the Southwest Calgary Ring Road (SWCRR) with Calgary’s road network Sarcee Trail, Glenmore Trail, Crowchild Trail area (continued) Location Changes (construction and improvements) Schedule and notes Glenmore Trail, between 37 Reconstruct and widen Glenmore Trail to six Design is expected to occur in 2017, followed by Street S.W. and Crowchild Trail lanes to accommodate changes to traffic construction in 2018. volume and patterns, as well as rebuild the 3 aging Glenmore Trail. Glenmore Trail/Crowchild Modify the current interchange to manage Design is expected to occur in 2017 followed by Trail interchange traffic moving from east to north. construction in 2018. 4 Modifications are expected to use the existing A study, to update future long term plans for the structure. interchange, is expected to occur in 2017-2019. calgary.ca/swrr | contact 311.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us