Cwprs Monthly Information Bulletin ______

Cwprs Monthly Information Bulletin ______

Government of India Ministry of Water Resources River Development & Ganga Rejuvenation Central Water & Power Research Station Khadakwasla, Pune – 411 024 Issue No.: 05 May 2018 ____________________________________________________________________ CWPRS MONTHLY INFORMATION BULLETIN ________________________________________________________________________________ 1. ESTIMATES 1.1 Submitted 03 1.2 Awarded 05 2. REPORTS SUBMITTED 06 3. RESEARCH PAPERS 3.1 Submitted 07 3.2 Published 07 4. PARTICIPATION IN SEMINARS/ SYMPOSIA/ CONFERENCES 07 5. LECTURES DELIVERED 07 6. PARTICIPATION IN MEETINGS 6.1 Technical Committees 07 6.2 Other Committees 07 7. TRAINING OF PERSONNELS 08 8. IMPORTANT VISITORS 08 9. NEW APPOINTMENTS / PROMOTIONS / RETIREMENTS 08 10. TRAINING PROGRAMMES ORGANIZED 09 11. OTHER INFORMATION 09 Phones : 24103378 Fax : 2438 1004 Email : [email protected] web: http://cwprs.gov.in May 2018 Summary Information For 2010-2018 Years Jobs Awarded Reports Papers Participation Lectures Technical Training of Training Submitted Published in Seminars/ Delivered Committee Personnel Programmes/ _____________________ Symposia/ Meetings Conferences Nos. | Amount (Rs.) Conferences Organized 2010-11 159 17,06,34,397 95 94 38 52 23 61 11 2011-12 139 18,56,13,568 116 63 26 45 42 88 08 2012-13 150 22,53,10,859 120 67 44 57 24 55 08 2013-14 152 18,24,51,087 112 63 37 68 21 54 11 2014-15 153 25,69,14,032 113 62 58 47 12 62 09 2015-16 85 13,95,89,971 106 65 51 74 17 120 10 2016-17 111 25,90,34,704 95 90 114 97 23 315 17 2017-18 147 33,97,19,710 105 58 64 38 38 823 18 STUDIES AWARDED FOR CURRENT YEAR 2018-2019 Till April 2018 15 2,80,93,850 06 06 07 00 03 24 01 During 10 1,51,06,796 05 00 00 01 13 08 00 May -18 Total 25 4,32,00,646 11 06 07 01 16 32 01 Estimate submitted to Client but yet to be awarded May 2018 31 4,00,20,181 - - - - - - - 2 CWPRS Information Bulletin May 2018 1. ESTIMATES 1.1 Submitted: ( 31 Nos. totaling to Rs. 4,00,20,181/- ) Sl. Amount Name of Work Sponsoring Agency Division No. (Rs.) Mathematical model studies for shoreline Chief Engg. Harbour Engineering PH-I 8,00,590 1 charges for the fishing Harbour at South Department,Kamleswaram,Manaca Paravoor, Kollam District, Kerala. ud,P.O.Thiruvananthapuram- 695009,Kerala. Sub-bottom reflection profiling survey at Shri Balkrishna, GP 33,99,680 2 Versova Bandra sea link Mumbai, Additional Chief Engineer, Maharashtra. M/S WAPCOS Limited, Swastik Gulmohar Path, Opp Law College Road. Erandawane, Pune -411004, Mah arashtra. Studies for diversion of Sukri River Sudhir Mukherjee, SWH 25,00,320 3 passing through Tubed Coal block,Dist Deputy Chief Engineer (Mech) Latehar, Jharkhand for M/s Damodar Damodar Valley Corporation Valley Corporation. Kolkata-700054 4 Determining the Insitu strength Ex. Engg. GE-I 7,60,020 parameters of masonry of Temghar Dam, Bhama Askhed Dam Division, Dist -Pune -Maharashtra. Pune -411037,Maharashtra 5 Studies for determining Insitu properties Lead Engg Headworks-Hydros, GE-I 7,48,597 of Shirota Masonry Dam Tata Power Tata Power Company Limited, Company, Lonaval, Dist - Pune, Head works office Lonavala. Maharashtra. Dist-Pune-410401 6 Studies for determining Insitu properties Lead Engg Headworks-Hydros, GE-I 5,53,770 of Walvhan Masonry Dam Tata Power Tata Power Company Limited, Company, Lonavala, Head works office Lonavala. Dist-Pune-Maharashtra Dist-Pune-410401 7 Site inspection for the proposed Field Ex .Engg, HAPT-I 5,36,160 studies of Sone Canal System for different Sone Canal Division, reaches of canals to conduct seepage Bikramgani,Dhangain, Nahar analysis, soil test and Ground Water Level Office,Bikramgani,Rohtas. observations, sone canal system. Bihar-802212 Bikramgani, Bihar. 8 Site Calibration of water meters for JSW Mr. Chandrashekhar Karanjkar HMC 4,29,100 steel Ltd, Dolvi Maharashtra. AGM, Utility, JSW Steel Ltd. Dolvi works, Geetapuram. Dolvi, Taluka-Pen.Dist-Rajgad-402017, Maharashtra. 9 Estimation of site Specific Design Superintending Engineer, Satara ES 12,97,230 Parameters for Jihe Kathapur Lift Irrigation Project Circle, Krsihna Irrigation Project, Maharashtra. Nagar Sinchhan Bhavan, Satara- 415003, Maharashtra. 10 Nuclear Borehole Logging for Ex.Engg, IH 12,00,820 determination of In-situ density at Bhama Askhed Dam Division, Temghar dam Project, Maharashtra. Near Mutha Canal Swargate, Pune-411037 11 Assessment of suitable epoxy based grout Chief Engineer CT 15,02,940 systems through laboratory studies (Electrical Design), Karnataka towards grouting of distressed concrete Power Corporation Ltd, thrust blocks of water conductor system at Sudarshan Complex, Sharavathi generations Station 3rd Floor 22/23, Sheshadri Road, Gerusoppa, Karnataka. Bengaluru Karnataka-560009 3 CWPRS Information Bulletin May 2018 12 Assessment of micro concrete/fiber Chief Engineer CT 10,04,750 reinforced concrete through laboratory (Electrical Design), Karnataka studies towards strengthening of Power Corporation Ltd, Sudarshan distressed concrete thrust blocks of water Complex,3rd Floor 22/23, conductor system at Sharavathi Sheshadri Road, Bengaluru, generations Station, Gerusoppa, Karnataka-560009 Karnataka. 13 Design of suitable cementations grout mix Chief Engineer CT 9,64,010 through laboratory studies towards (Electrical Design), grouting of rock strata for arresting Karnataka Power Corporation Ltd, seepage through breast wall in valve Sudarshan Complex, house of Sharavathi generating Station, 3rd Floor 22/23, Sheshadri Road, Gerusoppa Karnataka. Bengaluru Karnataka-560009 14 Desk studies for disposal of dredged Shri. Ramji Gupta, PH-II 3,98,190 material of maintenance dredging for M/s DGM,(LNG-O & M) Kokan LNG Pvt.Ltd.(KLPL) at Anjanwel, Kokan LNG Private Ltd. at post- Dabhol, Ratnagiri Maharashtra. Anjanvel, Tal-Guhagar. Dist-Ratnagiri(415634), Maharashtra. 15 Seismic Tomography studies at Temghar Ex. Engg, GP 19,04,400 Dam, Maharashtra. Bhama Askhed Dam Division, Near Mutha Canal, Swargate, Pune- 411037 16 Running and Maintenance of Kandla Port Ex. Engg. PH-I 16,42,930 Model (Scale H-1/300, V-1/50) during (Harbour) Deendyal (Kandla) Port (2018-19.) Trust Nirman Bhavan, New Kandla, Kutchch, Gujarat-370210 17 Studies of Turbo Alternator Foundation of Shri S.K. Rama, VT 10,50,270 unit No.06 at SAIL, Rourkela steel Plant, The DGML I/C, CPP-I Steel, Rourkela, Odisha. Authority of India Ltd, Rourkela Steel Plant, Rourkela, Odisha-769011 18 Mathematical model studies for wave Ex. Engg. MMCE-II 16,96,114 tranquility and shoreline changes for Port Division, Baitkal, Karwar development of fish landing centre at Karnataka-581302 Murucleshwar, Karnataka. 19 Desk and Wave flume studies for the Ex. Engg. CHS-II 9,96,820 design of breakwaters for the Port Division, Baitkal, Karwar development of fish landing centre at Karnataka-581302 Murudeshwar, Bhatkal Tal, Uttar Kannada. Dist - Karnataka. 20 Geotechnical stability and settlement Ex. Engg. GE 7,63,530 studies for breakwater at proposed Port Division, Baitkal, Karwar Murdeshwar fish Landing Centre, Uttar Karnataka-581302 Kannada district, Karnataka. 21 Organizing one week long hydrographic Shri T.P.Mahato, CHS 3,86,120 Training Course for Naval officers of Commandore, Officer in National National Institute of Hydrography Goa, at Institute of Hydrography, CWPRS, Pune. Headquarter, Goa Naval Area, Vasco -da -Gama, Goa -403802 22 Calibration/Validation of open channel Ex. Engg, HAPT-I 9,44,450 ultrasonic non insertion type flow meters (E & M) HP-1, Delhi Jal Board, in carrier lined channel (CLC) & Delhi sub Govt of NCT of Delhi, branch(DSB), Delhi Jal Board, Delhi Haiderpur Water Works, Delhi-110085 4 CWPRS Information Bulletin May 2018 23 Assessment of suitable epoxy based grout Ex. Engg, CT 14,26,700 systems by conducting laboratory studies Krishna Bhagya Jala Nigham Ltd, towards controlling seepage of water KBJNL Dam Division Almatti through spillway pipes of Almathi Dam, Bijapur. (Dist), Karnataka-586201 Karnataka. 24 Hydraulic model studies of pump sump Shri Subeesh B.Balkarishnan, HMC 4,54,560 of New dry Project, Kochi for m/s L & T. Mechanical Nuclear Design (BOP) Chennai-600089 EDRC&T , L&T construction- Infrastructure, TC-3, Taware, V Floor, B-Wing, Manappakan, Chennai-600089 25 Strain measurement in ten surface Chief Engineer, SMA 54,14,890 penstocks during in-situ Hydro Test (Electrical Designs) Karnataka under Static and Running Conditions for Power Corporation Ltd, Sharavathy Generating Station Sudarshan Complex, 3rd floor Gerusoppa, KPCL, Karnataka. 22/23 Sheshadri Road, Bengaluru, Karnataka-560009 26 Stress Analysis of Trust Blocks of surface Chief Engineer, SMA 19,92,690 Penstocks by finite Element Method for (Electrical Designs) Karnataka Sharavathy Generating Station, Power Corporation Ltd, Gerusoppa KPCL, Karnataka. Sudarshan Complex, 3rd floor 22/23 Sheshadri Road, Bengaluru, Karnataka-560009 27 Desk studies for the design of coastal Executive Engineer, CHS-II 2,92,420 protection work at Toppalkeri in Port Division, Baitkhol Karwar, Honnavar Taluka of Uttar Kannada Uttar Kannada Karnataka district Karnataka-581302 28 Mathematical model studies to route the Ex.Engg, RH 34,80,150 flood in river Ujh and its tributaries, Flood Control Division, Kathua, Jammu & Kashmir. Jammu & Kashmir-184101 29 Determination of properties of soil and Ex. Engg, GE-II 3,14,710 assessing suitability as hearting material Lower Tapi Dam Sub Division -2 for proposed earthen dam for Lower Tapi Chopda, Dist. Jalgoan, Project, Jalgoan, Maharashtra. Maharashta-425001 30 Desk studies for the design of coastal Ex. Engg, CHS-II 2,92,420 protection works at Kovval-Koppal Office of Executive Engineer, Kadappuram & Chembarika Kadappuram Irrigation division , Vidayanagar in Kasargod, Dist: Kerala. Civil Station, Kasargod, Kerala-671123 31 Mathematical Model studies to assess Ex. Engg, MMCE 8,70,830 littoral drift and Shoreline change due to Office of Executive Engineer, proposed coastal protection work near Irrigation division , Vidayanagar Kadapurram, Kasargod, Kerala. Civil Station, Kasargod, Kerala-671123 1.2 Awarded: (10 Nos.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    9 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us