Pacificorp Overview Pacificorp Pacific Power and Rocky Mt

Pacificorp Overview Pacificorp Pacific Power and Rocky Mt

PacifiCorp Overview PacifiCorp Pacific Power and Rocky Mt. Power • Serve approx. 1.9 million customers in OR WA CA ID UT &WY • Service area covers 141,000 square miles • Own 10,887 MW of generation • Own 2,198 MW of non carbon generation • Own and operate approx. 16,500 miles of transmission lines in 10 states • Own and operate approx. 64,000 miles of distribution lines 2 PACW System • California, Oregon and Washington • Transmission voltages: 500 kV, 230 kV, 115 kV, 69 kV, 57 kV • 15 primary area load bubbles in the PACW system • Most are interconnected by Bonneville Power Administration (BPA) main grid transmission • 4,354 MW record peak demand • Over 750,000 customers across three states • Over 4,300 circuit-miles of transmission lines PACE System • Idaho, Utah and Wyoming • Transmission voltages: 500 kV, 345 kV, 230 kV, 161 kV, 138 kV, 115 kV, 69 kV, 46 kV • 12 primary area load bubbles in the PACE system; 5 sub-bubbles in Wasatch Front • 9,142 MW record peak demand • Over 1,100,000 customers across three states • Over 12,000 circuit-miles of transmission lines 3 4 1 6 2 Legend 5 7 1 – North Wyoming 2 – East Wyoming 3 3 – Central Wyoming 4 – Trona 4 5 – Naughton 8 6 – Goshen 7 – Southeast Idaho 8 – Wasatch Front 9 – Clover 9 10 – Southwest Utah 11 – Southeast Utah 12 – East Utah 12 10 11 5 PacifiCorp Interconnections PACE BAA PACW BAA Bonneville Power Administration Arizona Public Service Portland General Electric NV Energy Avista Los Angeles Water & Power Grant County PUD NorthWestern Energy Idaho Power WALC-Phoenix California ISO Idaho Power Pacific Gas and Electric Clark County PUD WACM-Loveland Cowlitz PUD WAPA Benton County PUD Black Hills Power Klickitat PUD Utah Area Municipal Power Systems Columbia Power REA Utah Municipal Power Agency Tillamook PUD Western Oregon electric Co-Op Deseret Central Electric Co-Op Basin Electric Co-Op Surprise Valley Electric Co-Op Inter Mountain Power Producers TriState Generation & Transmission Public Service of New Mexico 6 7 System Planning • Annual load and resource plan – 10 year horizon • Yearly reliability compliance studies – 1, 5 and 10 year horizons • Bi-annual regional plan – 10 year horizon • Bi-annual integrated resource plan – 20 year horizon • Local load area studies – 5-10 year horizon, areas updated on 2-5 year cycle 8 Questions 9.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    9 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us