(C) (BS) Status As on 31.12.2013 SN Tender No. Tender Description Dt. Of

(C) (BS) Status As on 31.12.2013 SN Tender No. Tender Description Dt. Of

TENDER-WISE STATUS OF REFUNDED EMD Department : S.O. (C) (BS) Status as on 31.12.2013 S.N Tender No. Tender description Dt. of Name of Bidder EMD Value Period of Finalization Date of Remarks Opening depositing EMD of Contract/Issue of refund EMD purchase/order 1 1885 Repair of Motor cycle shed near Pit Office through Bisa Project. 19.06.13 Akhlesh Kr. Singh 1278.00 1 month 10.12.13 Refunded 07.06.2013 2 Heightening & widening of Embankment near ¾ Incline of Urimari 08.03.13 Parasnath Prasad 11213.00 3 months 10.12.13 -do- under ground Sayal-D Project. 3. 3451 Misc. R/M of one no, 2B type and one no, M.Qtr at Sayal under CGM 08.08.12 Satyendra Kr. Singh 130.00 8 days 05.10.13 Refunded 28.07.12 Unit (BS), Sayal. 4. 3451 Repair/Maint. of one unit 1C, one unit 1BR and 4 units MQ at Sayal-D 08.08.12 -do- 1330.00 1 month 05.10.13 -do- 28.07.12 Project. 5. 3451 Repair/maint. of one MQ of Bigan saw one unit 1B of Md. Sohrab at 8.08.12 -do- 920.00 1 month 05.10.13 -do- 28.07.12 Sayal colony and one unit 1CR of Raj Kishore Yadav t R/Side under Sayal-D Project. 6. 8249 Construction of first Aid centre through Urimari Open cast project. 31.12.12 -do- 1637.00 11/2 month 05.10.13 -do- 19.12.12 Plinth area- 17sqm. 7. 2300 R/M of one unit B-type two unit MQ and one unit old type qtr under 31.12.12 Om prakash Singh 950.00 1 month 05.10.13 -do- 20.06.13 CGM Unit (BS). 8. 3631 Repair/Maint. of 2CR type qtr of Sri S.P. Singh (S.E) E&M of 14.08.12 Ashok Kr. Singh 344.00 15 days 08.10.13 -do- 04.08.12 Bhurkunda Colliery at River side colny. 9. 3529 Repair/Maint. of 4 Nos C-type qtrs D/S at C/Saunda Colliery. 14.08.12 -do- 4808.00 5 month 08.10.13 -do- 31.07.12 10 1248 Repair/Maint. of group VTC at Saunda-D under CGM Unit (BS), Sayal 06.06.13 -do- 932.00 3 month 08.10.13 -do- 18.05.13 11 8999 Construction of PCC Road from the house of Charku Saw of Partand 30.01.13 -do- 12760.00 3 month 08.10.13 -do- 09.01.13 tola to Godia nal of Saunda Basti under CGM Unit (CSR Scheme) Length-750.00 mtrs. 12 13049 Spl. R/M pf 4 nos MQ (D/S) block No. 6 of C/Saunda Project. 29.02.12 Jyoti Kr. Singh 1093.00 1 month 22.10.13 -do- 20.02.12 13 1251 Cleaning & repair of drain and other misc. work around C-type (D/S) 27.05.13 Tarkeshwar Pandey 1277.00 1 month 22.10.13 -do- 18.05.13 qtrs at C/Saunda Colliery. 14 11771 Repair of 400mm dia Main pipe line Chamber at Saunda under 22.03.13 -do- 302.00 7 days 22.10.13 -do- 18.03.13 C/Saunda Colliery. 15 7610 Writing qtr number for Saunda under CSaunda. 06.12.12 -do- 430.00 15 days 22.10.13 -do- 24.11.12 16 3308 Day to day Civil repair and maintenance of different type of quarters at 007.08.13 -do- 2460.00 3 month 22.10.13 -do- 20.07.13 C/Saunda Colliery, 17 8668 Maintenance of G.E. water supply pipe line at Central Saunda Colliery. 11.01.13 -do- 834.00 1 month 22.10.13 -do- 01.01.13 18 1291 Supplying and distribution of drinking water in New Barrack colony 24.05.13 Madan Lal Yadav 1539.00 90 days 23.10.13 -do- 18.05.13 Patel Nagar and other places as & when required through Bhurkunda Project. 19 -do- Making channel for storage of water in Damodar River near pump 24.05.13 -do- 900.00 1 month 23.10.13 -do- foundation both places at Check post near B-type qtr and Officer colony at Urimari Project. 20 615 Sprinkling of water for dust suppression of C/Saunda Rly siding and 10.05.13 -do- 4959.00 290 days 23.10.13 -do- 25.04.13 Saunda Siding uder Urimari Project. 21 1216 Supplying and Distribution of drinking water for the villages of Bar 27.05.13 M/S Baban Kumar 3591.00 210 days 23.10.13 -do- 16.05.13 Tola Northern part, Murga Tola ,Badki Tand, Pargada , Gera Tola & other Tolas as and when required through Birsa Project. 22 1910 Sprinkling with supplying and distribution of drinking water in Tillaya 18.06.13 -do- 3591.00 210 days 23.10.13 -do- 08.06.13 Tola, Ashwa Tola and other villages as & when required through Urimari Project. 23 1538 Sprinkling of water for dust suppression along Coal Transportation 06.06.13 -do- 3591.00 210 days 23.10.13 -do- 27.05.13 Road from Potanga to Saunda Railway Crossing through Urimari Project. 24 1344 Supplying and Distribution of drinking water by water tankar at Shiva 24.05.13 -do- 1026.00 60 days 23.10.13 -do- 20.05.13 Mandir, 2&3 no. Hutment, Pagla Ashram, Teliwan Dhawra and other places as and when required under Bhurkunda Project. 25 11575 Sprinkling of water for dust suppression in Mines area, Pit Office, 25.03.13 -do- 4959.00 290 days 23.10.13 -do- 14.03.13 Work shop area, Drill Point & Adjacent Road area through Birsa Project. 26 9810 Day to day Replacement of pipe line for water supply purpose in 14.02.13 Shailendra Kr. 288.00 15 days 23.10.13 -do- 02.02.13 employees quarters of Birsa Project. Singh 27 8843 Picking of stone boulder earthen heap cutting and removal of stone 15.01.13 -do- 924.00 1 month 23.10.13 -do- 04.01.13 boulder from Coal stock near feeder breaker through Uriamri Project. 28 5134 R/M of one unit 1B-type and one unit MQ at Sayal colony under Sayal- 18.09.12 -do- 470.00 15 days 23.10.13 -do- 03.09.13 D Project. 29 -do- Bush cutting cleaning and repairing of drain berm cutting and widening 18.09.12 -do- 518.00 15 days 23.10.13 -do- of road outside of Damodar bridge near B-type qtr through Urimari Project. 30 11258 Misc. repair work in water supply at Urimari Project. 24.03.11 -do- 288.00 15 days 23.10.13 -do- 12.03.13 31 9361 Cleaning of spillage coal and filling of Pot Holes of CTR from Nalkari 31.01.13 -do- 581.00 15 days 23.10.13 -do- 19.01.13 Bridge to middle school sayal under CGM Unit (BS), Sayal. 32 5511 Approach road to Saunda-B siding Manager Office and feeder breaker 27.09.12 -do- 1640.00 11/2 month 23.10.13 -do- 14.09.12 through Urimari Project. 33 7987 Conversion of pump house to kitchen room and smithy room dining 19.12.12 Ashok Kr. Chouhan 1428.00 1 month 24.10.13 -do- 06.12.12 hall and washing platform of BTTI Bhurkunda under CGM Unit (BS) 34 9219 Providing pucca drain east side of colliery store at Bhurkunda project. 31.01.13 -do- 2531.00 11/2 month 24.10.13 -do- 15.01.13 35 10181 Repair & Maintenance of Area Laboratory at Bhurkunda. 22.02.13 Rabindra Kr. Singh 1428.00 15 days 24.10.13 -do- 11.02.13 36 2300 Urgent repair of damaged roof of lower simana haulage room and 28.06.13 -do- 493.00 15 days 24.10.13 -do- 20.06.13 trammer shed through Bhfurkunda Project. 37 7744 Construction of temporary shed for transformer at Lapanga colony 12.12.12 -do- 808.00 15 days 24.10.13 -do- 29.11.12 under Bhurkunda project. 38 6600 Heightening of Transformer platform boundary wall and providing 30.10.12 -do- 1496.00 1 month 24.10.13 -do- 18.10.12 cable trench at Argada Sub-station at Bhurkunda Project. 39 1035 Repair of collapse boundary wall of Colliery store at Bhurkunda 17.05.13 -do- 859.00 15 days 24.10.13 -do- 09.05.13 Project.R/M of Rest house at Sayal under CGM Unit (BS), Sayal. 40 10629 R/M of Rest house at Sayal under CGM Unit (BS), Sayal. 06.03.13 Sanjay Kumar 1478.00 15 days 25.10.13 -do- 23.02.13 41 3949 Painting and writing quarter number at Sayal-D Project. 27.08.13 -do- 389.00 10 days 25.10.13 -do- 14.08.12 42 4669 Repair of sanitary work of 40 unit employees qtrs of Urimari Project. 30.08.13 -do- 2084.00 2 month 25.10.13 -do- 17.08.13 43 4971 Jungle cleaning in the premises of Patratu water works under Sayal –D 14.09.12 -do- 303.00 15 days 25.10.13 -do- 29.08.13 Project. 44 8734 R/M of 6 units MQ at PWW under Sayal-D Project 15.01.13 Sanjay Kumar 1867.00 1 month 25.10.13 -do- 03.01.13 45 8868 Repairint of pipe line in Giddi and Barkakana line of PWW under 15.01.13 -do- 403.00 15 days 25.10.13 -do- 05.01.13 Sayal=D Project.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    6 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us