Auditorium, Break Areas & C-Wing Millwork

Auditorium, Break Areas & C-Wing Millwork

CFIA OLF Building 201 3851 FALLOWFIELD RD. NEPEAN, ONTARIO AUDITORIUM, BREAK AREAS & C-WING MILLWORK GRC Project #1217 Issued for Tender September 29, 2017 CFIA OLF Building 201 Auditorium, Break Areas and C Wing Millwork GRC Project #1217 TABLE OF CONTENTS Page 1 LIST OF SPECIFICATIONS Pages Division 01 - General Requirements Section 01 00 10 – General Instructions...………………………………………………6 Section 01 14 00 – Work Restrictions ...................................................................................... 2 Section 01 14 25 - Designated Substances ............................................................................. A current Designated Substances Report is available for Contractor Review Section 01 31 19 - Project Meetings ........................................................................................ 2 Section 01 32 16.06 - Construction Progress Schedule - Critical Path Method (CPM) ................................................................................................................................................. 8 Section 01 33 00 - Submittal Procedures ............................................................................... 5 Section 01 35 29.06 - Health and Safety Requirements .................................................... 3 Section 01 45 00 - Quality Control ............................................................................................ 2 Section 01 51 00 - Temporary Utilities ..................................................................................... 2 Section 01 52 00 - Construction Facilities .............................................................................. 4 Section 01 56 00 - Temporary Barriers and Enclosures .................................................... 2 Section 01 61 00 - Common Product Requirements ........................................................... 4 Section 01 73 00 - Execution ...................................................................................................... 2 Division 02 - Existing Conditions Section 02 41 99 - Demolition .................................................................................................... 2 Division 05 - Metals Section 05 51 29 – Handrails ...................................................................................................... 3 Section 05 73 10 – Glass Railing System ............................................................................... 3 Division 06 - Wood and Plastics Section 06 10 00 - Rough Carpentry ........................................................................................ 2 Section 06 40 00 – Architectural Woodwork .......................................................................... 7 Division 07 - Thermal and Moisture Protection Section 07 84 00 - Firestopping ................................................................................................. 4 Section 07 92 00 - Joint Sealants .............................................................................................. 5 Division 08 – Openings Section 08 00 00 – Door Schedule ........................................................................................... 2 Section 08 11 00 – Metal Doors and Frames ........................................................................ 4 Section 08 71 00 – Door Hardware ........................................................................................... 9 Division 09 - Finishes Section 09 21 99 – Interior Partitions ....................................................................................... 5 Section 09 68 00 - Carpeting ...................................................................................................... 4 Section 09 80 00 – Acoustic Treatment ................................................................................... 3 Section 09 91 13 - Painting ......................................................................................................... 5 CFIA OLF Building 201 Auditorium, Break Areas and C Wing Millwork GRC Project #1217 TABLE OF CONTENTS Page 2 Division 10 - Specialties Section 10 44 16.19 – Fire Extinguishers and Safety Blankets ...................................... 2 Division 12 - Furnishings Section 12 61 13 – Upholstered Audience Seating ............................................................ 4 Division 23 - Heating, Ventilating and Air Conditioning (HVAC) Section 23 05 00 – Common Work Results for Mechanical ............................................. 4 Section 23 05 01 - Use of HVAC Systems during Construction ...................................... 1 Section 23 05 93 - Testing, Adjusting and Balancing for HVAC .................................... 5 Section 23 05 94 - Pressure Testing of Ducted Air Systems ............................................ 4 Section 23 07 13 - Duct Insulation ............................................................................................ 5 Section 23 09 43 - Pneumatic Control System for HVAC .................................................. 3 Section 23 31 13.01 - Metal Ducts – Low Pressure to 500 Pa ......................................... 6 Section 23 33 00 - Air Duct Accessories ................................................................................. 4 Section 23 33 14 - Dampers – Balancing ............................................................................... 3 Section 23 33 16 - Dampers – Fire and Smoke .................................................................... 4 Section 23 37 13 - Diffusers, Registers and Grilles ............................................................. 3 Section 23 82 19 - Fan Coil Units .............................................................................................. 3 Division 26 - Electrical Section 26 05 00 – Common Work Results for Electrical ........................................ 7 Section 26 05 20 - Wire and Box Connectors 0-1000 V .......................................... 3 Section 26 05 21 - Wires and Cables (0-1000 V) .................................................... 3 Section 26 05 22 - Connectors and Terminations .................................................... 2 Section 26 05 32 - Outlet Boxes, Conduit Boxes and Fittings .................................. 3 Section 26 05 34 - Conduits, Conduit Fastenings and Conduit Fittings ................... 4 Section 26 09 24 – Lighting Control Devices ........................................................... 4 Section 26 24 16.01 – Panel Boards Breaker Type ................................................. 2 Section 26 24 16.01 – A – Appendix – Electrical Panels ......................................... 7 Section 26 27 26 - Wiring Devices ........................................................................... 4 Section 26 28 16.02 - Moulded Case Circuit Breaker .............................................. 3 Section 26 50 00 – Lighting ..................................................................................... 5 Section 26 53 00 – Exit Signs .................................................................................. 2 Division 27 - Electrical Section 27 53 13 – Clock Systems ......................................................................... 2 Division 28 – Electronic Safety and Security Section 28 31 00.01 – Multiplex Fire Alarm System ........................................................... 6 END OF TABLE CFIA OLF Building 201 Auditorium, Break Areas and C Wing Millwork Section 01 00 10 GRC Project #1217 GENERAL INSTRUCTIONS Page 1 of 6 Part 1 General 1.1 TAXES .1 Pay all taxes properly levied by law (including Federal, Provincial and Municipal). 1.2 FEES, PERMITS and CERTIFICATES .1 Pay all fees and obtain all permits except for the building permit. Provide authorities with plans and information for acceptance certificates. Provide inspection certificates as evidence that work conforms to requirements of Authority having jurisdiction. 1.3 REGULATORY REQUIREMENTS .1 References and Codes: .1 Materials shall be new and work shall conform to the minimum applicable standards of the “References” indicated in the specification sections, the National Building Code of Canada 2015 (NBC) and all applicable Provincial and Municipal codes. In the case of conflict or discrepancy the most stringent requirement shall apply. .2 Building Smoking Environment: .1 Smoking is not permitted in the Building. Obey smoking restrictions on building property. .3 Hazardous Material Discovery: .1 Stop work immediately when material resembling spray or trowel-applied asbestos, Polychlorinated Biphenyl (PCB), mould or other designated substance, hazardous substance is encountered during demolition work. .1 Take preventative measure and promptly notify Consultant. .2 Do not proceed until written instructions have been received from Consultant. 1.4 FIRE SAFETY REQUIREMENTS .1 Comply with both the National Building Code of Canada 2015 and the National Fire Code of Canada 2015 for safety of persons in buildings in the event of a fire and the protection of buildings from the effects of fire, as follows; .1 The National Building Code (NBC): for fire safety and fire protection features that are required to be incorporated in a building during construction. .2 The National Fire Code (NFC): .1 The on-going maintenance and use of the fire safety and fire protection features incorporated in buildings. .2 The conduct of activities that might cause fire hazards in and around buildings. .3 Limitations on hazardous contents in and around buildings. .4 The establishment

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    250 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us