Palm Beach Metropolitan Planning Organization Technical Advisory

Palm Beach Metropolitan Planning Organization Technical Advisory

PALM BEACH METROPOLITAN PLANNING ORGANIZATION th 2300 N. Jog Rd., 4 .Floor, West Palm Beach, Florida 33411-2749 Phone 561.684.4170 Fax 561.242-7165 www.PalmBeachMPO.org CITIZENS ADVISORY COMMITTEE – AGENDA DATE: WEDNESDAY, MAY 7, 2014 TIME: 1:30 P.M. PLACE: Vista Center 4th Floor Conference Room 4E-12 2300 North Jog Road, 4th Floor West Palm Beach, Florida 33411 1. REGULAR ITEMS A. Roll Call B. MOTION TO ADOPT Agenda for May 7, 2014 C. MOTION TO APPROVE Minutes for April 2, 2014 D. Comments from the Chair E. Executive Director’s Report F. General Public Comments and Public Comments on Agenda Items Any members from the public wishing to speak at this meeting must complete a Comment Card which is available at the welcome table. General Public comments will be heard prior to the consideration of the first action item. Public comments on specific items on the Agenda will be heard following the presentation of the item to the Committee. Please limit comments to three minutes. 2. ACTION ITEMS A. MOTION TO RECOMMEND APPROVAL of the FY 15-16 Unified Planning Work Program Attached is the final two-year FY 15-16 Unified Planning Work Program (UPWP) for the Palm Beach MPO incorporating stakeholder input and review comments. The UPWP is a statement of work identifying the planning priorities and activities to be carried out within a metropolitan planning area. The UPWP includes a description of the planning work and resulting products, who will perform the work, time frames for completing the work, the cost of the work, and the source(s) of funds. It is essentially a business plan and budget for the MPO. The estimated cost of the Program is approximately $2M per year. Federal funds comprise 89% of the total, State funds are 7% and local funds are 4%. B. MOTION TO RECOMMEND APPROVAL of Amended FY 15-19 Priorities: US 1 Bridge and second Tri Rail Station in Boca Raton The Palm Beach MPO adopted a list of priority projects for FY 15-19 on September 19, 2013. This list guides FDOT in development of their work program and leads to project funding in the MPO’s Transportation Improvement Program (TIP). There are two projects in the current TIP for which the MPO can leverage federal funds together with state funds to significantly enhance the transportation system: The introduction of $2-3M in federal funds to the US 1 bridge rehabilitation over the Loxahatchee River (FM 428400.1) will provide dedicated bicycle and pedestrian facilities. Without the federal funds the project would only provide pedestrian facilities. The introduction of up to $8.5M in federal funds to the second Boca Tri-Rail station (FM 430458.1) will retain state 50% matching funds allocated to the project via the Transportation Regional Incentive Program (TRIP). Without the federal funds the project would be deferred and state matching funds would be lost. C. MOTION TO RECOMMEND ENDORSEMENT of the 2040 Long Range Transportation Plan Desires Plan Leftwich Consulting Engineers (LCE) will provide maps and tables identifying major roadway, transit and freight improvements for inclusion in the 2040 LRTP Desires Plan. This information has been refined from previous presentations to incorporate stakeholder input. D. Amendment #6 to the FY 14-18 Transportation Improvement Program FDOT has requested approval of Amendment #6 (FM 229896-1), Beeline Hwy/SR 710 from W of Australian Ave to Old Dixie Hwy, which seeks to increase ROW funding by $1.3M and add $150K for PE in FY 14. The TAC requested further information relative to the increase in ROW funding. FDOT responded that the amendment is primarily required to add the PE phase and that increase in costs for ROW is due to requirements to update appraisals for court proceedings. The original ROW total was based on older now outdated appraisals. 3. INFORMATION ITEMS A. 2040 Long Range Transportation Plan Update 1. LRTP Survey Results Summary LCE will present a summary of the survey responses to date and the aggregated input to be considered in the LRTP update. 2. Cost Feasible Plan Development LCE will present a summary of the revenues available to be programmed and the approach to prioritizing projects for inclusion in the 2040 Cost Feasible Plan. B. FY 15-19 Transportation Improvement Program - First Reading Attached is the FY 15-19 Transportation Improvement Program (TIP) for Palm Beach County. This program was developed based on information provided from FDOT and various local sources and includes transportation projects funded by federal, state and local sources for all modes of transportation. The program reflects current revenue expectations in the coming years from the latest State Revenue Estimating Conference. Attached is a draft of the TIP. The list includes phases and funding sources by year for each project. This information will be incorporated into the TIP to be distributed for review and public comment prior to adoption by the MPO after a public meeting on June 19. C. All Aboard Florida Update - US DOT On-site Engineering Field Report The Federal Railroad Administration has published Part 1 of their diagnostic field review and safety improvement recommendations for the FEC rail corridor from Miami-Dade to St Lucie Counties. The FRA evaluation notes the AAF commitment to provide constant warning time at all crossings and also highlights general safety recommendations for pedestrian gates and vehicle presence detection systems. Finally, the report identifies specific recommendations for safety improvements within the portion of the corridor seeking a proposed maximum train speed of 110 mph (i.e. the “sealed corridor”). The report is attached. At the April 17, 2014 MPO Board meeting, the MPO Board unanimously voted to endorse the recommendations of the FRA evaluation. D. TIGER VI Discretionary Grant Application – Florida East Coast Railway Crossing Safety Improvements On April 28, 2014, the Palm Beach and Broward MPOs jointly submitted the attached TIGER grant application to the US DOT. The project will implement safety improvements at 176 railroad crossings in Broward and Palm Beach counties. The improvements will include four-quadrant (quad) gates, raised medians, pedestrian access management, interconnected traffic signals and other safety enhancements consistent with Federal Railroad Administration (FRA) recommendations to maximize safety. The application identified a total project cost of $40,550,000 with a funding request of $20,275,000. E. Summary Points from April 17, 2014 MPO Board 4. ADMINISTRATIVE ITEMS A. Member Comments B. Next Meeting – June 4, 2014 C. MOTION TO ADJOURN q:\mpo\renee\cac agendas,minutes, attendance, quorum sheet & correspondence\cac agendas\cac agendas 2014\cac agenda 5-7- 14.doc NOTICE In accordance with Section 286.0105, Florida Statues, if a person decides to appeal any decision made by the board, agency, or commission with respect to any matter considered at such meeting or hearing, he or she will need a record of the proceedings, and that, for such purposes, he or she may need to ensure that a verbatim record of the proceedings is made, which record includes the testimony and evidence upon which the appeal is to be based. Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. Persons who require special accommodations under the Americans with Disabilities Act or persons who require translation services for a meeting (free of charge), please call 561-684- 4143 or send email to [email protected] at least five business days in advance. Hearing impaired individuals are requested to telephone the Florida Relay System at #711. PALM BEACH METROPOLITAN PLANNING ORGANIZATION th 2300 N. Jog Rd., 4 .Floor, West Palm Beach, Florida 33411-2749 Phone 561.684.4170 Fax 561.242-7165 www.PalmBeachMPO.org MINUTES CITIZENS ADVISORY COMMITTEE MEETING Wednesday, April 2, 2014 – 1:30 P.M. Vista Center 4th Floor Conference Room 4E-12 2300 North Jog Road West Palm Beach, Florida AGENDA 1. REGULAR ITEMS A. Roll Call B. Motion to Adopt Agenda for April 2, 2014 C. Motion to Approve Minutes for March 5, 2014 D. Comments from the Chair E. Executive Director’s Report F. General Public Comments and Comments on Agenda Items 2. ACTION ITEMS A. Motion to Recommend Approval of Amendments to the FY 14-18 Transportation Improvement Program 1) Amendment #5 (FM 4293391) Turnpike All Electronic Tolling from I-595 to S of Lantana Toll Plaza: Postpone CST from FY 14-15 to FY 18 and increase funding by $9.1M 2) Amendment #6 (FM 2298961) Beeline Hwy/SR 710 from W of Australian Ave to Old Dixie Hwy: Increase ROW funding by $1.3M and add $150K for PE in FY 14 3) Amendment #7 (FM4193452) Southern Blvd/SR 80 from Lion County Safari to Crestwood/Forest Hill Blvd: Postpone ROW from FY 14 to FY 14-17 and decrease funding by $510K 4) Amendment #8 (FM 4132651) I-95 at Central Blvd/PGA Blvd: Create $56K for PE phase in FY 14 MINUTES OF THE CITIZENS ADVISORY COMMITTEE MEETING April 2, 2014 Page 2 3. INFORMATION ITEMS A. 2040 Long Range Transportation Plan – Preliminary Needs Plan 1) Transit and Freight Desires Plan 2) Project Funding Categories 3) Urban Interchange Analysis B. I-95 Glades Road and Spanish River Boulevard C. Approved Citizens Advisory Committee Bylaws D. Summary Points from March 20, 2014 MPO Board 4. AMINISTRATIVE ITEMS A. Member Comments B. Next Meeting – May 7, 2014 C. Motion to Adjourn MINUTES OF THE CITIZENS ADVISORY COMMITTEE MEETING April 2, 2014 Page 3 CITIZENS ADVISORY COMMITTEE ATTENDANCE 2013/2014 Representative/Alternate May Jun Jul

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    318 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us