Crossborder Tramwayline Strasbourg (FR) – Kehl (DE)

Crossborder Tramwayline Strasbourg (FR) – Kehl (DE)

Crossborder tramwayline Strasbourg (FR) – Kehl (DE) 25 octobre 2017 / Merida Jean-Baptiste SCHIBER Boosting Growth and Cohesion Eurométropole de Strasbourg In EU Border Regions Direction des Relations Européennes et Internationales 25 oct 2017 - Merida (33) 03 68 98 74 15 / [email protected] A core point of the franco-german CBC Despite of unequal sizes and economic trends, both cities Eurométropole have developped several de Strasbourg 490.000 inhab projects and close relations at different levels 4 bridges Kehl 35.000 inhab 2 Historical background and stakes Political and symbolic decisions 9 Building a crossborder metropolis following bilateral projects (Two banks garden, busline) 9 Crossborder functionnal area with benefits for both sides 9 Strong political engagement for the reconstruction of the tramway network Urban perspectives 9 Integration of the priority quarter of the « Port du Rhin » 9 Urbanisation of the Two Banks area - housing / firms / harbor 9 Definition of a coordinated transportation and mobility plan 3 A « back to the future » story 1897-1918 / 1942-1944 28-30 April 2017 1945 4 Tramline as spine for urban development Extension of the line D in two steps : - 2017 : 4 more stations until Kehl train station (2,7 km / 14 min) - 2018 : 2 more stations until Kehl City hall 5 Main questions and obstacles Technical Legal 9 Circulation of a French tram in a 9 Adaptation of the equipment of a foreign country tram (light, wheels, extinctor..) 9 Public consultation on the 9 Mixing of signalisation for road German side ? and tram trafic 9 Statute of equipements : bridge, 9 Installation of travel ticket tram platform, ticket machines.. machines with mixed systems 9 Recognition of travel tickets 9 Responsabilities for security matters during CB travels Financial Administrative 9 Coordination of budget circuits 9 Coordination of public certification 9 Which cost-sharing ? for the circulation of trams 9 Conditionality of the support 9 Project management of the CB through ministries segment (bridge and tram) 9 Separate tariffication and travel 9 Maintenance of equipments, railways tickets and other lines of the bridge 9 Distribution of ticket sellings 9 Role of EGTC Strasbourg-Ortenau ? 6 Legal basis and conventional procedures Intergov and national provisions Bilateral and local agreements 9 Karlsruhe Agreement (FR, DE, 9 Memorandum of understanding (2009) CH, Lux) of 1996 on CBC about pre-feasability, financing studies, between local authorities and project management (Eurométropole / public local bodies Kehl) 9 Framework Convention (2012) about 9 Freiburg/Breisgau Agreement construction programmes, financing, (FR, DE) of 2001 about the maintenance, implementation and building and maintenance of operation procedures (Eurométropole / bridges over the Rhine Kehl) 9 Convention on the joint tariffication 9 National legal provisions for (2016) Eurométropole / Kehl / regional public investment in transportation public companies transportation projects 9 Convention (2016) about the financial (sustainability, technical, operation of the Line D (Eurométropole financial support, approvals..) and Kehl transportation companies) 7 8 Organisational framework for construction Eurométropole : CBC Convention City of KEHL Transport Authority 2012 Delegation of Contract project management Kehl-CTS Compagnie des Transports Strasbourgeois CTS (Strasbourg’s Transportation Public Company) Technical Technical coordinator Consortium of undertaking coordinator (FR side) Conception – Construction (DE side) (CB Bridge) Firms Firms Firms Rhine Bridge France Germany Project costs and budget GlobalEn M€HT, valeur janviercosts 2010 of the extension : 105 Mio € French side 75% / German side 25 % CBC Costs : 40 Mio€ 17 Mio€ 23 Mio€ Port-du-Rhin Kehl Bahnhof 563 m BRIDGE (24 Mio€) 362 m 9 Bridge (50%) 9 Bridge (50%) 9 Tramline to border 9 Tramline to station 9 Relocation of networks 9 Tramway platform 9 Relocation of networks + 10% related costs : staff, legal + 10-15% related costs : legal support, support, equipment of trams, operation deficit, communication, procedures (studies, tendering..) additionnal tram, procedures Eurométropole German Ministry of Transports Budget French Ministry Land Bade-Wurtemberg Partners CTS Kehl Departement 67 Eurodistrict 9 First conclusions Popular success High occupancy Technical Achievement Controlled budget and schedule High developement potential Combination of systems instead of integration Significant overcosts / what if ECBC ? Low investment capacities afterwards 10 Thanks very much for your attention Jean-Baptiste SCHIBER Eurométropole de Strasbourg Direction des Relations Européennes et Internationales (33) 03 68 98 74 15 / [email protected] 11 Forthcoming extension to the City Hall of Kehl 2018 12.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    12 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us