Construction of Operations Building, at CFS Alert. Military Engineer Involvement in Northern Construction by Ueutenant-Colonel D. V.B. Riddell wherever and whenever the need arose. They played an important part Introduction in constructing and maintaining many emergency landing fields, Throughout our Canadian history military construction engineers buildings and associated physical plant along the Alaska highway. After have contributed not only to our successes in the World War I and II the war and into the 1960s, airfield and building work was carried out and in Korea but also to the national development of our country, par­ at many locations such as Kittigazuit, Sawill Bay, Cambridge Bay, Baker ticularly in the North. One unit which was developed as a result of war­ time activities in World War II and still exists today, is 1 Construction Engineering Unit (1CEU). Geographically 1 CEU has been employed coast to coast, heavily in the North and throughout the world in Con­ tinental Europe, Cyprus, Bermuda and in the Middle East. This is an almost completely military unit which has over the past 25 years involved most Canadian Forces construction engineers who have either been directly employed in the unit or have been employed as augmentation to the unit. This military unit typifies the capabilities and contributions of military construction engineers to northern development. Aim This paper is intended to briefly outline 1 CEU's and military engineers' involvement in construction activities in Northern Canada and to address design criteria used in northern construction. Early Activities The genesis of 1 CEU was from the Royal Canadian Air Force (RCAF). The RCAF Construction and Maintenance Units (CMUs) were established in 1942, in response to rapidly expanding construction and maintenance work required during World War II. The CMUs developed a capability to do all types of construction and maintenance work, Model ofCFS Alert for snow testing. 16 SSAC BULLETIN 2:88 Supply warehouse under construction at CFS Alert, N. W.T. Lake, lnuvik, Resolute Bay and Alert. During the postwar period the a challenge to 1 CEU for the last 10-15 years. The original 1950s buildings CMUs were slowly disbanded. Eventually 1 CEU was created in 1962, built by 2 CMU were outdated structures, of temporary construction, from the remaining components and the work continued throughout the energy inefficient and required replacement. As a result, a program of North. reconstruction and modernization was undertaken in the early 1970s. The design principles which were adopted for the projects are the Northern projects which employed military units (both combat following: engineer regiments and 1 CEU) in the 1970s included the construction of six arctic airfields at Pond Inlet, Whale Cove, Spence Bay, Eskimo Material and construction equipment must be transportable by C-140 Point, Cape Dorset and Pangnirtung, as well as the Eagle River and Hercules aircraft; everything is moved into Alert by aircraft. Ogilvie River bridges in the Yudon. These experiences from the past have The facilities must be designed to meet the operational requirement. been used for current projects in Alert and on the new North Warning The facilities must be simple to maintain since operations and System. maintenance tradesmen change every six months. Designs must address the extreme climatic conditions and must be Alert Reconstruction energy effecient as every litre of fuel is flown into the site. particular attention is also paid to window, door and roofing details. The reconstruction of the world's northermost permanently mann­ The complete facility must be easily and quickly constructed due to ed settlement-Alert, on the northern tip of Ellesmere Island has been tl1e short construction season (June to September.) Reliability of the facilities and systems is paramount owing to the logistics backup for the site being located in Trenton, Ontario, some 4200 kilometres to the South. The permafrost soil in Alert is a silty shaley material with low organic content and some ice lenses; the active layer is not more than 45 em (18 in) thick. It is normal procedure to install foundations in one year and after stabilization construct the buildings the following year. Depending on the loading conditions a wide variety of foundation designs have been employed including ventilated fills of various types. Thermisters have been installed in most fill foundations to confirm that the permafrost is not melting. Thermal syphons have also been used as well as other foundations such as wooden or steel piles. The buildings are normally of the pre-engineered steel structure type which reduce the time needed for construction. Additionally, the com­ ponents have to be small enough to fit into a Hercules aircraft. R values exceed R30 in all cases and thermal bridging must be eliminated to pro­ tect both building components and the permafrost. For the largest building constructed in Alert, urethane walk-in freezer panels were us­ ed for the walls and roof. This 60 x 25 metre, $12 million headquarters and personnel services building for the station became a walk-in freezer Snow model testing for CFS Alert. in reverse. 17 .;--~s~~if~·~;~~i:A ~ > - · ~ · ,_ / _ . ~ ' Conceptual sketch for the Short Range Radar Site. North American Air Defence rently heated by heat recovery from the dieseals. The introduction of this system achieved substantial energy savings. All building systems Modernization Project are interconnected for redundancy and simple controls have been in­ As a result of an agreement struck by Prime Minister Mulroney and stalled to ensure rapid repair in the case of failure. The water supply President Reagan at the Shamrock Summit, the Department of National system is on continuous circulation and temperature sensors activate Defence has been committed with the United States Air Force to par­ heating tapes on the pipes as necessary. The water, sewage and fuel pip­ ing is primarily aluminum to reduce the weight for air shipment. Power ticipate in the North American Air Defence Modernization Project. This project involves: the creation of forward operating locations for the CF distribution cables are normally laid on the ground surface. 18 fighter aircraft at selected airfields in the North; the upgrading and The work over the last 15 years at Alert has resulted in the reconstruc­ conversion of 11 of the existing Distant Early Warning (DEW) Line tion of a large portion of the station at a cost in excess of $30 million. System stations into manned long-range radar sites; the construction of These costs do not include the equipment, fuel and transportation costs three new long-range radar sites; and the construction of 36 unmanned associated with moving 700 tons of construction material each year. The short-range radar sites between them. 1 CEU has been tasked as the work has been done almost completely by military tradesmen. The scope design manager for the 36 ·unmanned short-range radar sites and a pro­ of this project and the limited military engineer manpower in the Cana­ totype facility at North Bay, Ontario. The criteria developed from the dian Forces has resulted in most engineer tradesmen having spent two experiences in Alert are being used in the design of the short-range radar months or more in Alert. 0 sites which will have a 15 to 30 metre radar tower with an eight metre dome mounted on top. The site building will house the power plant, elec­ tronic equipment, shelter, workshop and computer controllers. There will also be satellite ground terminals and a transient shelter. Much of the design and construction work will be tendered to contract for the Department of National Defence by Defence Construction Canada (DCC) from Ottawa. The peacetime construction activities described in this article in­ dicate the work that can and has been done by military engineers, in­ cluding those of 1 Construction Engineering Unit for the Department of National Defence and other departments. All of the work in the harsh northern environment has helped in preparation for wartime activities yet has been useful in developing the North. Military construction engineers have proven their ability to operate in the north and have made a substantial contribution to the engineer­ ing and development of infrastructure throughout the North. The military engineers provide a tried and tested vehicle for the execution of new construction technology in the far North. With respect to utilities, a high degree of consideration has been plac­ ed on reliability and energy conservation because all power is diesel generated and the oil has to be flown in. A number of buildings are cur- Short Range Radar Prototype under construction at North Bay, Ontario. 18 SSAC BULLETIN 2:88 .
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages3 Page
-
File Size-