Finsbury Park Station Step-Free Access UNITED KINGDOM

Finsbury Park Station Step-Free Access UNITED KINGDOM

Finsbury Park Station Step-Free Access UNITED KINGDOM PROJECT OF THE YEAR INCLUDING RENOVATION (UP TO €50M) MICHAEL NARDONE, PG VICE PRESIDENT AMERICAS 18TH NOVEMBER 2019 Miami, USA 18th November 2019 Authored by Ben Ablett Finsbury Park Station Step-Free Access – United Kingdom Project Summary Challenges Solutions, Sustainability & Safety Achievements Miami, USA 18th November 2019 Finsbury Park Station Step-Free Access – United Kingdom A $25M project with multiple challenges and complexities • Project constructed safely while maintaining all station operations • Holistic Integrated approach temporary and permanent works and construction methodology • Design Innovation solutions utilising Hand Mining techniques • Maintaining and adapting existing assets • Controlling ground movement using discrete excavations and support systems. Miami, USA 18th November 2019 PROJECT SUMMARY Finsbury Park Station Step-Free Access – United Kingdom Bus Station (Wells Terrace) Lift Shaft 1 Worksite Lift Shaft 3 Bus Station Worksite (Station Place) Miami, USA 18th November 2019 PROJECT SUMMARY Finsbury Park Station Step-Free Access – United Kingdom Lift Shaft 2 (Unrealised) Lift Shaft 3 Works Lift Shaft 1 Works Miami, USA 18th November 2019 PROJECT SUMMARY Finsbury Park Station Step-Free Access – United Kingdom Passageway 4 Works Lift Shaft 3 Works Lift Shaft 1 Works • Two new lift shafts and stair structures Underground • Passageway extension Platform Tunnels • New openings into existing passages • Demolition of existing stairs Miami, USA 18th November 2019 PROJECT SUMMARY Finsbury Park Station Step-Free Access – United Kingdom Miami, USA 18th November 2019 CHALLENGES Finsbury Park Station Step-Free Access – United Kingdom Lift Shaft 1 Works Lift Shaft 3 Works Miami, USA 18th November 2019 CHALLENGES Finsbury Park Station Step-Free Access – United Kingdom Western Station Entrance (constructed by Passageway 4 others) Extension Lift Shaft 1 Works Lift Shaft 3 Works Miami, USA 18th November 2019 CHALLENGES Finsbury Park Station Step-Free Access – United Kingdom Western Station Entrance (constructed by Passageway 4 others) Extension Masonry Support Innovation(s) Lift Shaft 1 Works Lift Shaft 3 Works Miami, USA 18th November 2019 CHALLENGES Finsbury Park Station Step-Free Access – United Kingdom Western Station Entrance (constructed by Passageway 4 others) Extension Masonry Support Innovation(s) Passageway 4 Underpinning Lift Shaft 1 Works Lift Shaft 3 Works Miami, USA 18th November 2019 CHALLENGES Finsbury Park Station Step-Free Access – United Kingdom Miami, USA 18th November 2019 SOLUTIONS Finsbury Park Station Step-Free Access – United Kingdom Hand Mining was the only pragmatic solution: • Obviously safety critical environment • Complex sequential excavation and support methodology was most effective approach • Quick and adaptive in resolving unexpected in-ground conditions • Inherently adaptive for working adjacent to legacy assets Miami, USA 18th November 2019 SOLUTIONS Finsbury Park Station Step-Free Access – United Kingdom PHASE 1 Permanent Works Above Platform works PHASE 5 PHASE 2 PHASE 6 PHASE 3 • Small, discrete sequential excavations • Immediate introduction of support • Safe, controlled ground movements • >100 detailed staged operations PHASE 4 Miami, USA 18th November 2019 SOLUTIONS & SAFETY Finsbury Park Station Step-Free Access – United Kingdom Lift Shaft 3 Temporary Works Plan (Platform Level) • Temporary works were detailed for flexibility, simplicity, speed & safety • Holistic approach allowed recovery of temporary works members for re-use Miami, USA 18th November 2019 SOLUTIONS & SUSTAINABILITY Finsbury Park Station Step-Free Access – United Kingdom Track Slabs Stacked Permanent Works Passageway 4 Headings Extension (Passageway 4) Internal Fit Out • Reduced risk, ability to control and minimise ground movements • Excavation between and under the Overground and next to the Underground lines • Safe operational continuity, track slabs undermined with stacked headings Miami, USA 18th November 2019 SOLUTIONS & SAFETY Finsbury Park Station Step-Free Access – United Kingdom TRACK SLAB INSTALLATION Example of actual Network Rail track movement versus predicted values Predicted movement and extent of damage assessed at the following locations: 1. NR Tracks 2. NR Platforms 3. NR Underground Structures 4. LU Platform Tunnels and Tracks 5. LU Underground Structures Miami, USA 18th November 2019 SOLUTIONS & SAFETY Finsbury Park Station Step-Free Access – United Kingdom • Steel pile installation (for main pit) & track slabs installed during early Plan possession • All other works carried out while all lines remained operational • Goods Rail Line utilized to transport spoils to staging area and import construction materials Section Miami, USA 18th November 2019 SOLUTIONS Finsbury Park Station Step-Free Access – United Kingdom Permanent works installed between the stacked headings, below the track slabs, carrying live rail loads during construction Miami, USA 18th November 2019 ACHIEVEMENTS Finsbury Park Station Step-Free Access – United Kingdom TEMPORARY PERMANENT CONDITION CONDITION • Allowed constant rail operation throughout the works • Cost-effective and less intrusive method to form the connection. • Reduced the risk of damaging the existing Assets • Less temporary works were necessary • Successfully implemented and utilised in several locations Miami, USA 18th November 2019 SOLUTIONS Finsbury Park Station Step-Free Access – United Kingdom Upper Lift Lobby PERMANENT CONDITION Existing Passageway 4 London Underground Line TEMPORARY CONDITION Lower Lift Lobby LIFT SHAFT 3 INTERFACE WORKS Existing Cross Passageway 2/203 Miami, USA 18th November 2019 SOLUTIONS Finsbury Park Station Step-Free Access – United Kingdom Innovative temporary & permanent masonry tunnel support shown in temporary support condition prior to formation of new opening Miami, USA 18th November 2019 ACHIEVEMENTS Finsbury Park Station Step-Free Access – United Kingdom Underpinning of distressed dis-used passageway between the two Underground Platform tunnels to allow new opening and undermining to form a new access to new lift shaft Miami, USA 18th November 2019 ACHIEVEMENTS Finsbury Park Station Step-Free Access – United Kingdom Miami, USA 18th November 2019 ACHIEVEMENTS.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    24 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us