ZAMBOANGA PENINSULA PRIORITY PROGRAMS AND PROJECTS FOR RESOURCE MOBILIZATION December 2015 FOREWORD This document is the output of the Regional Development Council (RDC) IX Secretariat’s effort to push the development of the region by facilitating the identifi cation of the priority interventions that need the support of donor agencies, policymakers, particularly the region’s congressional representatives, national government agencies, and the Mindanao Development Authority. It is largely based on the submissions of ZamPen’s regional line agencies and local government units. Following a set of RDC-approved criteria, the projects identifi ed shall sail the region towards its vision of becoming the Southern Agri-Fisheries Corridor of the Philippines. This portfolio is anticipated to jumpstart resource mobilization as it equips a potential investor with the details of the region’s priority programs/projects. It shall be a living document, which needs periodic updating and monitoring. The continued concerted efforts among the RDC IX sectoral committee members and the Council itself are therefore fervently sought, in pursuit of regional development. Together as one region, we build a better Zamboanga Peninsula! The RDC IX Secretariat Table of Contents Title Page Background 1 Overview of the ZamPen Priority Programs and Projects for 2 Resource Mobilization Agri-Fishery Development Projects 3 Integrated Rice-Duck Farming, Processing and Marketing 5 Duck Meat Processing and Marketing Project 7 Organic Rice Post-Harvest Processing Facilities 9 Organic Cassava Production and Organic Fertilizer Development Project 11 Establishment of Organic Fertilizer Manufacturing Facility 14 Integrated Development Project for Abaca 16 Rehabilitation/Improvement of Farm-to-Market Road at Sitio Quatro Ojos (West 18 Basilan and Sta. Fe), Barangay Vitali, Zamboanga City Integrated Fisheries Development and Livelihood Program 20 Coastal Resource Management Program 23 Rehabilitation of Zamboanga Fish Port Complex 25 Integrated Fishport Development 27 Establishment of the National Seaweeds Center 29 Rehabilitation of Liquid Nitrogen Facility 31 Construction of “AAA” Slaughterhouse 33 Infrastructure Development Projects 35 Rehabilitation/Construction & Concreting of NJR Brgy. Nemenio-Muraji- 39 Tagaytay-Dawa Road Project (Road leading to Salug Daku Mini-Hydro Power Project Conduct of Feasibility Study and Construction of Dipolog-Ipil-Zamboanga 41 City (DIZ) Railway System Project Transfer of Zamboanga International Airport 43 Development of Ipil Airport 45 ZAMBOECOZONE World Class International Seaport 47 Development of Ipil Seaport 49 Dapitan Port Development Project 51 Lapuyan Port Development Project 53 Conduct of Feasibility Study for the Development and Operation of Three Mini- 55 Hydro Power Plants Feasibility Study for the Establishment of a Water Impounding Dam 57 Construction of Flood Control Structure (Revetment Wall) along Sibuguey River 62 Construction of Salug Daku Flood Control 64 Construction of River Control at Aguada River 66 Construction of Flood Control (Revetment) along Kipit River 68 Construction/Extension of Flood Control Structure (Revetment) along 70 Dapitan River Dipolog River Flood Control Development Project 72 Construction of Sibuguey River Flood Control (Phase II) 74 Construction/Extension of Flood Control Structure of Dohinob River 76 Construction/Extension of Flood Control Structure along San Jose Gusu Creek 77 Table of Contents Construction of Flood Control Structure (Revetment Wall) along Sibuguey River - 79 Phase I (CY 2018) Construction of Flood Control Structure (Revetment Wall) along Sibuguey River 81 (CY 2019) Construction of Flood Control Structure (Revetment Wall) along Sibuguey River 83 (Phase II) (CY 2020) Construction of Sanito River Flood Control (CY 2020) 85 Construction of Flood Control Structure along Kabasalan River (CY 2019) 86 Construction of Flood Control Project from Veterans Village to Don Andres 87 (CY 2020) Construction of Flood Control Project (CY 2018) 88 Construction of River Control/ Mega Dikes Along Labangan River (CY 2019) 89 Construction of Flood Control Structure Along Usugan River (Phase II) (CY 2020) 90 Construction/Improvement/Rehabilitation/Repair of Sibuguey River Flood 92 Control (Phase II) (CY 2018) Construction of Damit Flood Control Project 94 Construction of Protective Seawalls (CY 2020) 96 Construction/Extension of Flood Control Structure along the left bank of Disakan 97 River (Upstream) (CY 2018) Construction/Extension of Flood Control Structure (CY 2019) 99 Construction/Extension of Seawall/River Control (CY 2020) 100 Construction of Seawall (CY 2018) 101 Construction of River Control (CY 2019) 102 Construction of River Control (CY 2020) 103 Construction/Extension of Flood Control Structure (Revetment) along Dipolog 104 River (CY 2018) Construction/Extension of Flood Control Structure (Revetment) along Dapitan 106 River (CY 2019) Construction/Extension of Flood Control Structure (Revetment) along Dapitan 107 River (CY 2020) Construction of Flood Control (Revetment) (CY 2018) 108 Construction of Flood Control (Revetment) at Lunot Bridge (CY 2019) 110 Construction of Flood Control (Revetment) at Balagtasan Bridge (CY 2020) 112 Construction of Flood Control Structure at Labuan River (CY 2018) 113 Construction of Flood Control Structure at Ayala River, Tulungatung Section 115 (CY 2019) Construction of Flood Control Structure at Vitali River (CY 2020) 117 Environmental Protection Projects 119 Natural Resource Protection and Diversifi ed Development Program 120 Waste-To-Energy Facility Project 124 Health Development Project 127 Western Mindanao Drug Abuse Treatment and Rehabilitation Center (DATRC) 128 Peace and Security Projects 131 Regional Integrated Radio-Based Communication System 132 Halfway House in Zamboanga Peninsula 134 Background The Regional Development Investment During the said meeting, Mayor Evelyn T. Uy Program (RDIP) is the accompanying of Dipolog City suggested to expand the list document of the Regional Development of projects to include the priority projects of Plan (RDP). The RDIP translates the RDP into the LGUs. Following the agreement of the programs, projects, and activities (PPAs) Council, the RDC IX Secretariat requested that need to be implemented to realize inputs from the LGUs. the region’s vision, goals and objectives. For Zamboanga Peninsula, these PPAs are Additional projects were therefore identifi ed expected to contribute to the region’s and were subsequently endorsed by the vision of becoming the country’s Southern Council during its 151st RDC IX Regular Agri-Fisheries Corridor in line with the set of Meeting in Zamboanga City. The Council intermediate outcomes prescribed in the passed RDC IX Resolution No. 033, series Plan. The region’s RDP and RDIP have of 2015, “A Resolution Approving the already been updated, covering the Second Batch of Priority Programs/Projects period 2014-2016. of Zamboanga Peninsula for Resource Mobilization and Endorsing the Same It may be noted that there are numerous to Concerned Implementing Agencies programs and projects proposed by for Inclusion in their Respective Priority various implementing agencies, all in Investment Programs.” the pursuit of the region’s vision. Given the scarce resources, there is a need to Also, aside from these (Batches 1 and prioritize these projects. The projects that 2) projects, RDC IX, through its Regional must be implemented if ZamPen’s vision Project Monitoring Committee and were to be attained need to be assured Infrastructure Development Committee, of funding and institutional support. found the need to prioritize fl ood control Hence, during its 148th Regular Meeting, projects in the region. These projects are Regional Development Council (RDC) IX also seen to be in consonance with the passed Resolution No. IX-063-14 entitled scope and purpose of identifying ZamPen “A Resolution Approving the Terms-of- Priority Programs and Projects for Resource Reference (TOR) for the Selection of Mobilization (Batches 1 and 2), hence, the Priority Programs/Projects of Zamboanga profi les of the major fl ood control projects in Peninsula.” Zamboanga Peninsula are likewise included in this document. The said RDC-approved TOR was used by the Sectoral Committees (SecComs) of RDC IX in the determination and evaluation of their respective sectoral priority programs and projects as presented during the 4th quarter 2014 SecCom Meetings held between November 18 and 27, 2014. During its 149th Regular Meeting, RDC IX has confi rmed the priority programs/ projects of Zamboanga Peninsula through RDC IX Resolution No. IX-086-14 entitled “A Resolution Approving the Priority Programs/ Projects of Zamboanga Peninsula for Resource Mobilization and Endorsing the Same to Concerned Implementing Agencies for Inclusion in Their Respective Priority Investment Programs.” Zamboanga Peninsula Priority Programs and Projects for Resource Mobilization |1 Overview of the Priority Programs and Projects for Resource Mobilization Regional Development Council IX About 82.19% of the total cost is for confi rmed a total of 67 priority projects infrastructure projects or P24.52 billion. for resource mobilization; 48 of which are Environmental protection projects cost infrastructure development projects, 14 P3.001billion and agri-fi shery development are agri-fi shery projects, 2 are projects for projects, P1.95 billion. The only health environmental protection, 2 projects for project, the proposed establishment of peace and security, and 1
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages142 Page
-
File Size-