SPACE SHUTTLE MISSIONS SUMMARY Page 186 - STS-122/1E

SPACE SHUTTLE MISSIONS SUMMARY Page 186 - STS-122/1E

Revision T, PCN-2 August 2009 SPACE SHUTTLE MISSIONS SUMMARY Page 186 - STS-122/1E LANDING SITE/ SSME-TL CREW LAUNCH SITE, RUNWAY, NOM-ABORT SRB ORBIT PAYLOAD MISSION HIGHLIGHTS (6+1 UP/6+1 DN) FLT ORBITER LIFTOFF TIME, CROSSRANGE EMERG RSRM FSW WEIGHTS, (LAUNCH SCRUBS/DELAYS, NO. LANDING SITES, LANDING THROTTLE AND INC HA/HP PAYLOADS/ TAL WEATHER, ASCENT I-LOADS, TITLE, NAMES, ABORT TIMES TIMES PROFILE ET EXPERIMENTS FIRSTS, SIGNIFICANT ANOMALIES, ETC.) & EVA'S FLT DURATION, ENG. S.N. WINDS Revision T, PCN-2 August 2009 SPACE SHUTTLE MISSIONS SUMMARY Page 186 - STS-122/1E STS- OV-104 CDR: KSC 39A KSC 15 (KSC 104/104/109 BI-132 51. DIRECT OI- CARGO: BRIEF MISSION SUMMARY: STS-122/1E 122/ (Flight 29) Stephen N. Frick 038:19:45:30Z 67) % 6 INSERTION 32 40296 LBS (24th ISS mission) delivered the European ISS 1E ATLANTIS (Flt 2 - STS-110) 2:45:30 PM EST 051:14:07:09Z RSRM (24) (2) Space Agency’s Columbus research (P) 9:07 AM EST PREDICTED: 99 POST OMS- PAYLOAD laboratory module to the ISS. Columbus, SEQ OMS P748/R276/V192/M2 2:45:30 PM EST Thursday (11) 100/104.5/ 2: CHARGEABLE: measuring 23 ft in length and 15 ft in FLT# 121 PODS: 42 (A) 02/21/08 (7) 104.5/72/ ET-125 124.0X118. 32941 LBS diameter, is ESA’s largest contribution to LPO4-29 Tuesday (35) 104.5 8 NM the expansion of the ISS. Also delivered PLT: 2/07/08 (9) DEORBIT SLWT DEPLOYED: KSC-121 RPO1-36 BURN: ACTUAL: 29 were ESA experiments and two ESA Alan G. Poindexter 30657 LBS astronauts with one of them to join the FRC4-29 P749/R318/M274 LAUNCH 051:12:59:52.0 100/104.5/ PAD 39A- WINDOW: Z 104.5/74/ ISS crew for operation of Columbus NON- 44 MS 1/R: 5M1S 104.5 research. This mission also saw the Leland D. Melvin (PLT IN-PLANE) XRANGE: 408 ET DEPLOYED: Columbus Control Center in MLP-1 P750/R319/M275 NM 1 = 2059 (2) IMPACT 2162 LBS Oberpfaffenhofen, near Munich, EOM PLS: KSC 2 = 2052 (6) Germany, brought on-line for initial 24TH MS 2/EV1: TAL: ZZA ORBIT DIR: A/L 3 = 2057 (3) MET MIDDECK: checkout and future operations of the SHUTTLE Rex J. Walheim TAL WX: MRN, 38 1:14:07 122 LBS laboratory. FLIGHT (Flt 2 - STS-110) BEN TO ISS AIM PT: LAT: SHUTTLE KSC W/D: OPF: 121, VAB HB-3: 7, PAD A: 76 = P751/R277/V193/M24 NOMINAL 36.619 ACCUMULATE 204 Total Work Days (+1 holiday @ OPF 3 SELECTED: S D Processing + 10 holidays + 4 contingency days RTLS: KSC 15 MLGTD: 2344 WEIGHTS: @ PAD) MS 3/EV2: N/N FT LONG: DEPLOYED: Hans Schlegel TAL: ZZA 30L 051:14:07:09Z M 3 EOM: 158.79 DEORBIT: 1393585 LBS LAUNCH POSTPONEMENTS: (Germany) N/N VEL: 197 KGS 6W HA 187.6 - Added STS-122 to FDRD - launch date of (Flt 2 - STS-55) AOA: NOR 23 194 KEAS WEIGHT: NM 10/17/07 on 10/05/06. N/N HDOT: -2.1 FPS 207295 LBS HP 23.1 NON- - Postponed to 12/06/07 on 04/16/07 due to STS- DEPLOYED: P752/R163/V194/M1 1ST DAY PLS: NM 117 rollback. 43 EDW 04 N/N TD NORM 195: X CG: 1600348 LBS - After 12/06/07 scrub, see LAUNCH SCRUBS 2200 FT 1078.2 IN below, launch was reset for 24-hr turnaround MS 4/EV3: TDEL: ENTRY CARGO TOTAL: on Friday, 12/07/07. Stanley G. Love 0:000(P) DRAG CHUTE LANDING: VELOCITY: 3862333 LBS - Later, on 12/06/07, during MMT Scrub P753/R320/M276 0.212(A) DEPLOY: 25860 FPS Turnaround Meeting, it was decided to extend 188 KEAS WEIGHT: PERFORMANC to a 48-hr turnaround for Saturday, 12/08/07 MS 5 UP/EXP 16 FLT MAX Q NAV: 051:14:07:10Z 207215 LBS ENTRY E MARGINS launch to allow additional time to address all ENG: 756.21(P) RANGE: (LBS): concerns. Leopold Eyharts 755.17(A) NLGTD: 5175 X CG: 4403 NM FPR: 2651 - At Friday, 12/07/07 MMT, it was determined (ESA) FT 1080.4 IN FUEL BIAS: that necessary discussion could not be finished (also flew on MIR SRB STG: 051:14:07:17Z 1063 in time for Saturday 12/08/07 launch attempt. Feb 1998) 2:04.16(P) VEL: 157 KGS FINAL TDDP: The launch was moved to Sunday 12/09/07 P754/R321/M277 2:04.16(A) 155 KEAS with a new Launch Commit Criteria (for this HDOT: -4.9 2402 RECON: 3435 launch only) requiring four of four valid ECO MS 5 DN/EXP 16 FLT PERF: FPS sensor readings (rather than three of four) ENG: NOMINAL prior to launch. In addition, the following two Daniel M. Tani BRK INIT: 91 PAYLOADS: conditions were added: 1) Launch Window was (Flt 2 - STS-108, 2 ENG TAL KGS PLB: limited to in-plane +1 minute (to provide STS-120 up) (MRN): ISS 1E additional ascent fuel margin), and 2) 2:35(P) 2:38(A) DRAG CHUTE (COLUMBUS utilization of new in-flight ECO circuit voltage P755/R272/V191/M2 JETTISON: MODULE) readings (successfully tested on STS-118 and 38 NEG RETURN: 54 KGS ICC-LITE STS-120 by ground flight controllers to 3:51 3:54 051:14:07:46Z ECSH recommend manual engine shutdown by the SS EVA 114 PDGF crew, if required. PTA (U/S 161 DOCKED QUEST EVA BRK DECEL - After second scrub on 12/09/07, see LAUNCH FPS): MIDDECK: SCRUBS below, launch was rescheduled to NET 37 2 EMU/TETHERED EVA 5:04 5:05 FPS : ISS 1E 01/02/08 contingent on development and AVE 4.6 PK 6.9 MAUI implementation of fuel ECO sensor system 107 SE TAL (ZZA troubleshooting plan. SCHEDULED EVA 106 104): WHEELS STOP: - Postponed to 01/10/08 on 12/13/07 dependent DURATION 7:58 6:04 6:082 5 CRYO TK on resolution of the problem with the fuel 051:14:08:07Z S122-E-007873 (11 Feb. 2008) --- SETS 10911 FT Photographed from ISS, the station's sensor system. Slip was to allow “as many SS EVA 115 PTM (U/S 167 robotic Canadarm2 moves the Columbus people as possible to have time with family RMS 78 DOCKED QUEST EVA FPS): ROLLOUT: laboratory from Atlantis' payload bay to and friends at the time of year when it means 38 5:58 6:02 the most.” Tanking test using add-on Time 8567 FT ODS EMU/TETHERED EVA 58 SEC Domain Reflectivity (TDR) instrumentation on 108 Continued… OBSS 12/18/07 isolated ECO Sensor System failures SCHEDULED EVA 107 SSPTS to open circuit in the three-part “pass-through DURATION 6:45 connector.” TPS removal on the tank was Continued… authorized at the pad to begin moving toward removal of the hardware, if required, to solve Continued… the problem. Launch date remained unchanged. - Postponed to TBD on 01/03/08; however, PRCB Revision T, PCN-2 August 2009 SPACE SHUTTLE MISSIONS SUMMARY Page 186 - STS-122/1E Revision T, PCN-2 August 2009 SPACE SHUTTLE MISSIONS SUMMARY Page 187 - STS-122/1E LANDING SITE/ SSME-TL CREW LAUNCH SITE, RUNWAY, NOM-ABORT SRB ORBIT PAYLOAD MISSION HIGHLIGHTS (6+1 UP/6+1 DN) FLT ORBITER LIFTOFF TIME, CROSSRANGE EMERG RSRM FSW WEIGHTS, (LAUNCH SCRUBS/DELAYS, NO. LANDING SITES, LANDING THROTTLE AND INC HA/HP PAYLOADS/ TAL WEATHER, ASCENT I-LOADS, TITLE, NAMES, ABORT TIMES TIMES PROFILE ET EXPERIMENTS FIRSTS, SIGNIFICANT ANOMALIES, ETC.) & EVA'S FLT DURATION, ENG. S.N. WINDS STS- Continued… Continued... Continued... Continued... 122/ ISS 1E SS EVA 116 SE PRESS 104 WINDS: - New “work to” launch date of NET 02/07/08 DOCKED QUEST EVA 6:55 6:55 1.9T 0.6R KTS established on 01/14/08. Testing of removed Continued 39 OFFICIAL: ECO connector confirmed problem in the … EMU/TETHERED EVA MECO CMD: 31003P05 KTS connector. 109 8:22.9 8:22.8 5H 2L KTS - Officially postponed launch to 02/07/08 on SCHEDULED EVA 108 01/28/08. Slip was due to ECO sensor DURATION 7:25 VI: DENS ALT: problems experienced during December 25819 25818 77 FT launch attempt and implementation of ECO MCC WHITE FCR (51) sensor connector soldered mod. (Also, LCC OMS-2: FLT DURATION: went back to the standard three of four valid FLIGHT DIRECTORS: 37:46 37:40 12:18:21:39 ECO sensor readings.) SHUTTLE: 159.6 FPS158.1 ASC - N. D. Knight FPS S/T: LAUNCH SCRUBS: LD/O1 - M. L. Sarafin 1137:06:46:18 - Thursday, 12/06/07 launch attempt was O2 - A. J. Ceccacci terminated 2 hours into tanking when two of PLNG - P. F. Dye OV-104: four engine cutoff (ECO) low-level LH2 fuel ENT - B. C. Lunney 258:07:05:40 sensors failed wet/dry test. (The 5% sensor MOD - P. L. Engelauf also failed wet during drain-back.) The ECO DISTANCE: sensors are required for backup engine Team 4 - M. R. Abbott 5,296,842 sm shutdown command to avoid catastrophic ISS: failure in the event of early fuel depletion. LD/O2 - S. P. Davis TOTAL Launch was scrubbed at 8:56 am CST. O1 - R. C. Dempsey SHUTTLE Technical Scrub. O3 - J. R. Spencer DISTANCE: - Sunday, 12/09/07 launch attempt was Team 4 - K. L. 461,345,650 terminated when one of previously failed Alibaruho sm sensors failed again during tanking, a couple of IP FD - A.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    10 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us