CEN - Construction sector Snapshot of the current situation for Standards to be cited in the OJ under the 2015-04-03 Page 1 CPR 1. Introduction The objective of the CEN Construction Sector Snapshot is to provide standardizers and users of the standards with an overview of: - the draft standards developed by CEN and ECISS Technical Committees, which will be cited in the Official Journal under Regulation 305/2011; - the amendments and revisions of harmonized product standards (hEN) already cited in the OJEU. Priority is given to the 'market' vision of the Standard. Therefore, corrigenda, amendments or revisions are not totalized separately but in a group, which progress is measured according to the global progress for the purpose. The labels used in the different sections of the snapshot can be understood as follows: Generic part of a Standard reference without date or function (for Standard: more details see the 'linked work item' description). Title: English title of the (draft) standard Gives the unique CEN Work Item identification and, if existing, the the Linked Work Item: full Standard reference Gives the last registered (date of the Snapshot) evolution in major Last realized: steps (description and internal milestone numbering) for each Work Item Gives references and dates from the registered history in the Official OJEU: Journal from the European Commission. Date of withdrawal registered in the CEN database. There may be a DOW: difference with the dates cited in the OJEU (last minute change or registration time discrepancies). Gives a list of all mandates linked to the concerned Work Item (also Man: manadates which are not specifically linked to the CPR). Moreover, several acronyms, referring to the different steps of the approval process of a standard, areused to describe the last registered evolution (more information on each step can be found on the CENBOSS http://www.cen.eu/boss) and mean the following: - ENQ: Enquiry - FV: Formal Vote - UAP: Unique Acceptance Procedure - DOR: Date of Ratification - DAV: Date of Availability CEN - Construction sector Snapshot of the current situation for Standards to be cited in the OJ under the 2015-04-03 Page 2 CPR 2. Summary Concerned Standards 529 Approved ENs Available Standards cited in the Official Journal 431 Available Standards not yet cited in the Official Journal 28 Total available Standards 459 Drafts which have completed FV or UAP Adopted Standards not yet available (ratified included) 10 Drafts having failed the Formal Vote or UAP 1 Drafts under preparation for FV or UAP or undergoing FV or UAP Drafts undergoing Formal Vote or UAP 1 Drafts received in CEN-CENELEC Management Center for Formal Vote 4 preparation Drafts received in CEN-CENELEC Management Center for UAP preparation 2 Drafts before FV or UAP Drafts passed CEN Enquiry 24 Drafts undergoing CEN Enquiry 2 Drafts recieved in CEN-CENELEC Management Center for Enquiry preparation 2 Drafts not yet recieved in CEN-CENELEC Management Center for Enquiry or 24 UAP preparation CEN - Construction sector Snapshot of the current situation for Standards to be cited in the OJ under the 2015-04-03 Page 3 CPR Standard English title Linked Work Item Last Official DOW Man Realized Journal Approved Standards cited in the Official Journal Total: 431 EN 1 Flued oil stoves with EN 1:1998 2008-01-28 2007-12-04 1998-11-30 M/129 vaporizing burners CEN WI 00046003 Review 111 C 290 Milest. 90.93.0000 EN 1:1998/A1:2007 2008-01-28 2007-12-04 2009-01-31 M/129 CEN WI 00046004 Review 111 C 290 Milest. 90.93.0000 prEN 1 rev 2013-10-23 2015-09-09 M/129 CEN WI 00046008 Enquiry 111 Milest. 40.60.0000 EN 40-4 Lighting columns - Part 4: EN 40-4:2005 2005-12-07 2006-12-13 2007-08-31 M/111 Requirements for reinforced CEN WI 00050017 Finalization C 304 and prestressed concrete of standard lighting columns 121 Milest. 60.60.0000 EN 40-4:2005/AC:2006 2006-09-20 2006-12-13 M/111 CEN WI 00050C01 Finalization C 304 of AC 191 Milest. 60.60.0000 EN 40-5 Lighting columns - Part 5: EN 40-5:2002 2002-04-17 2002-09-06 2004-01-31 M/111 Requirements for steel CEN WI 00050015 Finalization C 212 lighting columns of standard 121 Milest. 60.60.0000 EN 40-6 Lighting columns - Part 6: EN 40-6:2002 2002-04-17 2002-09-06 2004-01-31 M/111 Requirements for aluminium CEN WI 00050016 Finalization C 212 lighting columns of standard 121 Milest. 60.60.0000 EN 40-7 Lighting columns - Part 7: EN 40-7:2002 2002-12-18 2003-07-16 2004-09-30 M/111 Requirements for fibre CEN WI 00050014 Finalization C 165 reinforced polymer composite of standard lighting columns 111 Milest. 60.60.0000 EN 54-2 Fire detection and fire alarm EN 54-2:1997 2006-10-18 2007-12-04 1999-04-30 M/109 systems - Part 2: Control and CEN WI 00072001 Review 111 C 290 indicating equipment Milest. 90.92.0000 EN 54-2:1997/A1:2006 2006-10-25 2007-12-04 2007-12-31 M/109 CEN WI 00072044 Finalization C 290 of standard 111 Milest. 60.60.0000 EN 54-2:1997/AC:1999 1999-02-25 2007-12-04 M/109 CEN WI 00072C05 Finalization C 290 of AC 191 Milest. CEN - Construction sector Snapshot of the current situation for Standards to be cited in the OJ under the 2015-04-03 Page 4 CPR Standard English title Linked Work Item Last Official DOW Man Realized Journal 60.60.0000 EN 54-2 prEN 54-2 rev Fire detection prEN 54-2 rev 2014-08-21 2017-12-27 M/109 and fire alarm systems - Part CEN WI 00072120 Proposal 2: Control and indicating and decision equipment on WI 111 Milest. 10.99.0000 EN 54-3 Fire detection and fire alarm EN 54-3:2001 2014-07-23 2005-06-08 2003-10-31 M/109 systems - Part 3: Fire alarm CEN WI 00072002 Withdrawal C 139 devices - Sounders 111 Milest. 99.60.0000 EN 54-3:2014 2014-07-23 2018-07-23 M/109 CEN WI 00072102 Finalization of standard 121 Milest. 60.60.0000 EN 54-3:2014/prA1 2014-11-10 2017-05-01 M/109 CEN WI 00072123 Proposal and decision on WI 121 Milest. 10.99.0000 EN 54-4 Fire detection and fire alarm EN 54-4:1997 2009-04-22 2005-06-08 2009-08-31 M/109 systems - Part 4: Power CEN WI 00072003 Review 111 C 139 supply equipment Milest. 90.92.0000 EN 54-4:1997/A1:2002 2002-12-04 2003-07-16 2005-12-31 M/109 CEN WI 00072034 Finalization C 165 of standard 111 Milest. 60.60.0000 EN 54-4:1997/A2:2006 2006-08-23 2006-12-13 2009-08-31 M/109 CEN WI 00072039 Finalization C 304 of standard 111 Milest. 60.60.0000 EN 54-4:1997/AC:1999 1999-02-25 2005-06-08 M/109 CEN WI 00072C06 Finalization C 139 of AC 191 Milest. 60.60.0000 Fire detection and fire alarm prEN 54-4 rev 2013-09-09 2017-01-11 M/109 systems - Power supply CEN WI 00072110 Proposal equipment and decision on WI 111 Milest. 10.99.0000 EN 54-5 Fire detection and fire alarm EN 54-5:2000 2009-04-22 2005-06-08 2003-06-30 M/109 systems - Part 5: Heat CEN WI 00072014 Review 111 C 139 detectors - Point detectors Milest. 90.92.0000 EN 54-5:2000/A1:2002 2005-10-19 2002-12-20 2005-06-30 M/109 CEN WI 00072042 Review 121 C 320 Milest. CEN - Construction sector Snapshot of the current situation for Standards to be cited in the OJ under the 2015-04-03 Page 5 CPR Standard English title Linked Work Item Last Official DOW Man Realized Journal 90.93.0000 EN 54-5 Fire detection and fire alarm FprEN 54-5 rev 2014-09-09 2016-02-26 M/109 systems - Part 5: Point heat CEN WI 00072119 Consensus detectors building and consolidation 121 Milest. 30.99.0979 EN 54-7 Fire detection and fire alarm EN 54-7:2000 2009-04-22 2005-06-08 2003-06-30 M/109 systems - Part 7: Smoke CEN WI 00072016 Review 111 C 139 detectors - Point detectors Milest. using scattered light, 90.92.0000 transmitted light or ionization EN 54-7:2000/A1:2002 2002-06-19 2002-12-20 2005-06-30 M/109 CEN WI 00072043 Finalization C 320 of standard 121 Milest. 60.60.0000 EN 54-7:2000/A2:2006 2006-07-05 2006-12-13 2009-07-31 M/109 CEN WI 00072046 Finalization C 304 of standard 111 Milest. 60.60.0000 FprEN 54-7 2015-01-30 2016-07-18 M/109 CEN WI 00072118 Consensus building and consolidation 121 Milest. 30.99.0979 EN 54-10 Fire detection and fire alarm EN 54-10:2002 2009-10-28 2006-12-13 2004-07-31 M/109 systems - Part 10: Flame CEN WI 00072006 Review 111 C 304 detectors - Point detectors Milest. 90.92.0000 EN 54-10:2002/A1:2005 2005-11-23 2006-12-13 2007-08-31 M/109 CEN WI 00072036 Finalization C 304 of standard 121 Milest. 60.60.0000 EN 54-11 Fire detection and fire alarm EN 54-11:2001 2006-10-18 2006-12-13 2003-11-30 M/109 systems - Part 11: Manual CEN WI 00072005 Review 111 C 304 call points Milest.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    96 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us