PROJECT : Masonry Stone Mine (Quarry project) PRE - FEASIBILTY REPORT APPLICANT : Mr. SATHYAN C . 1 PRE – FEASIBILITY REPORT (PFR) ENVIRONMENTAL ENGINEERS & CONSULTANTS PVT. LTD. Owner November , 2016 Mr. SATHYAN C. PROJECT : Masonry Stone Mine (Quarry project) PRE - FEASIBILTY REPORT APPLICANT : Mr. SATHYAN C. 2 INDEX S. No. Contents Page No. 1.0 EXECUTIVE SUMMARY 4 2.0 INTRODUCTION OF THE PROJECT / BACKGROUND INFORMATION 6 2.(i) Identification of project and project proponent 6 2.(ii) Brief description of the Nature of the project 6 2.(iii) Need for the project and its importance to the Country and or Region 6 2.(iv) Demand – Supply Gap 7 2.(v) Imports Vs. Indigenous Production 7 2.(vi) Export Possibility 7 2.(vii) Domestic / Export Markets 7 2.(viii) Employment generation (Direct & Indirect) due to the project 8 3.0 PROJECT DESCRIPTION 8 3.(i) Type of project including interlinked and interdependent projects 8 3.(ii) Location (map showing General Location, Specific Location & Project boundary & 8 Project site layout) with coordinates 3.(iii) Details of Alternate sites considered and the basis of selecting the proposed site, 9 particularly the environmental considerations 3.(iv) Size or magnitude of operation 9 3.(v) Project description with process details (a schematic diagram / flow chart showing 9 the project layout, components of the project etc should be given) 3.(vi) Raw material required along with estimated quantity, likely source, marketing area 12 of final products, mode of transport of raw materials and financial provisions 3.(vii) Resource optimization / recycling and reuse envisaged in the project 13 3.(viii) Availability of water its source, energy / power requirement & source 14 3.(ix) Quantity of wastes to be generated (liquid and solid) and scheme for their 14 management / disposal 4.0 SITE ANALYSIS 15 4.(i) Connectivity 15 4.(ii) Land form, land use and land ownership 15 4.(iii) Topography (along with map) 16 4.(iv) Existing land use pattern (agriculture, non-agriculture, forest, water bodies 16 (including area under CRZ)), shortest distances from the periphery of project. 4.(v) Existing Infrastructure 17 4.(vi) Soil Classification 17 4.(vii) Climatic Data 17 4.(viii) Social Infrastructure Available 17 5.0 PLANNING BRIEF 18 5.(i) Planning Concept (Type of industries, facilities, transportation etc.) Town & 18 Country Planning / Development Authority Classification 5.(ii) Population Projection 18 5.(iii) Land Use Planning (Break-up along with green belt etc.) 18 5.(iv) Assessment of Infrastructure Demand (Physical & Social) 18 ENVIRONMENTAL ENGINEERS & CONSULTANTS PVT. LTD. Owner November , 2016 Mr. SATHYAN C. PROJECT : Masonry Stone Mine (Quarry project) PRE - FEASIBILTY REPORT APPLICANT : Mr. SATHYAN C. 3 5.(v) Amenities / Facilities 19 6.0 PROPOSED INFRASTRUCTURE 19 6.(i) Industrial Area (Processing Area) 19 6.(ii) Residential Area (Non-processing area) 19 6.(iii) Green belt 19 6.(iv) Social Infrastructure 19 6.(v) Connectivity (Traffic & Transportation Road / Rail etc.) 20 6.(vi) Drinking Water Management (Source & Supply of water) 20 6.(vii) Sewerage system 20 6.(viii) Industrial Waste Management 20 6.(ix) Solid Waste Management 20 6.(x) Power Requirement & Supply / Source 20 7.0 Rehabilitation and Resettlement (R & R Plan) 20 7.(i) Policy to be adopted (Central / State) in respect of the project affected persons 20 including home oustees, land oustees and landless 8.0 PROJECT SCHEDULE AND COST ESTIMATES 21 8.(i) Likely date of start of production and likely date of completion (time schedule for 21 the project will be given) 8.(ii) Estimated project cost along with analysis of economic viability of project 21 9.0 ANALYSIS OF PROPOSAL 21 9.(i) Financial and Social Benefits with special emphasis on the benefits to the local 21 people including tribal population LIST OF ANNEXURES Annexure No. Particulars 1. Copy of Mine Lease / Letter of Intent (LOI) 2. Photographs of the Site 3. Route Map showing location of the project site 4. Google map showing location of the project site 5. Key map of the project site 6. Topographical Contour Map 7. Production & Development Plan 8. Surface cum Geological Plan LIST OF TABLES Table No. Particulars 1. List of employees 2. Size or magnitude of operation 3. List of equipments used 4. Year wise production details 5. Land use of lease area 6. Social infrastructure around the project site 7. Expected time schedule for the project 8. Estimated project cost and economic viability ENVIRONMENTAL ENGINEERS & CONSULTANTS PVT. LTD. Owner November , 2016 Mr. SATHYAN C. PROJECT : Masonry Stone Mine (Quarry project) PRE - FEASIBILTY REPORT APPLICANT : Mr. SATHYAN C. 4 1.0 EXECUTIVE SUMMARY The building Stone Quarry (Minor Mineral) mining project of Mr. Sathyan C. is situated at Survey Nos. 270/2-1, 270/2-2, 270/2-3 & 270/4, Block No. 18, Malayalappuzha Village, Konni Taluk, Pathanamthitta District, Kerala in an area of 1.4730 hectares. The project proponent posses a Letter of Intent for an area of 1.4730 hectares issued by Mining & Geology Department, Govt. of Kerala. Mining projects of minor minerals with area less than 50 ha. of mining lease are categorized as category 'B'. As per O.M. dated 24/12/2013 by Ministry of Environment & Forests, Govt. of India, all projects with mining area less than 25 hectares is classified as Category B2. The Eco-friendly Mining Plan prepared by an Indian Bureau of Mine (IBM) approved Recognized Qualified Person (RQP) has been approved by Mining & Geology Department, Govt. of Kerala . This Mining plan is based on the requirements under the Kerala Minor Mineral Concession Rules, 2015. The land for the proposed quarry is a private owned land and the land is possessed in the name of Mr. Sathyan C. The targeted production of mine will be 40,000 MTA. The estimated project cost will be Rs. 1 Crores. The expected life of mine estimated will be of about 5 years. The mining operation will be carried out by opencast semi-mechanized method as per the approved Mining Plan. 1.1 SALIENT FEATURES & ENVIRONMENTAL SETTING OF THE PROJECT Particulars Details Geographical Location Latitude (N) 09°16'38.47" to 09°16'43.72" Longitude (E) 76°49'54.69" to 76°50'00.03" Total Mine Lease area 1.4730 hectare Total area owned by the proponent 3.2477 hectare Current status of the quarry Existing Quarry Project Local name of the project area Iramba thodu Project Site Toposheet No. 58C/15 Production 40,000 MTA Geological Reserves 5,78,490 MT Mineable Reserves 1,93,648 MT Life of Mine About 5 years Estimated project cost Rs. 1 Crores Man Power 18 persons Highest and lowest elevation 142 m MSL to 97 m MSL Land use Private land with Rocky land Nearest habitation Nearest house is about 128m towards N side. ENVIRONMENTAL ENGINEERS & CONSULTANTS PVT. LTD. Owner November , 2016 Mr. SATHYAN C. PROJECT : Masonry Stone Mine (Quarry project) PRE - FEASIBILTY REPORT APPLICANT : Mr. SATHYAN C. 5 Nearest Town Pathanamthitta, 8 km, SW Stone Crusher / M sand Available near the complex Other quarries within 500m radius No quarry in operation within 500m radius Width of access road to the site 7m tarred road towards Nearest Airport Trivandrum Airport, 120 km, S Nearest Highway Main Eastern Highway, 6 km, W Nearest Railway Station Chengannur Station, 40 km, NW Power supply The total power requirement will be 75 kW for compressors which will be operated by Diesel Engine. Water and its Source The total water requirement is about 5 KLD in which 1 KLD is for domestic which would be sourced from open well, 2 KLD for dust suppression system in mine and 2 KLD for plantation will be sourced from storm water pond Nearest Hospital / dispensary Pothiyappadu PHC, 5 km, E Education facility Elakkulam, 1.50 km, NE Police Station Malayalappuzha, 2.50 km, NW Fire Station Pathanamthitta, 7.50 km, SW Ambulance Muthoot Hospital, 7 km, SW Church / temple / mosque Marthoma Church, Karinkuttikkal, 800m, SW Malayalappuzha Devi Temple, 2 km, NW Mylapra Juma Masjid, 6 km, SW Electrical installation like transformer HT & LT Line – Karinkuttikkal 500m, S /HT or LT line ( available at site for own use) Mobile Towers Malayalappuzha, 2 km, N Ecological sensitive zone (National None within the study area Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve) Interstate Boundary None within the study area Critically Polluted Area as identified None within the study area by CPCB Defense installations None within the study area Archeological Features None within the study area Nearest Forests Vadassery Kara Teak Forest, 7 km, N Nearest streams/ rivers/ water bodies Kallar River, 6 km, E (from mine boundary) Achankovil, 4 km, S Storm water pond, 50m, S HLWG Report status Not falling in ESA 1.2 PRODUCTION & RESERVE The estimated annual mining production will be 40,000 MTA and the mineable reserve for the project is 1,93,648 MT. It is expected to employ about 18 persons in the mining operation. The mined material will be transported to a crusher located within complex. ENVIRONMENTAL ENGINEERS & CONSULTANTS PVT. LTD. Owner November , 2016 Mr. SATHYAN C. PROJECT : Masonry Stone Mine (Quarry project) PRE - FEASIBILTY REPORT APPLICANT : Mr. SATHYAN C. 6 1.3 TOP SOIL & OVER BURDEN A total quantity of 2,422 cu. m. of topsoil is proposed to be removed during the mining operations. The topsoil excavated from the quarry will be dumped / stacked separately at pre-determined place and subsequently will be utilized in spreading over reclaimed areas for plantation as part of eco-restoration. About 8,217 cu. m. of overburden (OB) will be generated throughout the mine life. This waste will be utilized within the pit for lying of haul roads. At the end use, OB can be reutilized as soil base for plantation.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages30 Page
-
File Size-