Tehri Dam Project

Tehri Dam Project

TEHRI DAM PROJECT CALL NO TITLE PAGE NO. 1 Design Reports Issued for Tehri Dam Project 1 2 Tehri Dam project Documents/Volume 10 3 Memoranda/Notes on Tehri Dam Project put up to board of Consultant 15 4 Notes Memos prepared on Tehri Dam Project 31 5 Prequalification submission on Tehri Dam Project 60 6 fVgjh fu;a=.k ifjÔn cSBd dh lwph 81 7 Test Report for Tehri Dam Project 91 8 Tehri Dam Project Agreement 100 9 Tehri Miscellaneous 110-192 10 Tehri Dam Project Reports submitted by M/S Technoprom Expert (TPE) 120 11 Reports submitted by Geological Survey of India for Tehri Dam Project 130 1 DESIGN REPORTS ISSUED FOR TEHRI DAM PROJECT CALL NO ACC. NO. TITLE NO. ISSUED BY DATE OF ISSUE REMARK DRT/1 2682 Tehri Dam Project subsurface DDC-1/84/1 Dam Design circle I Sept 1984 Investigation DRT/2 1720 Tehri Dam Project Foundation DDC-1/84/2 ,, ,, Treatment DRT/3 1715 Tehri Dam Project - Dam Section DDC-1/84/3 ,, ,, and its analysis DRT/4 2683 Tehri Dam Project – Spillway DDC-1/84/4 ,, ,, Hydraulic design DRT/5 2684 Tehri Dam Project – Instrumentation DDC-1/84/5 ,, ,, DRT/6 2678 Tehri Dam Project – Test for DDC-1/84/6 ,, ,, Assessing suitability of core and Filter material for the Dam DRT/7 1713 Tehri Dam Project – Hydrology DDC-1/84/1 Spillway design circle Oct. 1984 DRT/8 2685 Tehri Dam Project – Tehri Dam Design Report Irrigation design Oct. 1984 Project water Conductor System organization Roorkee DRT/9 2680 Tehri Dam Project – Power house Design Report ,, Oct. 1984 Complex DRT/10 2676 Tehri Dam Project – Test IDO-DDC-1/85/1 ,, Oct. 1984 Embankments DRT/11 2675 Tehri Dam Project – Height of U/S IDO-DDC-1/86/1 ,, March. 1986 Coffer Dam DRT/12 ----------------------------------------------------------------------------------------------------------------------------------------------------------------------- CALL NO ACC. NO. TITLE NO. ISSUED BY DATE OF ISSUE REMARK DRT/13 2674 Tehri Dam Project – Non-linear Dam Design circle I Irrigation design Dec. 1986 Parameters for shell materials organization Roorkee for the Dam. DRT/14 2668 Tehri Dam Project – Foundation ,, ,, Jan. 1987 Grouting Galleries DRT/15 2671 Tehri Dam Project – Down stream ,, ,, March 1987 Coffer Dam DRT/16 2672 Tehri Dam Project – Spillway ,, ,, May 1987 Type Geometry & Hydraulic Design DRT/17 2673 Exploration and Testing for core ,, ,, June 1987 Material from Koti borrows Area. DRT/18 2688 Exploration and Testing for Shell Dam Design circle I Irrigation design June 1987 Materials from old and new organization Roorkee Dobata Borrow Areas. DRT/19 2669 Tehri Dam Project – Spillway ,, ,, June 1987 Aeration system for Preventing Capitation erosion DRT/20 2590 Estimation of Construction ,, ,, March 1988 pore pressure for Tehri Dam DRT/21 2813 Design concepts for Tehri Dam ,, ,, August 1988 and spillway Appraisal by the Consultant. 2 TEHRI DAM PROJECT DOCUMENT/VOLUME CALL NO ACC. NO. TITLE ISSUED BY YEAR REMARK T.D/1 516 Tehri Dam Project Volume I - Report Tehri Dam organization Dec. 1969 Dehradun T.D/2 515 Tehri Dam Project Volume II – Cost Estimate ,, ,, ,, ,, T.D/3 517 Tehri Dam Project Volume III, Exibits ,, ,, T.D/4 176 Tehri Dam Project Volume IV ,, ,, Geological Reports section I T.D/5 519 Tehri Dam Project Volume VI ,, ,, Geological Reports section II T.D/6 891 Tehri Dam Project Volume I - Report ,, Revised 1997 T.D/7 892 Tehri Dam Project Volume II – Cost Estimate ,, ,, T.D/8 893 Tehri Dam Project Volume III Exibits ,, ,, T.D/9 894 Tehri Dam Project Volume VI, Geological ,, ,, T.D/10 1744 Tehri Dam Project Volume I - Report ,, Revised 1983 T.D/11 1737 Tehri Dam Project Volume II – Cost, Estimate ,, ,, T.D/12 1736 Supplement to Volume II (Financial Statement) ,, Sept 1986 T.D/13 2255 Tehri Dam Project Volume I – Report, (Stage-II) ,, Revised 1984 June 1984 Call No Acc. No. Title Issued by Year Remark T.D/14 2256 Tehri Dam Project Volume II – Cost, Estimate ,, ,, (Stage-II) T.D/15 2606 Tehri Dam Project Volume I - Report ,, Revised 1987 (Stage-II) Oct 1987 T.D/16 2609 Tehri Dam Project Volume II - Cost ,, ,, Estimate (Stage-II) T.D/17 2728 Tehri Dam Project Volume I (Stage-I) ,, Sep 1987 3 MEMORANDA/NOTES ON TEHRI DAM PROJECT PUT TO BOARD OF CONSULTANT CALL NO ACC. NO. VOL TITLE NO. ISSUED BY REMARK BCM/1 1655 Vol-I General /features & lay out Memo # 1 Tehri Dam Design RKE Ist Meeting board of of works Dec. 1973 consultant for Tehri Dam (18-20.12.1973) Hydrology. Dec. 1973 Memo # 2 ,, Design of Dam A. Dec 1973 Memo # 3 ,, BCM/2 1650 Vol-II Diversion Tunnel Dec 1973 Memo # 4 ,, Foundation Treatment for Dam Memo # 5 ,, Dec 1973 Project Investigation. Dec 1973 Memo # 6 ,, BCM/3 1657 Hydrology A. July/Aug 1974 Memo # 2 A ,, IInd Meeting 3-7-71 to 1-8-74 Diversion Tunnel A July/Aug 1974 Memo # 4 A ,, Left Bank Power House-Water Memo # 7 ,, Conductor System July/Aug 1974 BCM/4 2863 Achievements Programe of main civil Memo # 8 Tehri Dam onstruction Works for 1974-75 and bottlenecks. Circle Dehradun July 1974 Not on river closure Scheme & design of first Stage Dam. July/ Aug 1974 BCM/5 1652 Problems of Diversion Tunnels for Note # 1 Tehri Dam organization Ist Meeting 5-12-1979 Tehri Dam. May 1979 Propossed haul Roads for Note # 2 ,, Coffer Dam A May. 1979 CALL NO ACC. NO. VOL TITLE NO. ISSUED BY REMARK Proposal of self Conveyor for Note # 3 ,, Upstream Coffer Dam A May 1979 Design of Dam (Embankment & Note # 4 Dam Design Circle- I Foundation) May 1979. BCM/6 2864 Tehri Power house Complex Location Note # 5 Irrigation department Tehri layout Investigation & Instrumentation Dam design Circle RKE Studies for the selection of spillway Note # Power house design circle - I and Energy dissipator. A May 1979 Note on design of Dam (Embankment Note # 4 Dam Design Circle - I and foundation) May 1979 BCM/7 1653 Layout and design of head race Tunnels Note # 12 Tehri Dam organization 3rd Meeting May 1981 and intake structure May 1981 Note on Materials for Tehri Dam Note # 16 Dam Design circle-I May 1981 Processing of Dobata Borrow Area Note # 19 Tehri Dam Design Circle-I Material for various zones of fill in the Dam. May 1981 Power house Complex. May 1997 Note # 9 Tehri Dam design Cirde Roorkee. Geotechnical Appraisal of the Note # 9 ,, proposed underground Power Adendum house. May 1981 Surge tank – Preliminary Studies Note # 10 Power house design Circle – I Call No Acc. No. Vol Title No Lssued by Remark BCM/8 1654 II Switch yard for underground Note # 11 3rd Meeting May 1981 power house May 1981 Economic studies of penstock Note # 23 Power house design May 1981 Circle I Roorkee (1) Note on Ist Stage Dam (Coffer Dam Design circle-I Dam) May 1981 Roorkee (2) Main Dam Section : Filter design A Note on Stripping of Dam Area. Dam Design circle I May 1981 Roorkee. Diversion Tunnels layout and Note # 7 Tehri Dam orgnization Construction. May 1981 Division Tunnels Lining Design Note # 7 (A) Tunnel Design Circle May 1981 Roorkee. BCM/9 1743 III Closure sequence for Diversion Note # 8 Power house design 3rd Meeting May 1981 Tunnels. May 1981 Circle-I Hydrology. May 1981 Memo # 17 Irrigation design organization Tehri Dam spillway (Hydraulic Note # 18 Dam Design Circle-II design) May 1981 Belt Conveyor for the dam fill Note # 20 ,, May 1981 Spillway Construction 1981 Note # 22 Tehri Dam organization BCM/10 1658 I Provision of Concrete block under Note # 24 Tehri dam organization 5th Meeting May 1982 the impervious core of Tehri Dam CALL NO ACC. NO VOL TITLE NO ISSUED BY REMARK Review of progress & programme Note # 30 ,, For 82-83 Tehri Dam spillway (Hydraulic Note # 18 A Dam design Circle-I design) May 1982 Note on the Procurment of large Memo # 25 Irrigation Research size Rockfill Testing Equipement isstitate Roorkee. for Tehri dam. May 1982 BCM/11 1659 II Subsurface investigation for Tehri Memo # 29 Dam Design Circle-I 5th Meeting May 1982 Dam Review of Progress and future Roorkee Program May 1982 Instrumentation for Tehri dam. Memo # 28 ,, May 1982 Diversion Tunnels Miscellaneous Note # 7 (B) Tunnel Design Circle Point May 1982 Roorkee Layout of intake structure for Memo # 12 (A) Power house design Circle-I H.R.T Power house Complex Note # 27 Tehri Dam design Circle Roorkee Hydrology Gauge discharge Note # 26 Irrigation design curve at outlet portal site & organization Scheme of further Hydrological investigation BCM/12 2867 Review of Progress-Programme 5th Meeting May 1982 for 1982-83 CALL NO ACC. NO VOL TITLE NO ISSUED BY REMARK BCM/13 1660 I Type of surge tank. June 1983 Note # 10 A Power House design 6th Meeting June 1983 Circle II Roorkee. Irrigation outlet. Note # 13 A ,, Design of Main Dam & Ist Memo # 14 A Dam design Circle-I Stage Dam June 1982 Tehri Dam spillway Hydraulic Note # 18 B ,, design June 1982 BCM/14 2069 II Power House Complex June 1983 Note # 27 A ,, 6th Meeting June 1983 Drainage & grouting galleries for Memo no 31 ,, Tehri Dam. June 1983 Test fills for Tehri Dam June 1983 Note # 32 Tehri Dam organization Note on Hydrology (Flood Note # 33 Irrigation design frequency Analysis) June 1983 organization Roorkee Head Race Tunnels design of Note # 34 Tunnel design Circle Concrete lining. June 1983 Note Review of progress and Note # 35 Tehri Dam organization programme works for 1983-84 BCM/15 1661 II ----------------Do--------------- 6th Meeting 1983 BCM/16 2868 I ----------------Do--------------- See call no. BCM/13 Tehri CALL NO ACC.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    70 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us