BRIEF SUMMARY of the PROJECT Name of the Project: Dadam Stone

BRIEF SUMMARY of the PROJECT Name of the Project: Dadam Stone

BRIEF SUMMARY OF THE PROJECT Name of the Project : Dadam Stone Mining Project (13579949 TPA Stone & 1508883 TPA mineral reject ) situated at Khasra No.-132, Near Village: Dadam, Tehsil- Tosham, District- Bhiwani, Haryana over an area of 48.87ha by M/S Govardhan Mines & Minerals The project site falls in Survey of India Toposheet No. 44 P/13 . As per EIA Notification dated 14 th Sep, 2006 and as amended and as per S.O 2269 (E) dated 01.07.2016 the area is less than 50 ha. Thus the said project has to be apprised as Category “B1” project. The mining lease area of 48.87 ha is a Government Waste land. No forest involved in the mine site. The letter of intent has been issued in favour of M/S Govardhan Mines & Minerals, vide letter DMG/HY/ML/Dadam/2018/5062 dated 11.10.2018 for 10 years. The lease area flat terrain in nature, sloping towards North Eastern. There is no forest land or agriculture land in the mine lease area. At the end of life of mine, total excavated area will be 34.3773 ha in absence of any fill material; entire excavated pit will be converted into a water reservoir. Mining will be carried out through opencast mechanized method include drilling, blasting, loading / un-loading, and transportation. Blasting shall not be permitted within 100 m of surface structure not belonging to owner. Total mineable reserves are 69267352.01 Tonnes. Life of mine is 5.0 years @ 13579949 Tonne production. Total water requirement will be 50.0 KLD which will be brought from nearby villages of grey zone only. The depth of water table is 80 m (Pre-Monsoon) to 78 m (Post-Monsoon) below the surface level. There is no National Park, Wild Life Sanctuaries, Biosphere Reserves, Tiger Reserves, Wildlife Corridors, etc. within 10 km radius. Three reserved forest & three protected forest falls within 10 km radius of the mine leasea area. It was reported by the Project Proponent that there is no court case/ litigation pending against the project and there is no violation of EPA Act. The estimated cost of the project is Rs. 25.0 Crore. .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us