Live@ WINDEUROPE 2019

Live@ WINDEUROPE 2019

Launch simulation and optimization solution for Onshore Wind. Please visit our stand 1-C41 4 April 2019 LiVE @ WINDEUROPE 2019 Live longer and prosper TRENDING ON offshore, say financiers Offshore wind developers must place Teamwork essential a greater focus on what happens to LIVE@ WE 2019 projects at the end of their lifetimes when looking to secure finance. p2 Consortium to search for EU for greening of grid wind health and safety harmony The European Commission has chosen Wind industry players system operators to drive and DSOs need to “work Poland to pull trigger on a consortium led by Eclareon, The and transmission system infrastructure development hand in hand” to develop 2.5GW onshore tender Renewables Consulting Group and operators must collaborate and utilise existing assets technological solutions and The Polish government is to fire WindEurope to explore health, safety more effectively to ensure more efficiently, she added. “not compete at the interface”. the starting gun on an up to 2.5GW and environment best practice. The electricity grids can handle Associations including Additionally, he said it onshore wind tender later this year. ‘wind harmony’ study will examine an upcoming surge in WindEurope and politicians is crucial for industry to p3 alignment of HSE standards from new renewables capacity, also have a big role to play communicate convincingly construction, through O&M to WindEurope 2019 has heard. to encourage and facilitate the importance of decommissioning, covering both Key sector figures told important conversations. “If decarbonisation to the THE INTERVIEW onshore and offshore sites. delegates on day 2 that time we have the right business general public. “We have to is running out to organise case the technology will win the hearts and minds of UK insurer offers renewables sufficiently to deliver on 2030 follow,” Silva said. the people,” Foley said. Today, Acciona Energy chief executive risk tool targets. “There is no showstopper “They need to see a Rafael Mateo. p4 UK insurer CLS Risk Solutions “Ten years is tomorrow today in terms of what connection between plugging has launched a new product at when you need to innovate technology can do to achieve in an electric vehicle and WindEurope 2019 that will protect around (network) technology,” a very high penetration of how that actually manifests against interruptions to renewable said GE Grid Solutions chief renewables.” in terms of wind power and energy construction projects caused technology officer Vera Silva. Mark Foley, chief executive solar power on the system by third-party interventions such as TSOs need to co-operate of Irish transmission system to make that decarbonised judicial reviews. internally and with distribution operator Eirgrid, said TSOs world work for them.” Siemens Gamesa unveils 5MW Slice and dice solution for giant blades onshore newbie Splitting blades into two in the 1990s involving a Siemens Gamesa has launched a new pieces is emerging as a 60-metre segmented blade 5MW onshore turbine platform and potentially viable solution to showed production costs is offering two variants to the market. overcome logistical challenges would rise by 15% to 20% but The 5.X series will initially be available posed by the rise of giant logistical savings would only as 5.8MW units with a 155-metre or turbines. be 5%, he said. 170-metre rotor. The process of so-called However, that situation is blade segmentation would now changing as turbines get Wind council online insights allow companies to save on bigger. The Global Wind Energy Council has Digital diet for offshore O&M transport costs while reducing Korsgaard added there is launched a new market intelligence Data-crunching is at the heart of the need for expensive no limit to how long blades platform offering online insights and flagship European Union-funded factory expansions, LM Wind could become. analysis of the global wind industry research project aiming to take the Power senior director John “It’s not a technical to its members. Information includes sting out of offshore wind farm Korsgaard told WindEurope challenge. It’s more a financial WALKING THE WALK: blade wind energy statistics, market outlooks, maintenance bills. p5 2019. A study by the company challenge.” production Photo: LM Wind Power country profiles and policy updates. Maximum transparency for wind turbines with PC-based Control Hall 3, booth C51 LiVE @WINDEUROPE 2019 4 April 2019 02 Live longer and prosper Day 3 highlights offshore, say financiers Offshore wind developers costs. Northam warned will have to accept power A just cause must place a greater focus that pressure on project purchase agreements. In European policymakers set out how the unstoppable on what happens to projects revenue lines would intensify 2017, for example, companies clean energy revolution could deliver opportunities for all. at the end of their lifetimes, as governments move from around the world purchased Auditorium 1, 09.00-10.15 WindEurope 2019 has heard. offering subsidies towards over 460 terawatt-hours of Financiers are increasingly auction-based systems and renewable energy. Whizz kids looking at the latter stages of ultimately to a zero-subsidy “We see that demand Schoolchildren aged 10-15 will build and test model asset life to get more bang for world. Extending the life of growing. So increasingly a PPA turbines in a small wind tunnel with the best team their buck as subsidy support projects could help offset that strategy will be instrumental winning a prize. fades, according to Green pressure, he said. and in fact integral in getting Hall 1, 09.00-17.00 Investment Group head of Additionally, developers projects financed,” he said. Europe Edward Northam. Poster art “It is no longer all about Subsidy-free wind world A chance to view posters, commemorate this year’s capital costs upfront and award winners and meet with all poster presenters to building-stage operations needs new PPA paradigm discuss findings. and maintenance,” he said. A larger pool of off-takers procurement lead Marc Oman. Luxua-Level 3, 10.00-10.45 “It’s increasingly about willing to sign long-term Vattenfall head of portfolio what happens at the back power purchase agreements and transactions Danielle Europe’s next chapter end, evaluating things like is needed before subsidy-free Lane said the wind industry Get insight on market developments in Germany, France, repowering and other wind development becomes needs to look to “innovative Poland, Italy and Lithuania as EU member states work to alternatives.” the global norm, delegates solutions in all markets” to adopt National Energy and Climate Plans. Several large-scale offshore heard on day 2. lock guaranteed power prices Luxua 1, 10.45-12.00 wind projects are approaching “At Google we now into long-term deals. the end of their lives with the consume eight terawatt-hours “There has got to be a Tomorrow’s world rate of decommissionings of renewable energy a year broader system for PPAs A look at opportunities arising from innovations driving set to increase. Repowering but Facebook, Google, Apple that can help developers the wind industry towards higher levels of connectivity is, however, emerging as a and Amazon (alone) can’t access different portions and autonomous operations. realistic alternative thanks to drive the transition,” said the of the market like domestic Auditorium 1, 15.00-16.15 falling offshore development search company’s energy consumers,” she said. A CABLE WORLD FIRST FOR OFFSHORE ARRAYS Our 66 kV inter-array cables allow twice as much power to be transported in comparison to their 33 kV equivalent. This means fewer cables enter the offshore substation and larger turbine unit power reduces the number of turbines needed, enabling significant cost reductions. Visit us at WindEurope to find out more – Hall 1, stand C42 www.prysmiangroup.com LINKING THE POWER OF NATURE WITH FUTURE ENERGY DEMANDS LiVE @WINDEUROPE 2019 4 April 2019 03 Romania eyes CfD to fuel 1.3GW wind surge Poland to pull Romania is considering be financed via a Contracts sources by 2030 with an adding an extra 1.3GW of for Difference-style support interim target of 24% by 2020. wind capacity in the next mechanism. Nagy-Bege said the longer- decade, WindEurope 2019 A further 1GW of solar and term goal is “not very the trigger on has heard. 750MW of hydro are also challenging” given the potential Energy Authority vice included in the proposal, he renewables boost. “If we are president Zoltan Nagy- added. proposing another 3GW by 2.5GW Bege said the country’s Romania is currently aiming the end of 2030 I think our onshore energy minister is mulling a to meet 28% of its energy target… will be much closer to tender this year proposal for new projects to consumption from renewable or even higher than 32%.” The Polish government is to is working on an act that fire the starting gun on an creates a subsidy system and up to 2.5GW onshore wind regulatory framework for tender later this year. offshore wind and we expect Janusz Gajowiecki, chief to see it soon.” executive of national wind The government is energy association PWEA, said targeting around 4.6GW of the capacity will make the offshore capacity by 2030 and country “one of the largest the first projects are expected N149/5.X building sites for onshore to be commissioned between wind in Europe”. 2022 and 2025. Projects with final building A partnership between HIGHLY FLEXIBLE SITEABILITY permits and grid connection Equinor and Polenergia has agreements will be eligible to some of the most advanced 5 MW+ POWER OUTPUT bid in the auction, which will plans for development, UP TO 17 % HIGHER AEP offer support for 15 years. Przybylski said. 5.X “Around 1GW secured Equinor’s new energy MW prices of €47 per megawatt solutions hour at the last auction in division vice November, making wind president of the most competitive form Pal Eitrheim of power generation in the told reNEWS country,” Gajowiecki said on on the day 2 of WindEurope 2019.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    5 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us